1/28/2018 Log Book From 21-01-2018 To 27-01-2018

Log Book From 21-01-2018 To 27-01-2018

Num. Date Day Log/Activity


21-01-
1 Sunday Non-Working Day.
2018

Reported at Main Office (Eco Business Park I, Kempas.) A short briefing about
Proli Group company background and introduced to Proli staff by HR executive,
Ms Donna.

Discussed job scope with Contract Manager, Ms Wong. The project that I will
be involved is 100 Units of Mix Housing Development by Daiwa Sunway
(Sakura Residence), which is based at Sunway Iskandar, Johor.

22-01- A short explanation on the project by Mr Wong. This project adopts


2 Monday
2018 prefabrication technology from Japan where steel frame will be erected as the
main structure of the houses and wall panels (consist of cement boards) will be
inserted between the columns of the house.

Assigned to complete list of drawings for Daiwa House's progress report and
sort out construction activities into categories (Architectural Works, Structural
Works, M&E Works).

Read and study drawings for Daiwa House Project.

http://its.utm.my/itsv4/print_log.php?start=21-01-2018&end=27-01-2018&id=A15BE0061&prgid=11881 1/6
1/28/2018 Log Book From 21-01-2018 To 27-01-2018

Num. Date Day Log/Activity

Reported at the site of the project, Sunway Iskandar. Joined in their daily
Toolbox Meeting which led by the Safety Officer, Ms Sheril.

Further explanation of the project by Project Manager, Mr Chuah. The project


was abandoned for some time. 2 units of Showhouse and 5 units of foundation
works were done by the previous contractor. Proli will complete the project by
splitting it into 2 phases, where the first phase is to build 39 units of buildings
(including the previous job done) while the second phase is to build 61 units of
buildings. This project is a mix housing development where it consists of
building bungalows, semi-d houses, cluster houses, a community centre, guard
house and TNB.

Site Observation:

Excavation works at Unit 18


Setting out at Unit 17
Marking for wall panels on ground floor slab at Unit 2
Installation of doors and windows frame at Unit 3

23-01- Assisted site engineer in marking for wall panels.


3 Tuesday
2018
Recorded site daily report and delivery orders for the material used at the site.

Figure 1: Site Surrounding

http://its.utm.my/itsv4/print_log.php?start=21-01-2018&end=27-01-2018&id=A15BE0061&prgid=11881 2/6
1/28/2018 Log Book From 21-01-2018 To 27-01-2018

Num. Date Day Log/Activity

Joined in daily toolbox meeting at 8 a.m.

Site Observation:

Excavation works at Unit 18


Setting out at Unit 17
Marking for wall panels at Unit 4
Inspection of structure frame verticality for Unit 3 first floor.
Installation of roof frame by JB Progress.

Assisted site engineer in marking at Unit 4.

Recorded site daily report and delivery orders of the materials used at the site.

24-01-
4 Wednesday
2018

Figure 2: Marking for wall panels

5 25-01- Thursday
2018 Joined in daily toolbox meeting at 8 a.m.

Site Observation:

Excavation works at Unit 18


Inspection works for setting out at Unit 17
Inspection works for verticality of frame and columns, alignment of wall
panels and bolt tightness for steel frame at Unit 3 first floor.
Installation of door and window frame at Unit 3.

Learned and observed project manager in preparing and revising work schedules
for the project.

Learned to check verticality of frame and columns from Daiwa House Staff.

Assisted site engineer in marking works at Unit 4.

Observed safety officer performed safety induction to visitors and workers.

Helped to do file labelling for site records.

Recorded site daily report and delivery orders for the materials used at the site.

http://its.utm.my/itsv4/print_log.php?start=21-01-2018&end=27-01-2018&id=A15BE0061&prgid=11881 3/6
1/28/2018 Log Book From 21-01-2018 To 27-01-2018

Num. Date Day Log/Activity

Figure 3: Checking bolt tightness for bungalow first floor

Figure 4: Checking on verticality of column

http://its.utm.my/itsv4/print_log.php?start=21-01-2018&end=27-01-2018&id=A15BE0061&prgid=11881 4/6
1/28/2018 Log Book From 21-01-2018 To 27-01-2018

Num. Date Day Log/Activity

Joined in daily toolbox meeting at 8 a.m.

Site Observation:

Excavation and levelling work at Unit 18


Setting out at Unit 17
Inspection of verticality alignment and bolt tightness for Unit 3 first floor
Installation and checking of door and window frame by YKK
Installation of steel columns at Unit 2

Learned from Clerk of Work about the process of inspection for each work
performed.

Assisted site engineer in checking the verticality and alignment of columns and
wall panels.

Recorded site daily report and delivery orders for materials used at the site.
26-01-
6 Friday
2018

Figure 5: Erection of steel columns

http://its.utm.my/itsv4/print_log.php?start=21-01-2018&end=27-01-2018&id=A15BE0061&prgid=11881 5/6
1/28/2018 Log Book From 21-01-2018 To 27-01-2018

Num. Date Day Log/Activity

No toolbox meeting today.

Site Observation:

Installation of columns and wall panels at Unit 2


Setting out at Unit 17
Timber profile at Community Centre
Adjustment of verticality of columns and wall panels at Unit 3
Inspection of verticality, alignment and bolt tightness at Unit 3 first floor
Inspection of setting out at Unit 17

Recorded site daily report and delivery orders for materials used at the site.

27-01-
7 Saturday
2018

Figure 6: Erection of wall panels

Company Supervisor Signature

___________________________