esign Calculations For Alqibla Project ZONE ZONE

M1
PUMPSTATION INPUT DATA sewage system

sewage data
GL= 3.15 M HOUSES 540 NO
INLET PIPE= 0.7 M #CAP/HOUSE NOW 10 CAPITA
INV PIPE= 0.04 M Qav. /Cap 0.46 M3/DAY
NO. PIPE 1 NO year 25
n= 0.011 DESIGN PERIOD n= 0.011 YEARS
pipe length 22 m ∆POP% 0.03
min. slope = 0.0012 PF 0.9
storm data
SCREEN CHAMBER Atotal= HA
LENGTH= 2 m i= mm/hr
WIDTH= 2 m streat area = m2
BASE OFFSET UNDER INLET PIPE = 0.25 m green area= m2
DISTANCE BETWEEN WETWELL= 3 m buildings area= m2
BASE THIKNES= 0.3 m C=
WALL THIKNESS= 0.3 m
ROOF THIKNESS= 0.25 m
HEAL WIDTH= 0.8 m
WT= 2 m

NOTES:
esign Calculations For Alqibla Project ZONE ZONE
M1
PUMPSTATION HYDRAULIC CALCULATION sewage system
DISCHARGE CALCULATIONS:
POPULATION:
p= 11,306.40 capita @ 2043
Qavg= 4,680.85 m3/day
Qpeak= 14,042.55 m3/day
Qinft.= 1,404.25 m3/day
Qtotal peak= 15,446.80 m3/day
0.8

INLET PIPE CALCULATION: d/D=


0.7
Assume slope= 0.0012 m/m
1.000 f(x) = 3.6858974359x^5 - 9.6226689977x^4 + 9.4267191142x^3 - 3.7918851981x^2 + 0.8107837995x - 0.0005769231
assumeDia= 0.7 m 0.6
0.900
Cross Section Area= 0.38465 m
0.800 0.5
Hydaulic Radius = 0.0961625 m
Vfull= 0.66 m/sec 0.700
0.600 0.4 d/D
Qfull= 0.25 m3/sec

/D
Polynomial (d/D)

xisd
Qparial=Qtotal peak= 0.18 m3/sec 0.500

A
0.3
Qpartial/Qfull= 0.709 0.400
d/D= 0.615 0.300 0.2
Vactu./Vfull= 3.7958690643 0.200
Vactu.= 2.49 m/sec 0.100 0.1
Pipe INV at up= 0.04 m 0.000
Pipe INV at down= 0.0136 m 0
0 0.2 0.4 0.6 0.8 1 1.2
DEPTH OF WATER IN PIPE= 0.4308487506 m
Axis q/Q

NOTES: ELEVATION
* OF PIPE INV. IN MANHOLE
ELEVATION
** OF PIPE INV. IN WETWELL
esign Calculations For Alqibla Project ZONE ZONE
M1
PUMPSTATION HYDRAULIC CALCULATION sewage system
DESIGN OF COARSE SCREEN
Qavg = 4680.85 m3/day
Quantity of Screenings = Qavg x 30 / 1000000
= 0.1404 m3/day v/V
Provide storage for 7 days
Quantity of Screenings 7 x =Quantity of Screenings per day 0.8

= 0.983 m3 0.7
Number of Storage Units = 1
f(x) =0.68.5400170782x^5 - 20.8540633992x^4 + 18.4069175549x^3 - 6.6666012798x^2 + 1.1170400749x - 0.0033015862
Quantity per Unit = 0.983 m3
Dimension of screen basket in front of inlet pipe 0.5
L = 1.50 m
W = 1.00 m 0.4

H = 0.50 m 0.3
Volume = 0.750 m3 0.983 m3 MUST DAILY CLEENING
Dimension of screenings trough 0.2

L = 1.50 m 0.1
W = 1.00 m
D = 0.50 m 0
0 0.2 0.4 0.6 0.8 1 1.2
Volume = 0.750 m3 > 0.983 m3 error
Screen Design
Bar Size Bs = 10 mm
Clear Opening Co = 25 mm

NOTES:
Efficiency Coefficient Ef = Clear Opening Vmax= 1 m/ses
Clear Opening + Bar size Vmin= 0.3 m/sec
Sewer Pumpstation Design Calculations For Alqibla Project ZONE ZONE
M1
PUMPSTATION HYDRAULIC CALCULATION sewage system

= 0.71
Clear area through each scree AQpeak= Qpeak /Vmax

A= 0.097 M2 0
DEPTH OF WATERIN SCREEN= 0.25 M 0
WIDTH OF SCREEN= 0.39 M v/V 0
Number of Openings= 16 OPEN
NO OF BAR= 15 BAR X 1 CM THIK
USE
L = 1.50 m
W = 1.00 m
H = 0.50 m
Volume = 0.750 m3

q/Q 0 0.10 0.20 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1

v/V 0 0.10 0.20 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.05
NOTES: d/D 0 0.05 0.07 0.09 0.11 0.15 0.2 0.24 0.32 0.4 0.5 0.7
Sewer Pumpstation Design Calculations For Alqibla Project M1
PUMPSTATION HYDRAULIC CALCULATION

WEIGHT OF TANK
ROOF ELEV= 3.65 m
length of pipe= 22 m
Sump Elv.= -2.2364 m
WALL HIGH= 5.6364 m
Volume of walls= 13.52736 m
volume of base= 2.52 m
volume of roof= 0.6 m
weight of tank= 41.6184 T
SUBMERCY VOLUME= 24.10928 m3
up ward force = 236.270944 kn
= 23.6270944 T
EXTENSION VOLUME= 2.496 m3
weigh of extention= 6.24 T
DOWN WARD FORCE= 35.3784 T NO FLOATING
Sewer Pumpstation Design Calculations For Alqibla Project M1
PUMPSTATION HYDRAULIC CALCULATION
WETWELL INPUT DATA
Length of tank= 3 m
Width of tank= 3 m Fitting type Quantity K factor Total K factor
GL= 3.15 m 90º Elbow 4 0.5 2
dist.sump from INP= 2.25 m Tee 1 1.7 1.7
WALL THIKNESS= 0.3 m Reducer 0 0.7 0
BASE THIKNES= 0.3 m Gate Valve 1 0.2 0.2
ROOF THIKNESS= 0.25 m Check valve 1 2 2
pump high 1 m
pump width= 0.8 m TOTAL K= 5.9
MIN WATER high= 1.000 m
PUMPING VELOCITY= 0.25 m3/SEC
force main pipe materials 140
force main pipe LENGTH= 500 m
OUTLET STRUCTURE SUMP 2 M
# CHECK VALVE= 1 NO
#GATE VALVE= 1 NO
# BEND= 4 NO
1
#TEE = 1 NO
# PUMPS= 2 NO
HEAL WIDTH= 0.8 M
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

FIND DEPTH OF WELL

Top roof Level= 3.65 m A 5D 4


Sump Level= -2.2364 m a 2.5D 2
Depth = 5.8864 m B 0.75D 0.6
C 0.3D - 0.5D 0.32
D 0.8
FIND WEIGHT OF TANK Hmin S+C 1.25
h 2.5D
volume of base= 3.888 m3 S 0.9
volume of walls= 5.29776 m3 W  2D 1.6
tanke volume= 9.18576 m3 w 2D 1.6
weight of tank= 22.9644 ton X  5D 4
pressure under tank= 0.849 ton/m2 Y  4D 3.2
FIND FORCE MAIN DIA. Z1  5D 4
SAY D= 0.30 m Z2  5D 4
AREA= 0.07 M2  0 – 10 degrees

V= 2.53 M/SEC
FIND TDH Qp = individual pump capacity, m3/s
HS= 4.24 M Cu = unit conversion coefficient = 0.935
HM= 0.02 M D = outside diameter of pump bell/volute, m
HF= 8.32 M S = height from lowest pumping level to pump bell/volute, m
TDH= 12.57 M

hf=(10.67�^1.85)/(�^1.85�^4.87)xL
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

SELECT PUMPS
#PUMPS= 2
Q MAX= 15446.805 m3/day
Q MAX= 350.000 m3/HR
Q MAX= 5.833 m3/MIN
Q MAX= 0.097 M3/SEC
TDH= 12.573 M

TOTAL Q= 0.0972222222 M3/SEC


Q STEP= 0.03 M3/SEC/STEP
QM3/SEC CALC TDH CAPRARI SULZER GRUNDFOS Q M3/HR
0.03 4.561 18.7 15 20 108
0.06 5.359 16 13 19 216
0.09 6.592 13 12 17 324 8.5 KW
0.12 8.234 10.5 9 12 432 18 A
0.15 10.267 6.7 8 8 540
0.18 12.678 3.5 7.5 4 648
0.21 15.458 0 7 3 756
0.24 18.597 0 6 1 864
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

TRY CAPRARI TRY


SYSTEM SULZER
CURVE
21

18.5

16

f(x) = - 21628.3202394302x^4 + 11819.5847362508x^3 - 2017.5715488214x^2 + 67.536976912x + 14.3839285714


TDH M

13.5

11

8.5

6
0 0.05 0.1 0.15 0.2 0.25 0.3

Q M3/SEC

CALC TDH CAPRARI SULZER


Polynomi a l (SULZER) GRUNDFOS

3.5
3
2.5
2
1.5
1
0.5
0
-0.5882518519
-0.5
-1
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

CHECK PUMP
3.5
HEAD= 12.57317977 M 3
Q= 0.0972222222 M3/SEC
2.5
Q= 5.8333333333 M3/MIN
Q= 350 M3/HR 2
Q= 8400 M3/DAY 1.5
PUMP HIGH= 1 M 1
OPERATION CYCLE= 15 0.5
LWD= 1 M 0
DETENSTION TIME= 4 MIN -0.5882518519
ACTIVE VOLUME= 5.8333333333 M3 -0.5 WLMIN
WELL CROSS AREA= 9 M3 -1
ACTIVE DEPTH= 0.6481 M 0
-0.2
LWL= -1.2364 M
-0.4
MAX WL= -0.588 M -0.6 P WL
WATER IN PIPE LEVEL 0.44 M -0.8
d/D LEVEL= 0.5386 M -1 0.0
-1.2 WLMAX
PIPE CROWN LEVEL= 0.7136 M
-1.4
HOUSE CONNECTION SUMP LEVEL= 2.35 M
DEEPUST DEPTH OF NET WORK= 3.14 M P WL PINV WLMAX WLMIN
0.4 0.0136 -0.588251852 -1.2364
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
STRUCTUR CALCULATION FOR HDPE
Loading Information Load Class Pl, lb
Fill height above top of pipe H 49.2 in 1.25 m Field Equipment 10,000
Water height above top of pipe Hw 0 in 0 m H15 12,000
Soil Density gs 120 lbs/ft3 1.92 t/m3 H20 16,000
Vehicle Load on pipe (NEH 636, 52-7 Pl 10000 lbs 5 t
Impact Factor (NEH 636, 52-8) If 1 converter unte
Pressure from the fill above the pipe Ps 3.41754156 psi 2.402769502 t/m2 from to factor
Hydrostatic pressure above the pipe PG 0 psi 0 t/m2 in m 0.0254
Vacuum pressure in the pipe (0 to 5 p Pv 0 psi 0 t/m2 lbs/ft3 t/m3 0.01601846
Wheel Load Felt by the pipe Pw 1.34825273 psi 0.947915482 t/m2 lbs t 0.0005
Total External Pressure on pipe P 4.76579429 psi 3.350684983 t/m2 psi t/m2 0.7030695783
Pipeline Information (Solid Wall HDPE) in2 m2 0.000645
Input nominal diameter of Pipe 11.8 in 0.3 m lb/ft t/m 0.00147636
Input Standard Dimension Ratio SDR 17 KPA T/M2 0.101972
Input the Pipe Pressure Rating PR 2.4 psi 1.687366988 t/m2 lbs T 0.0005
Pipe Modulus of Elasticity, short te E 110000 psi 77337.65361 t/m2 FT M 0.3048
Pipe Modulus of Elasticity, long ter Elong 22000 psi 15467.53072 t/m2
Section Modulus, (Pipe Wall Moment Ipw 0.00011092 in4/in
Input Pipe Wall Thickness t 0.11 in 0.002794 m
Input Pipe Outside Diameter OD 12.0310236 in 0.305588 m
Pipe Inside Diameter ID 11.8110236 in 0.3 m
Mean Diameter Dm 11.9210236 in 0.302794 m
Actual Pipe Wall Area Aapw 0.11 in2/in 0.00007095 m2/m
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
Wall Crushing
Thrust in Pipe wall Tpw 344.02 lb/ft 0.51 t/m
Required Wall Area (long term) Apw 0.04 in2/in 0.00 m2/m Pipe wall will not crush
Actual Pipe Wall Area Aapw 0.11 in2/in
Deflection (%DX/D<=7.5% for pipes other than spillway conduits)
Deflection Lag Factor (NEH 636, 52-1 DL 1.00
Bedding Constant (NEH 636, 52-11 [0 K 0.10
Modulus of soil reaction (see table E' 400.00
Deflection %DX/D 1.13 % Deflection is within limits
Buckling
Buckling Factor of Safety (NEH 636, FS 2.50
Water Buoyancy factor (NEH 636, 52 Rw 1.00
Coefficient of Elastic Support (NEH B' 0.66
Buckling Reduction Factor (NEH 636, C 0.90
Wall Buckling Critical Pressure qa 1.24 psi 0.87 t/m2 Buckling will occur!
Pressure Applied by Permanent Loa Pp 3.42 psi 2.40 t/m2
Strain (eall<=5%)
Hoop Strain eh 0.002348 in/in 0.0023477 m/m
Vertical decrease in diameter DY 0.1343 in 0.0034112 M
Flexural Strain ef 0.000036 in/in 0.0000356 M/M
Combined Strain e 0.24 % 0.24 % Pipe Strain is not a problem
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

BEARING CAPACITY OF SHALLOW FOUNDATIONS


Terzaghi Methods
Input
Units of Measurement
SI SI or E

Foundation Information
Shape SQ SQ, CI, CO, or RE
B= 5.2 m
L= 5.2 m
D= 5.3864 m

Soil Information
c= 12.6 kPa
phi = 30 deg
gamma = 180 kN/m^3
Dw = 1.15 m

Factor of Safety
F= 3
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
Unit conversion 1000

Gamma w = 9.8
phi (radians) 0.524

Terzaghi Computations
a theta = 3.35
Nc = 37.16
Nq = 22.46
N gamma = 20.12
gamma' = 170.2
coefficient #1 = 1.3
coefficient #3 = 0.4
sigma zD' = 928.04
W sub f 0

Bearing Capacity
q ult = 28569.82 kPa 2913.3216118644 T/M2
qa= 9523.27 kPa 971.1072039548 T/M2

Allowable Column Load


P= 257.50930447 kN 26.2587387949 TON
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
DOWN WARD FORCE=
volume of base= 8.112 M3
Volume of walls= 23.310144 M3
volume of roof= 3.267 M3
TOTAL VOLUME= 34.689144 M3
WEIGHT OF TANK= 86.72286 TON
WEIGHT OF FITTING = 5 TON

5.8864
SURCHARGE WEIGH= 10 TON
TOTAL WEIGH= 101.72286 TON
BC 3.7619400888 TON/M2 NO COMP. PILE NEED
SUBMERCY VOLUME= 59.691396 M3
up ward force = 59.691396 TON NO BOYANCY CASE
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

SUMMARY SEWAGE

TRANSFORMER SEWER TYPE PUMPS SEWER TYPE


NUMBER NUMBER
MANIFUCTURE MANIFUCTURE
POWER DISCHARGE
HEAD
PRESSUR
GENERATOR SEWER TYPE POWER
NUMBER WHEIGHT
MANIFUCTURE CYCLE
POWER
CABLE SIZE MANIFOLD SEWER TYPE
LENGTH RISER DAIM.
WIDTH LENGTH
HIGH PRESSUR
MATERIAL
NUMBER

FORCEMAINE D SEWER TYPE


LENGTH
PRESSUR
MATERIAL
NUMBER

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
BEAM SPREADSHEET CALCULATIONS
© Copy Write John Andrew P.E. 15 Aug 2010

CASE-A CANTILEVER WITH LOAD AT ANY POINT


Beam Shear & Moment Diagrams
SAMPLE AISC STANDARD WIDE FLANGE BEAMS

BEAM CALCULATION METHOD

Step-1 Type beam load and


properties data under "Input"
below.

Step-2 Excel will, "Calculate"


beam: shear, moment, and
deflection due to the
consentrated load "P" lbs and
the distributed load "w" lbs/ft.
BEAM CALCULATION METHOD

Step-1 Type beam load and


properties data under "Input"
below.

Step-2 Excel will, "Calculate"


beam: shear, moment, and
deflection due to the
consentrated load "P" lbs and
the distributed load "w" lbs/ft.

Notes:
1. Distributed load w can
include the weight of the beam
pluss any additional distributed
load.

2. Do not delete load P when


calculating the moment due to
w and vise versa.

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
Effect of load P only INPUT
Load, P = 10000 lbs 5 ton feet 18 w Ix Sx
Load location in inches, a = 19 in 0.4826 m inches = feet * 12 lb/ft in^4 in^3
Beam span in feet, Lf = 20 ft 6.096 m = 216 W12x40 40 307 51.50
Location in inches from free end, 120 in 3.048 m W12x72 72 597 97.40
AISC Beam Section = W18x60 W12x120 120 1070 163.0
Beam weight per foot, w = 60 lbs/ft 0.0885816 t/m
Beam section modulus about x-x, 108 in^3 0.0017698029 m3 W14x61 61 640 92.10
Section 2nd moment of area about 984 in^4 0.0004095717 m4 W14x283 283 3840 459.0
Modulus of elasticity, E = 29000000 lbs/in^2 42814.44 T/M2 W14x500 500 8210 838.0
Allowable tension/compression str 22000 lbs/in^2 2243.384 t/m2
CALCULATE W16x50 50 659 81.00
Beam span in inches, L = Lf * 12 W16x100 100 1500 177.0
= 216 in 5.4864 m
Right support force, R = P W18x60 60 984 108.00
= 15000 lbs 7.5 t W18x158 158 3060 310.0
Max beam shear force, V = -R W18x283 283 564 6160
= -15000 lbs -7.5 t
b= (L - a) W24x62 62 1560 132.0
= 136 in 3.4544 m W24x250 250 8490 644.0
Moment at x if x > a, Mx1 = - P*(x - a) W24x450 450 17100 1170
= -600000 in-lbs -7.62 t.m
Max moment, Mm = -P*b
= -2040000 in-lbs -25.908 t-m

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION

Beam Deflection due to P only CALCULATE continued


Max beam deflection at x = 0, yMP =
(P*b^2/(6*E*I))*(3*L - b)
= 0.553 in 1.4 CM
Beam deflection at x < a,(P*b^2/(6*E*I))*(3*L
y= - 3*x - b)
= 0.246 in x > a Not OK 0.6 CM
Beam deflection at x = a, ya = P*b^3/(3*E*I)
= 0.441 in 1.1 CM
Beam deflection at x > (P*(L
a, y -=x)^2/(6*E*I))*(3*b - L + x)
= 0.252 in x > a, OK 0.64 CM
Max allowable deflection = L / 360
= 0.600 in 1.52 CM

End Slopes due to P only CALCULATE continued


Beam left end slope, θL = (P*L^2) / (2*E*I)
0.0082 radians 0.468 deg
Beam right end slope, θR = 0
CASE-B CANTILEVER WEIGHT LOAD w LB/FT

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
Effect of beam weight only CALCULATE continued
Total beam weight, W = w * Lf
= 1200 lbs
Right support force, RB = W converter unte
= 1200 lbs from to factor
Max beam shear force, V = RB in m 0.0254
= 1200 lbs lbs/ft3 t/m3 0.01601846
Beam shear force at x, V = - (w/12)*x lbs t 0.0005
= -600 lbs psi t/m2 0.7030695783
Max beam moment, Mm = - (w/12) * L^2 / 2 in2 m2 0.000645
= -116640 in-lbs -17.775936 t/m lb/ft t/m 0.00147636
Moment at x, Mx2 =-((w/12)*x^2 / 2) KPA T/M2 0.101972
= -36000 in-lbs -5.4864 t/m lbs T 0.0005
Effect of beam weight only FT M 0.3048
End Slopes CALCULATE continued
Beam left end slope, θL((w/12)*L^3)
= / (6*E*I)
= 0.0002942977 radians 0.017 deg
Beam right end slope, θR = 0
CASE-C CANTILEVER WEIGHT AND CONCENTRATED LOADS
SET x = L ABOVE FOR MAX MOMENT
Total moment at x if x > a, MxT = Mx1 + Mx2
-152640 in-lbs -23.262336 t/m x > a, OK
Moment stress at x, Fx = MxT / Sx
= 1413 lbs/in^2 993.6716706589 T/M2
Safety Factor at x, SFx = Fa / Fx
= 15.566037736 SFx > 2.00, OK

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION

Effect of beam weight only CALCULATE continued


Beam deflection due to load ((w/12)/(24*E*I))*((3*L^4
w at x, yX = - 4*L^3*x + x^4))
= 0.00148935 in
Max beam deflection due to load w, yMW ((w/12)*L^4)
= / (8*E*I)
= 0.00000350 in
Max allowable deflection = L / 360
= 0.600 in

Total Cantilever Deflection due to beam weight and load P.


Total beam deflection at x if x < a, yX = yA + yB
= 0.248 in x > a, OK
Max beam deflection at free end, yMAX = yMW + yMB
= 0.553 in
Max allowable deflection = Li / 360
= 0.60000000 in
Principal of Superposition
Within the elastic limit the total deflection at a point in a beam is equal to the
sum of the deflections due to all of the apllied loading systems.

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
PUMP DISCHARGE TEST
WELL LENGTH= 4
WELL WIDTH= 3
WELL AREA= 12
DRAWDOWN TEST TI 10 MIN
DISTANCE TRAVEL= 0.27 M
SO V FOR ONE PUMP= 3.24 M3
Q= 19.44 M3/HR
THE BOLD NET WORK Q TEST
WELL LENGTH= 4
WELL WIDTH= 3
WELL AREA= 12
RISING TIME 10 MIN
DISTANCE TRAVEL= 0.08 M
V= 0.96 M3
Q= 5.76 M3/HR= 138.24
Q PEAK= Q* P.F= 414.72 M3/DAY
ADD INFILTERATION =10%QMAX=41.5 M3/DAY

TOTAL ALSAHAFIEEN AREA Q= 456.12 M3/DAY


= 19.005 M3/HR
AND MASFEN TOTAL SEWAGE MAX=28352 M3/DAY

TOTAL= 28808.12 M3/DAY= 1200.338 M3/HR


SO MUST ADD NEW PUMPS

USE 3 PUMP EACH PUM Q=600 WITH HEAD 7 M


FROM DATA SHEET OF PUMP POWER =75 KW
NO NEED NEW GENERATOR OR TRANSFORMER BECAUSE AVILBE ONE IS 165 KVA AS GENERATOR AND 250 KVA
KVA AS GENERATOR AND 250 KVA FOR TRANSFORMER
R/D B/D
0.0152 0.2998
0.021 0.352
0.0319 0.4317
0.0439 0.5035
0.0532 0.5518
0.0605 0.5864
0.0731 0.6404
0.0837 0.6813
0.0923 0.7122
0.1002 0.7387
0.1075 0.7616
0.1141 0.7814
0.1206 0.8
0.1265 0.816
0.1317 0.8289
0.1369 0.8429
0.1421 0.8554
0.1466 0.866
0.1511 0.8762
0.1556 0.8858
0.1595 0.894
0.1638 0.9028
0.1676 0.9103
0.1714 0.9174
0.1751 0.9242
0.1784 0.9298
0.182 0.936
0.1851 0.9411
0.1887 0.9465
0.1918 0.9514
0.1948 0.9558
0.1978 0.96
0.2007 0.964
0.2037 0.9677
0.2066 0.9713
0.209 0.9741
0.2118 0.9773
0.2146 0.9802
0.217 0.9802
0.2197 0.9851
0.222 0.9871
0.2243 0.989
0.2269 0.991
0.2291 0.9925
0.2313 0.9939
0.2334 0.9952
0.2359 0.9965
0.238 0.9974
0.2401 0.9982
0.242 0.9988
0.2441 0.9994
0.2461 0.9997
0.2481 0.9999
0.25 1
0.2519 0.9999
0.2538 0.9997
0.2559 0.9993
0.2577 0.9987
0.2595 0.9981
0.2612 0.9973
0.2629 0.9963
0.2649 0.995
0.2665 0.9937
0.2681 0.9923
0.2715 0.9987
0.2745 0.9847
0.2762 0.9822
0.2776 0.9798
0.2806 0.9741
0.2834 0.9677
0.2862 0.96
0.2887 0.952
0.29 0.9474
0.2912 0.9426
0.2936 0.9314
0.2958 0.9191
0.2979 0.9047
0.2997 0.889
0.3006 0.8794
0.3014 0.8695
0.3028 0.8467
0.3038 0.8203
0.3043 0.7877
0.304 0.7442
0.3033 0.7161
0.3022 0.6834
0.2972 0.5864
0.25 0
h/D V/Vfull Q/Qfull
0.023 0.17 0.001
0.032 0.21 0.002
0.049 0.28 0.005
0.068 0.34 0.01
0.083 0.38 0.015
0.095 0.41 0.02
0.116 0.46 0.03
0.134 0.5 0.04
0.149 0.54 0.05
0.163 0.57 0.06
0.176 0.59 0.07
0.188 0.61 0.08
0.2 0.63 0.09
0.211 0.65 0.1
0.221 0.67 0.11
0.231 0.69 0.12
0.241 0.7 0.13
0.25 0.72 0.14
0.259 0.73 0.15
0.268 0.74 0.16
0.276 0.76 0.17
0.285 0.77 0.18
0.29 0.78 0.19
0.301 0.79 0.2
0.309 0.8 0.21
0.316 0.81 0.22
0.324 0.82 0.23
0.331 0.83 0.24
0.339 0.84 0.25
0.346 0.85 0.26
0.353 0.86 0.27
0.36 0.86 0.28
0.367 0.87 0.29
0.374 0.88 0.3
0.381 0.89 0.31
0.387 0.89 0.32
0.394 0.9 0.33
0.401 0.91 0.34
0.407 0.92 0.35
0.414 0.92 0.36
0.42 0.93 0.37
0.426 0.93 0.38
0.433 0.94 0.39
0.439 0.95 0.4
0.445 0.95 0.41
0.451 0.96 0.42
0.458 0.96 0.43
0.464 0.97 0.44
0.47 0.97 0.45
0.476 0.98 0.46
0.462 0.99 0.47
0.488 0.99 0.48
0.494 1 0.49
0.5 1 0.5
0.506 1 0.51
0.512 1.01 0.52
0.519 1.01 0.53
0.525 1.02 0.54
0.531 1.02 0.55 h/D
0.537 1.02 0.56
1.200
0.543 1.03 0.57
0.55 1.03 0.58
0.556 1.03 0.59 1.000
0.562 1.04 0.6
0.575 1.04 0.62
0.587 1.05 0.64 0.800
0.594 1.05 0.65
0.6 1.05 0.66
0.600
0.613 1.06 0.68
0.626 1.06 0.7
0.64 1.07 0.72 0.400
0.653 1.07 0.74
0.66 1.07 0.75
0.667 1.07 0.76 0.200

0.682 1.07 0.78


0.697 1.07 0.8
0.000
0.713 1.08 0.82 0.000 0.200 0.400 0.600 0.800 1
0.729 1.07 0.84
0.738 1.07 0.85
0.747 1.07 0.86
0.766 1.07 0.88
0.786 1.07 0.9
0.808 1.06 0.92
0.834 1.05 0.94
0.849 1.05 0.95
0.865 1.04 0.96
0.905 1.03 0.98
1 1 1
0.600 0.800 1.000 1.200
D= 0.7
imension Recommended Value Value
A 5D
a 2.5D
B 0.75D
C 0.3D - 0.5D
D
Hmin S+C
h Greater of H or 2.5D

S See Equation 9-1

W  2D
w 2D
X  5D
Y  4D
Z1  5D
Z2  5D
 0 – 10 degrees
 0 – 10 degrees
 10 degrees max.
Qp = individual pump capacity, m3/s
Cu = unit conversion coefficient = 0.935
D = outside diameter of pump bell/volute, m
S = height from lowest pumping level to pump bell/volute, m
BEAM SPREADSHEET CALCULATIONS
© Copy Write John Andrew P.E. 15 Aug 2010

CASE-A CANTILEVER WITH LOAD AT ANY POINT


Beam Shear & Moment Diagrams

Nomanclature
a = load location from left end, in
b = load location from right end, in
E = modulus of elasticity, lbs/in2
Fa = allowable stress, lbs/in2
I = section second moment of area about the horizontal X-X axis, in4
L = beam span in inches
Lf = beam span in feet
M = beam or truss moment, in-lbs
P = concentrated load, lbs
R = support reaction force, lbs
SF = safety factor
Sx = beam section modulus about the horizontal axis, in3
V = beam shear force, lbs
w = beam weight per foot, lb/ft
x = location on beam, in
y = beam vertical deflection under load, in
θ = beam end slope, rad or deg

Ref: http://www.linsgroup.com/MECHANICAL_DESIGN/Beam/beam_formula.htm
SAMPLE AISC STANDARD WIDE FLANGE BEAMS
w Ix Sx
BEAM CALCULATION METHOD lb/ft in^4 in^3
W12x40 40 307 51.50
Step-1 Type beam load and properties W12x72 72 597 97.40
data under "Input" below. W12x120 120 1070 163.0

Step-2 Excel will, "Calculate" beam: W14x61 61 640 92.10


shear, moment, and deflection due to the W14x283 283 3840 459.0
consentrated load "P" lbs and the
distributed load "w" lbs/ft. W14x500 500 8210 838.0

Notes: W16x50 50 659 81.00


1. Distributed load w can include the W16x100 100 1500 177.0
weight of the beam pluss any additional
distributed load. W18x60 60 984 108.00
W18x158 158 3060 310.0
2. Do not delete load P when calculating
W18x283 283 564 6160
the moment due to w and vise versa.

W24x62 62 1560 132.0


W24x250 250 8490 644.0
W24x450 450 17100 1170
Effect of load P only INPUT
Load, P = 15000 lbs feet 18
Load location in inches, a = 80 in inches = feet * 12
Beam span in feet, Lf = 18 ft = 216
Location in inches from free end, x = 120 in
AISC Beam Section = W18x60
Beam weight per foot, w = 60 lbs/ft
Beam section modulus about x-x, Sx = 108 in^3
Section 2nd moment of area about x-x, I = 984 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable tension/compression stress, Fa = 22000 lbs/in^2
CALCULATE
Beam span in inches, L = Lf * 12
= 216 in
Right support force, R = P
= 15000 lbs
Max beam shear force, V = -R
= -15000 lbs
b= (L - a)
= 136 in
Moment at x if x > a, Mx1 = - P*(x - a)
= -600000 in-lbs
Max moment, Mm = -P*b
= -2040000 in-lbs

Beam Deflection due to P only CALCULATE continued


Max beam deflection at x = 0, yMP = (P*b^2/(6*E*I))*(3*L - b)
= 0.830 in
Beam deflection at x < a, y = (P*b^2/(6*E*I))*(3*L - 3*x - b)
= 0.246 in x > a Not OK
Beam deflection at x = a, ya = P*b^3/(3*E*I)
= 0.441 in
Beam deflection at x > a, y = (P*(L - x)^2/(6*E*I))*(3*b - L + x)
= 0.252 in x > a, OK
Max allowable deflection = L / 360
= 0.600 in

End Slopes due to P only CALCULATE continued


Beam left end slope, θL = (P*L^2) / (2*E*I)
0.0123 radians 0.703 deg
Beam right end slope, θR = 0

CASE-B CANTILEVER WEIGHT LOAD w LB/FT


Beam Shear & Moment Diagrams

Effect of beam weight only CALCULATE continued


Total beam weight, W = w * Lf
= 1080 lbs
Right support force, RB =W
= 1080 lbs
Max beam shear force, V = RB
= 1080 lbs
Beam shear force at x, V = - (w/12)*x
= -600 lbs
Max beam moment, Mm = - (w/12) * L^2 / 2
= -116640 in-lbs
Moment at x, Mx2 = -((w/12)*x^2 / 2)
= -36000 in-lbs

Effect of beam weight only CALCULATE continued


Beam deflection due to load w at x, y X = ((w/12)/(24*E*I))*((3*L^4 - 4*L^3*x + x^4))
= 0.014 in
Max beam deflection due to load w, yMW = ((w/12)*L^4) / (8*E*I)
= 0.048 in
Max allowable deflection = L / 360
= 0.600 in

Effect of beam weight only


End Slopes CALCULATE continued
Beam left end slope, θL = ((w/12)*L^3) / (6*E*I)
= 0.0002943 radians 0.017 deg
Beam right end slope, θR = 0

CASE-C CANTILEVER WEIGHT AND CONCENTRATED LOADS


SET x = L ABOVE FOR MAX MOMENT
Total moment at x if x > a, MxT = Mx1 + Mx2
-636000 in-lbs x > a, OK
Moment stress at x, Fx = MxT / Sx
= 5889 lbs/in^2
Safety Factor at x, SFx = Fa / Fx
= 3.74 SFx > 2.00, OK

Total Cantilever Deflection due to beam weight and load P.


Principal of Superposition
Within the elastic limit the total deflection at a point in a beam is equal to the sum of the
deflections due to all of the apllied loading systems.

Total beam deflection at x if x < a, yX = yA + yB


= 0.260 in x > a, OK
Max beam deflection at free end, yMAX = yMW + yMB
= 0.877 in
Max allowable deflection = Li / 360
= 0.600 in

Total Beam Slope at x


Total beam end slope (at x = 0), θt = θA + θB
0.01256 radians 0.72 deg

EXAMPLE: CANTILEVER WITH CONCENTRATED LOAD


EMAMPLE:
Given the cantilever data below calculate the maximum moment and free end
deflection due to load P only. Do not include the weight of the beam.

Load, P = 15000 lbs


Load location in inches, a = 0 in
Beam span in feet, Lf = 18 ft
Location in inches, x = 0 in
AISC Beam Section = W12x40
Beam weight per foot, w = 40 lbs/ft
Beam section modulus, Sx = 51.5 in^3
Section 2nd moment of area about x-x, I = 307 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable tension/compression stress, Fa = 22000 lbs/in^2

The beam data in yellow above is copied and pasted into the "INPUT"
data cells below.

Note: Load location, x = a = 0 inches.


Effect of load P only INPUT
Load, P = 600 lbs feet 10
Load location in inches, a = 100 in inches = feet * 12
Beam span in feet, Lf = 18 ft = 120
Location in inches, x = 50 in
AISC Beam Section = W12x40
Beam weight per foot, w = 40 lbs/ft
Beam section modulus, Sx = 51.5 in^3
Section 2nd moment of area about x-x, I = 307 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable tension/compression stress, Fa = 22000 lbs/in^2
CALCULATE
Beam span in inches, L = Lf * 12
= 216 in
Right support force, R = P
= 600 lbs
Max beam shear force, V = -R
= -600 lbs
b= (L - a)
= 116 in
Moment at x if x > a, Mx1 = - P*(x - a)
= 30000 in-lbs
Max moment, Mm = -P*b
= -69600 in-lbs

Beam Deflection CALCULATE continued


Max beam deflection at x = 0, yM = (P*b^2/(6*E*I))*(3*L - b)
= 0.080 in
Beam deflection at x < a, y = (P*b^2/(6*E*I))*(3*L - 3*x - b)
= 0.058 in x > a, OK
Beam deflection at x = a, ya = P*b^3/(3*E*I)
= 0.035 in
Beam deflection at x > a, y = (P*(L - x)^2/(6*E*I))*(3*b - L + x)
= 0.056 in x < a, Not OK
Max allowable deflection = L / 360
= 0.600 in

CASE-C CANTILEVER FREE TO DEFLECT BUT NOT ROTATE


Beam Shear & Moment Diagrams

Effect of distributed load w only INPUT


AISC Beam Section = W12x72 feet 10
Beam weight per foot, w = 72 lbs/ft inches = feet * 12
Beam span in feet, L = 20 ft = 120
Location in inches, x = 100 in
Beam section modulus, Sx = 97.4 in^3
Section moment area about x-x, I = 579 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable stress, Fa = 22000 lbs/in^2
CALCULATE
Beam span in inches, Li = L * 12
= 240 in
Right support force, R = V = w*L
= 1440 lbs
Max moment is at fixed end, MR = -(w/12)*L^2 / 3
= -115200 in-lbs
Moment at deflected end, ML = (w/12)*L^2 / 6
57600 in-lbs
Moment at x, Mx = (w/12)*(L^2 - 3*x^2) / 6
27600 in-lbs
Moment stress at x, Fx = MxT / Sx
= 283 lbs/in^2
Safety Factor at x, SFx = Fa / Fx
= 77.64 SFx > 2.00, OK

Beam Deflection CALCULATE


Max deflection at x = 0, ym = (w/12)*L^4 / (24*E*I)
= 0.049 in OK
Beam deflection at x, yx = (w/12)*(L^2 - x^2)^2 / (24*E*I)
= 0.034 in
Max allowable deflection = Li / 360
= 0.667 in
End Slopes
Beam left end slope, θL = 0

Beam right end slope, θR = 0

CASE-D CANTILEVER WITH END LOAD


Beam Shear & Moment Diagrams

Input the maximum moment, allowable stress and safety factor below and use the
AISC spreadsheet table to calculate the beam section modulus Sx that will support
the moment M at the allowable bending stress Fa.
Determine Steel Member Section Size based on estimated section modulus Sx
INPUT
Moment in beam, M = 190000 in-lbs
Allowable material stress, Fa = 22000 lbs/in^2
Design Safety Factor, SF = 2.50
CALCULATE
Required beam section modulus, Sx = SF * M / Fa
= 21.59 in^3

Open the AISC Structural Steel Sections spreadsheet or other table.

Select a beam section with a section modulus Sx equal to or a small amount


greater than the required Sx calculated above.

There may be more than one beam section with the required Sx or slightly
larger.

Select Beam Section Sx


INPUT
Select beam from tables = W14x61
Actual beam section modulus, Sx = 92.1 in^3

Determine Member Section Size based on estimated section modulus Sx


INPUT
Max moment in beam, M = 2552000 in-lbs
Allowable material stress, Fa = 22000 lbs/in^2
Safety Factor, SF = 2.5
CALCULATE
Minimum beam section modulus, Sx = SF * M / Fa
= 290.00 in^3

Ref: http://www.linsgroup.com/MECHANICAL_DESIGN/Beam/beam_formula.htm
This is the end of this Worksheet
INVE.inlet
ZONE G.L of street SERVIED AREA ha i mm/hr C
pipe m W2
M1 3.15 76.3 17 0.5 -0.7 0.7
lforcemain LW depth 1 POWER one pump
PIPE Dai m LW depth2 (HEATING) Distance B
length (VOTEX) KW K
1300 1.2 0.3 1 60 1.6 1
MIN. DEPTH FROM
CAST
PIPE TO SUMP AVILBLE CAST WIDTH
LENGTH
(CASTED) L B C J
3 2.25 3 0.6 1.6 0.7 1.6

Axis Title
WIDTH Active depth CHDPE d/D force main area WL GULLY WL STREET
2.40 3.00 140.00 0.90 0.38 2.18 1.05

Q m3/day Q m3/hr Q m3/min Q m3/sec velosity m/sec

155652 6485.5 108.09 1.8015277778 4.7


Vactive WELL AREA m2 WELL LENGTH detention time min
27.02 9.00 4.20 3.00

WLWELL WELL WD FLOOD velosity


1.05 4.00 OK
hammer
hs hm m Hf m TDH m LENGTH
WL RIVER
arrow #PUMP cycle operation CASE WIDTH forcemain dai. 4.45 2.00 Err:520 Err:520 NOT APROFED

@TIDE
pump no Q ump
1
3 20 0.7 0.7
1.5 Qpump m3/hr Qpm3/min WIDTH
m3/sec
3 2161.83
36.03 0.60 OK

LWLwell mwl manhol roof ELV. sump ELV well high


-1.95 0.32 3.65 -2.95 5.8

WELL DIMENSION
ZONE SH1 ZONE SH1
WELL TYPE SEWAGE
SITE DATA 1 SEWAGE DESIGN PARAMETERS 3 SOIL INPUT 4 FORCE MAIN STRUCTURAL 7 STORM DESIGN PARAMETERS SOIL INPUT
GL 3.15 M PF 3 GAMMA WATER 1 T/M3 PIPE COVER 1.25 M GAMMA WATER T/M3
UP IPL@ MANHOLE 0.04 M RF 0.9 GAMMA DRY SOIL 1900 T/M3 SDR 17 GAMMA DRY SOIL T/M3
IPDIA 0.7 M MIN SLOPE 0.0012 C COHESION 12 T/M2 Pipe Pressure Rating 2.4 T/M2 MIN SLOPE 0.001 C COHESION T/M2
# HOUSES 540 NO MAX d/D FOR DN<=250 0.5 ANGLE FRICTION 30 DEG Impact Factor (NEH 636, 1 MAX d/D FOR DN<=250 0.5 ANGLE FRICTION DEG
CAP./HOUSE NOW 10 NO MAX d/D PIPE> DN 250 0.75 SF 3 Pressure from the fill ab 76.3 T/M2 MAX d/D PIPE> DN 250 0.75 SF 3
GR 0.03 MAX Qtotal/Qfull 0.8 Vehicle Load 5 T Hydrostatic pressure ab 0.5 T/M2 MAX Qtotal/Qfull 0.8
DESIGN AGE 25 YEAR #PIPES 1 Vacuum pressure in the pi 17 T/M2 #PIPES 1
CONSUMPTION /CAP 0.46 M3/DAY n 0.011 FORCE MAIN INPUT DATA 5 Wheel Load Felt 0.948 T/M2 n 0.011 FORCE MAIN INPUT DATA
WATER TABLE 2 M FC' 25 T/M2 #PIPE 1 NO Total External Pressure 3.35 T/M2 FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 0.3 M Pipe Pressure Rating 1.789 T/M2 FY 500 T/M2 OD 315 M
LENGTH FROM MANHOLE 22 M ID 0.25 M Elasticity,SHORT TERM 77337.65 T/M2 LENGTH FROM MANHO 22 M ID 0.29 M
HOUSE CONNECT SUMP L. 2.25 M PWALL THICK 0.025 M Elasticity, long term 15467.5 T/M2 HOUSE CONNECT SUMP 2.25 M PWALL THICK 25 M
PUMPS INPU 2 LONGUST LINE LENGTH 2000 M LENGTH 500 M P Inertia) LONGUST LINE LENGTH 2000 M LENGTH 1200 M
QP 350 M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M Outside Diameter M WETWELL DIM W 3M OUT LET ST L 2M
HIGH P 1 M WETWELL DIM LENGTH 3 M VELOCITY 3 M/SEC Inside Diameter M WETWELL DIM LENGTH 3M VELOCITY 3 M/SEC
WIDTH P 0.8 M DEPTH IP INV TO SUMP 2.25 M Mean Diameter M DEPTH IP INV TO SUMP 2.25 M
LWD1 0.5 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA 6 Actual Pipe Wall Area M2 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
LWD2 1 M 2ND JOINT HIGH 3 M LENGTH 2 M M 2ND JOINT HIGH 3M LENGTH 2M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M OUT P DIA M 3RD JOINT HIGH 2M WIDTH 2M
POWER KW DEPTH ROOF AND GRAGE 0.5 M D UNDER IPL 0.25 M POWER KW DEPTH ROOF AND GRA 0.5 M D UNDER IPL 0.25 M
CYCLE 15 NO/HR WALL THIK 0.3 M WALL THIK 0.3 M CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENGHT 0.8 M BASE THIK 0.3 M WEIGHT KG BASE HEAL LENGHT 0.8 M BASE THIK 0.3 M
B LENGTH 1.5 M BASE THICK 0.3 M HEAL LENGTH 0.8 M B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN 1400 NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3 RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
NO. PUMP 2 CONCRETE FC' 25 T/M2 CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M ROOF THICK 0.25 M
LENGTH PIPE MANHO 18 M LENGTH PIPE M 18 M

SUMMARY HWL=
POPULATION ELEVATIONS OF SCREEN TANK TDH FORCE MAIN
POP NOW= 5400.00 CAP. INV PIPE AT SCREEN = 0.02 M #PUMPS= 2.0 NO Crushing Pipe wall will not crush

POPat 25= 11306.40 CAP. SCRN SUMP L= -0.23 M Q PROVIDE= 700.0 M3/HR Deflection Deflection is within limits

Qav. at 25= 4680.85 m3/day W depth AT SCREEN= 0.68 M TDH= 12.6 M Buckling Buckling will occur!
q inf.= 1404.25 m3/day Water L.= 0.45 M CYCLE = 15.0 Strain <=5 Pipe Strain is not a problem
Qpeak= 14042.55 m3/day SCRN ROOF L.= 3.65 M VELOCITY= 2.5 M/SEC

Qtotal flow= 15446.80 m3/day GRAVEL L.= -0.53 M WATER DEPTH 1.6 M

Qtotal flow= 643.62 m3/hr TANK VOLUME= 16.65 M3 WELL VOLUM= 9.2 M3

Qtotal flow= 10.73 m3/min

Qtotal flow= 0.18 m3/sec MWL WELL= 1.0 M

INLET PIPE DESIGN ELEVATIONS OF WETWELL TANK WELL HIGH= 5.6 M


-0.6
NUMBER PIPE 1.00 INV PIPE AT WETWELL = 0.01 M HWL= -0.6 M

Qpartial/Qfull= 0.71 WELL SUMP L= -2.24 M CONTROL d/D=


d/D= 0.62 W depth AT WETWELL= 1.65 M S%= 0.12 na Q ONEPUMP 350 M3/HR
0.80
Vactu= 2.49 M/SEC Water L.= -0.59 M DN= 700 mm PUMP NO= 2 NO
0.60
IN PIP WATER DEPT 0.431 M WETWELL ROOF L.= 3.65 M CYCLE 15 0.40
GRAVEL L.= -2.54 M FMD= 0.25 M 0.20
TANK VOLUME= 34.69 M3 0.00
-0.6
ZONE 0 ZONE 0
WELL TSEWAGE WELL TSTORM

SITE DATA SEWAGE DESIGN PARAMETERS SOIL INPUT SITE DATA SEWAGE DESIGN PARAMETERS SOIL INPUT
GL 3.15 M PF 3 GAMMA WATER T/M3 GL 3.15 M PF 3 GAMMA WATER T/M3
UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3 UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3
IPDIA M MIN SLOPE 0.001 C COHESION T/M2 IPDIA M MIN SLOPE 0.001 C COHESION T/M2
# HOUSES NO MAX d/D FOR DN<=2 0.5 ANGLE FRICTION DEG AREA HA MAX d/D FOR DN 0.5 ANGLE FRICTION DEG
CAP./HOUSE NOW NO MAX d/D PIPE> DN 2 0.75 SF 3 C NO MAX d/D PIPE> D 0.75 SF 3
GR % MAX Qtotal/Qfull 0.8 i mm/HR MAX Qtotal/Qfull 0.8
DESIGN AGE YEAR #PIPES 1 DESIGN AGE YEAR #PIPES 1
n 0.011 FORCE MAIN INPUT DATA n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M FY 500 T/M2 OD 315 M
LENGTH FROM MANH 22 M ID 0.29 M LENGTH FROM M 22 M ID 0.29 M
HOUSE CONNECT SUM 2.25 M PWALL THICK 25 M HOUSE CONNECT 2.25 M PWALL THICK 25 M
PUMPS INPU LONGUST LINE LENG 2000 M LENGTH 1200 M PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M
QP M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M QP M3/HR WETWELL DIM W 3M OUT LET ST L 2M
HIGH P M WETWELL DIM LENG 3 M VELOCITY 3 M/SEC HIGH P M WETWELL DIM L 3M VELOCITY 3 M/SEC
WIDTH P M DEPTH IP INV TO SU 2.25 M WIDTH P M DEPTH IP INV TO 2.25 M
LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
LWL2 M 2ND JOINT HIGH 3 M LENGTH 2 M LWL2 M 2ND JOINT HIGH 3M LENGTH 2M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M OUT P DIA M 3RD JOINT HIGH 2M WIDTH 2M
POWER KW DEPTH ROOF AND GR 0.5 M D UNDER IPL 0.25 M POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENGHT 0.8 M BASE THIK 0.3 M WEIGHT KG BASE HEAL LENG 0.8 M BASE THIK 0.3 M
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3 RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2 CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M ROOF THICK 0.25 M
LENGTH PIPE MANHOLE 18 M LENGTH PIPE M 18 M
ZONE 0 ZONE 0
WELL TSEWAGE WELL TSTORM

SITE DATA SEWAGE DESIGN PARAMETERS SOIL INPUT SITE DATA SEWAGE DESIGN PARAMETERS SOIL INPUT
GL 3.15 M PF 3 GAMMA WATER T/M3 GL 3.15 M PF 3 GAMMA WATER T/M3
UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3 UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3
IPDIA M MIN SLOPE 0.001 C COHESION T/M2 IPDIA M MIN SLOPE 0.001 C COHESION T/M2
# HOUSES NO MAX d/D FOR DN 0.5 ANGLE FRICTION DEG AREA HA MAX d/D FOR DN 0.5 ANGLE FRICTION DEG
CAP./HOUSE NOW NO MAX d/D PIPE> D 0.75 SF 3 C NO MAX d/D PIPE> D 0.75 SF 3
GR % MAX Qtotal/Qfull 0.8 i mm/HR MAX Qtotal/Qfull 0.8
DESIGN AGE YEAR #PIPES 1 DESIGN AGE YEAR #PIPES 1
n 0.011 FORCE MAIN INPUT DATA n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M FY 500 T/M2 OD 315 M
LENGTH FROM M 22 M ID 0.29 M LENGTH FROM M 22 M ID 0.29 M
HOUSE CONNECT 2.25 M PWALL THICK 25 M HOUSE CONNECT 2.25 M PWALL THICK 25 M
PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M
QP M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M QP M3/HR WETWELL DIM W 3M OUT LET ST L 2M
HIGH P M WETWELL DIM L 3 M VELOCITY 3 M/SEC HIGH P M WETWELL DIM L 3M VELOCITY 3 M/SEC
WIDTH P M DEPTH IP INV TO 2.25 M WIDTH P M DEPTH IP INV TO 2.25 M
LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
LWL2 M 2ND JOINT HIGH 3 M LENGTH 2 M LWL2 M 2ND JOINT HIGH 3M LENGTH 2M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M OUT P DIA M 3RD JOINT HIGH 2M WIDTH 2M
POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENG 0.8 M BASE THIK 0.3 M WEIGHT KG BASE HEAL LENG 0.8 M BASE THIK 0.3 M
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3 RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2 CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M ROOF THICK 0.25 M
LENGTH PIPE M 18 M LENGTH PIPE M 18 M
ZONE 0 ZONE 0
WELL TSEWAGE WELL TSTORM

SITE DATA SEWAGE DESIGN PARAMETERS SOIL INPUT SITE DATA SEWAGE DESIGN PARAMETERS SOIL INPUT
GL 3.15 M PF 3 GAMMA WATER T/M3 GL 3.15 M PF 3 GAMMA WATER T/M3
UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3 UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3
IPDIA M MIN SLOPE 0.001 C COHESION T/M2 IPDIA M MIN SLOPE 0.001 C COHESION T/M2
# HOUSES NO MAX d/D FOR DN 0.5 ANGLE FRICTION DEG AREA HA MAX d/D FOR DN 0.5 ANGLE FRICTION DEG
CAP./HOUSE NOW NO MAX d/D PIPE> D 0.75 SF 3 C NO MAX d/D PIPE> D 0.75 SF 3
GR % MAX Qtotal/Qfull 0.8 i mm/HR MAX Qtotal/Qfull 0.8
DESIGN AGE YEAR #PIPES 1 DESIGN AGE YEAR #PIPES 1
n 0.011 FORCE MAIN INPUT DATA n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M FY 500 T/M2 OD 315 M
LENGTH FROM M 22 M ID 0.29 M LENGTH FROM M 22 M ID 0.29 M
HOUSE CONNECT 2.25 M PWALL THICK 25 M HOUSE CONNECT 2.25 M PWALL THICK 25 M
PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M
QP M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M QP M3/HR WETWELL DIM W 3M OUT LET ST L 2M
HIGH P M WETWELL DIM L 3 M VELOCITY 3 M/SEC HIGH P M WETWELL DIM L 3M VELOCITY 3 M/SEC
WIDTH P M DEPTH IP INV TO 2.25 M WIDTH P M DEPTH IP INV TO 2.25 M
LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
LWL2 M 2ND JOINT HIGH 3 M LENGTH 2 M LWL2 M 2ND JOINT HIGH 3M LENGTH 2M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M OUT P DIA M 3RD JOINT HIGH 2M WIDTH 2M
POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENG 0.8 M BASE THIK 0.3 M WEIGHT KG BASE HEAL LENG 0.8 M BASE THIK 0.3 M
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3 RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2 CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M ROOF THICK 0.25 M
LENGTH PIPE M 18 M LENGTH PIPE M 18 M