PIC: 1
PRIMARY FAILURE
Pin hole leakage from
tube no. 01 of 11th Eco
Coil (Module 06)
PIC: 1
SECODARY FAILURE
Secondary damage of
tube no. 02 of 11th Eco
Coil (Module 06)
PICTURE: 2
fuxe / DAMODAR VALLEY CORPORATION
Attached
NA
14 joints
Thorough physical inspection of joints to be carried in
overhauling of the unit.
Thorough physical inspection of joints to be carried in
overhauling of the unit.
PIC: 1
RIMARY FAILURE
44
40 43
41 42
PIC: 1
CODARY FAILURE
43 44
42
41
40
Cause Codes of Boiler Tube Failures
Sno
Main Cause Auxiliary Cause
* Incorrect circulation
*Steam Blanketing
*Incorrect Alloy
1 DD -Defect,Design
*Thermal Stress-Expansion retricted
*Porosity-slag inclusions
*Over Penetration
2 DW- Defect Welding *Lack ofadequate Bonding
*Cracks-inadequate stress relieving
*Caustic Attack
*Hydrogen Fatigue
4 IC- Internal Corrossion *Oxygen Attack
*Stress Corrossion cracking
*No details given
*Sootblower Erosion
*Flue gas Erosion
5 ED - External Deterioration *Steam Impingement
*Flame Impingement
*External Corrossion