171L0097 - Construction of 1 Stry/2CL School Building with Toilet and Handwashing Facility at
Mabicay Elementary School Bldg-2 (SCH. ID. 192013), Mabicay, Sogod, Southern Leyte
LOGO
UG-17 Cityland dela Rosa Condo, dela Rosa St. Pio del Pilar, Makati City
Telefax No. (053) 382 – 3294 Cellphone No. 09979208352
Email ad: _______________
ARVIN QUINTERO
Construction Foreman
RAFAEL DALIDA
HEAVY EQUIPMENT
OPERATORS / HELPERS
DRIVERS / HELPERS
LEADMAN MASONS
AUTO MECHANICS LEADMAN CARPENTERS
ELECTRICIANS LEADMAN STEELMAN
CONSTRUCTION METHODS
OUTLINE OF NARRARIVE DESCRIPTION
I. INTRODUCTION
TEMPORARY FACILITIES
• Prior provision of temporary facility, location must at least 20 M. away from transmission lines and at 6
M. away from cliffs
• Prior tapping into a power supply line, check electrical connections and layouts to avoid possible short
circuit connections
• Wire size or wire diameters must be checked to avoid possible overload of the electrical system.
PROJECT BILLBOARD / SIGNBOARD
• Billboards must be of standard size and formats as specified on the provided plan
• Billboards / Signboards shall be positioned visible to passing pedestrians and vehicles.
OCCUPATIONAL SAFETY AND HEALTH PROGRAM
• The Site Engineer / Foreman shall conduct daily tool box meeting concerning safety and health issues
prior start of work
• Basic PPE’s such as; Hard Hat, Safety Vest, Safety Shoes, and Working Gloves must be worn at all times
on site
• Provision of Fist Aid Kit and medicines will be provided on the work area.
CLEARING AND GRUBBING
• Boundary of the project shall be determined prior beginning of clearing and grubbing
• All surface objects and all trees, stumps, roots and other protruding obstruction, not intended to remain
shall be cleared
• In areas outside of the grading limits of cuts and embankments, stumps and non-perishable solid objects
shall be cut-off not more than 150mm above the ground line.
STRUCTURE EXCAVATION
• Prior beginning of excavation, contractor shall check for possible embedded utilities coordinating with
LGU
• Prior structure excavation, provision of batter boards is required with height of at least 60 cm from NGL
provided leveled and shall be at right angle on every corner
• Foundation depth and wall footing depths / dimension shall be in conformity to the provided plans.
EMBANKMENT – FROM BORROW
• Embankment materials shall be provided as approved by the Project Engineer and must be accepted in
accordance with the contract and which can be compacted in a manner approved in this item
• Lines and grades must be determined prior embankment
• Embankment and backfills must be free from deleterious matters
• Embankment will be compacted in satisfy density requirement.
SITE DEVELOPMENT
• Boundary of the project or affected area(s) must be predetermined to avoid encroachment prior
clearing
• Lines and grades as provided by the plans must be observed during the excavation and embankment
period
• Deleterious materials shall be removed from the area, all surface objects and all trees, stump, roots, and
other protruding obstructions, not intended to remain shall be cleared
• In areas outside of the grading limits of cuts and embankments, stumps and non-perishable solid objects
shall be cut-off not more than 150mm above the ground line.
STRUCTURAL CONCRETE
• This item shall be in conformity to specifications stipulated on the DPWH Standard Specifications for
Highways, Bridges and Airports. Concrete class shall conform specifications provided on the plan
• Prior casting of concrete, verify dimensions (cross section and height) of the member intended to be
casted
• Check placement, spacing & bar diameter of the reinforcements prior concrete casting, quantity
intended for a structural member shall be in conformity to specifications provided in the plan
• Concrete shall be placed as near as possible to its final position to prevent segregation, concrete shall
not be dropped more than 1.5 M
• Vibration shall be sufficient duration to provided thorough compaction of cement and shall be done 15
to 16 second interval on a structural member, vibration more than specified is not advisable
• Concrete should be cured immediately after final placement, specifically during the first 7-days
• Removal of Forms and Falseworks shall commence when concrete has attained the desired compressive
strength
• Minimum time for curing and removal shall be as follows; provided no load will be applied on the
structural member
Before reaching 80% of its desired strength.
TYPES OF STRUCTURE MIN. TIME
Centering, Girders, Beams, Frames 14 days
Walls 1 day
Column 2 days
REINFORCING STEEL (DEFORMED)
• Grade of reinforcing steel shall be conformity to the specifications stipulated on the plan
• Reinforcement shall be free from dirt, detrimental rust, loose scale and other foreign materials
• Structural member’s reinforcement shall be placed and spaced in accordance to plans and specifications
• Splicing shall be in conformity plan, lap splice will be placed as to satisfy sufficient minimum clear
distance of 1/3 the maximum size of coarse aggregates between the splice and nearest adjacent bars
• Use gauge 16 tie wires in typing reinforcements.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION VIII
OFFICE OF DISTRICT ENGINEER
Southern Leyte District Engineering Office
Maasin City
CONSTRUCTION METHODS
CONSTRUCTION METHODS
Approved by:
Position Date