One third fuels of the core of a PWR are removed and replaced with fresh fuels
approximately one and half year (18months). For a nominal 1,000 PWR plant, each
reload requires about 48,000kg of 4.4w/o enriched UO2. If the feed to enrichment
plant is natural uranium, and the tails assay is 0.15 w/o,
(2-1) How much feed is required per reload?
(2-2) How much would the enrichment cost at the price of $200 per kg SWU?