MINISTRY OF PUBLIC WORKS

Construction, Completion, Furnishing, and Maintenance for Kuwait


International Airport New Passenger Terminal II
SPA/214

Material Submittal Form


Submittal No (ACONEX Ref Number): WBS: Form Issue Date:
MAS-LKW-MPW-000546 05.11.2018
Material Description: FIRE FIGHTING EQUIPMENT Rev: 03
MAKE: NAFFCO - UAE / SFFECO - UAE /
ASSOCIATED ENTERPRISE - SINGAPORE Required on Site Date:
(DETAILS AS PER ATTACHED MATERIAL LIST) 30.11.2018
Discipline: Architectural Civil /Structural Electrical Mechanical ICT Special System Project Wide

Location: Central Plant Building Cleaning and Grabbing Fences Guard Houses IT Building Lab MPW Offices

Road Works Sign Board Terminal Building Utility Corridor Utility Tunnel Water Tank Building Project Wide
Reference Drawing(s): MTT-FSS-DWG-00-900-XX-4250011, MTT-FSS-DWG-00-900-XX-4250012, MTT-FSS-DWG-00-900-XX-4250013

Reference Specification/Section No: 21 11 00, 21 12 00, 10 44 00

Manufacturer Name & Address: Attachments:


NAFFCO FZCO, World Headquarters, Jebel Ali Free Zone, Dubai, UAE Manufacturer/Supplier Data
SFFECO, 2nd Industrial Area, Al-Kharj Road, Riyadh, KSA
ASSOCIATED ENTERPRISE 28 Sin Ming Drive, #01-171/177 Singapore 575702 Test Reports

Certificates (Guarantee, Warranty,


Supplier: FAWAZ, PO BOX 20423, SAFAT, 13065, KUWAIT - NAFFCO-UAE ISO, Test, etc.)
ARABI CO., P.O. BOX No.4090, SAFAT 13041, KUWAIT - ASSOCIATED ENTERPRISE & SFFECO
Material Data Sheet
Mock- Up: YES NO
Sample

LEED Compliance Report


LEED Compliance: YES NO NA

CSI Code: Related LEED Credit:


We certify that the materials submitted herewith have been reviewed and are in conformance with the contract drawings and specification except as otherwise stated.

CONTRACTOR’S APPROVAL
Title Name Signature Date
Prepared by Technical Office Construction
Checked by LEED Coordinator
Reviewed by Material Manager
Checked by QA/QC Manager
Contractor : Received by Engineer:
Date: Date:

Response: MPW Engineer Other…………………………

Review Comments:

Approval Status:

A (Action can proceed) B (Action can proceed subject to the contractor taking necessary action as noted) C (Revise and Re-submit)

R (Rejected)

ENGINEER: Received by Contractor:


Date: Date:

Distribution: MPW Engineer Other……………….

Form No: PSF-QAC-002 Rev.01


Fire Fighting Equipment Samples
1. Pressure Reducing Landing Valve
2. Double Jacket Canvas Hose - 65 mm
3. Branchpipe / Nozzle - 65 mm
4. Hose Cradle
5. Manual Swinging Hose Reel
6. Lock Shield Isolation valve
7. Pressure Reducing valve for Hose Reel
8. 6 Kg Dry Powder Fire Extinguisher
9. 9 Liter Water Fire Extinguisher

1. Pressure Reducing Landing Valve


2. Double Jacket Canvas Hose - 65 mm

3. Branchpipe / Nozzle - 65 mm
4. Hose Cradle

5. Manual Swinging Hoes Reel


6. Lock Shield Isolation Valve

7. Pressure Reducing Valve for Hose Reel


8. 6 Kg Dry Powder Fire Extinguisher (Left)

9. 9 Liter Water Fire Extinguisher (Right)