CX600 Site Survey Guide Internal Use

Application Product
Global Datacomm product
Field Name

Intended Product
Commissioning engineers CX600 V6R1
audience version

Document
Department Datacomm product line V8.2
version

Applicable Revised
CX600 2009-10-20
Product Date

CX600 Site Survey Guide

Drafted by Gao Jikun (48514) Date 2009-10-20

Reviewed by Date

Reviewed by Date

Approved by Date

Huawei Technologies Co., Ltd.

All Rights Reserved

2018-11-28 Huawei Confidential Page 1 of 59


CX600 Site Survey Guide Internal Use

1 Overview

1.1 Version Description

2 Product Introduction

2.1 Introduction ot the CX600-X3

2.2 Introduction to the CX600-X8

2.3 Introduction to User Interfaces

2.3.1 Interface Types Provided by Universal Interface Cards

2.3.2 FPICs

2.3.3 Service Cards of Other Types

3 Site Survey Process

3.1 Preparations

3.1.1 Device Configuration List and Technical Proposal

3.1.2 Required Documents

3.1.3 Required Tools

3.2 Survey Coordination Meeting

3.3 On-Site Survey

3.4 Inspection of the Installation Environment

3.5 Preparing the Site Survey Report

3.5.1 Cover

3.5.2 Networking Diagram

3.5.3 Equipment Room Layout and Cabling Diagram

3.5.4 Survey Datasheet

3.5.4.1Name of Equipment Room

3.5.4.2Environment of Equipment Room

1. Floor Type
2. Height of Antistatic Floor
3. Cabling Modes
4. Height of Equipment Room

2018-11-28 Huawei Confidential Page 2 of 59


CX600 Site Survey Guide Internal Use

3.6 Cabinet Survey Overview


3.6.1 N68E Cabinet Survey
3.6.2 Cabinet Purchased by the Customer and Survey checklist
3.7 Configuration Description of System Power Supply Modules
3.7.7 Instructions on the DC Power Distribution of the CX600-X3 3.7.8
Instructions on the AC power distribution of the CX600-X3
3.7.9 Instructions on the DC Power Distribution of the CX600-X8
3.7.10 Instructions on the AC power distribution of the CX600-X8
3.8 Survey of Power Cables
3.8.1 Configuration Description of Power Cables and Parts for the DC
Power NEPS3000-D (02270059)
3.8.2 Configuration Description of Power Cables and Parts for the DC
Power NEPS5000-D (02270078)
3.8.3 Configuration Description of Power Cables and Parts for the DC
Power NEPS8000-D (02270089)
3.8.4 Configuration Description of Power Cables and Parts for the AC
Power NEPS3000-A (02130606)
3.8.5 Configuration Description of Power Cables and Parts for the AC
Power NEPS5000-A (02314907)
3.8.6 Configuration Description of CX600-X3 Power Cables
3.8.7 Configuration Description of CX600-X8 Power Cables
3.9 Survey of Ground Cables

2018-11-28 Huawei Confidential Page 3 of 59


CX600 Site Survey Guide Internal Use

3.9.1 Configuration Description of the Ground Cable for the N68E Cabinet

3.9.3 Configuration Description of Ground Cables for the CX600-X3

3.9.4 Configuration Description of Ground Cables for the CX600-X8/X16


and EPS200-4850A

3.10 Survey of Fiber Jumpers and Network Cables

3.10.1 Survey of Fiber Jumpers


3.10.2 Survey of Network Cables
3.12 Survey on Other External Cables of the CX600

3.12.1 Configuration Rules for Clock Cables


3.12.2 Configuration Description of the Clock Cables of the CX600

3.12.3 Configuration Description of the Clock Cables of the CX600-X3

3.12.4 Configuration Description of E1/T1 Interface Cables


3.12.5 Configuration Description of E3/T3 Interface Cables
3.12.6 Configuration Description of EPS200-4850A Monitoring Cables
3.13 Cabling Modes and Cabling Racks

3.14 Site Survey Memorandum

4 Inspection of the Installation Environment

4.1 Equipment Room Conditions

4.2 Preparation Guide for Engineering Installation of CX600 Products

4.3 Required Material and Responsibility Division

4.4 Network Consolidation

5 CX600 System Parameters

Appendix: Guide to fill in the survey report

A. Environment of Equipment Room

B. Power cables and PGND power cables

C. Fiber Jumpers and Other Cables

D. Others

2018-11-28 Huawei Confidential Page 4 of 59


CX600 Site Survey Guide Internal Use

1 Overview

1.1 Version Description


This document applies to the site survey fof the CX600 products to be uesed in new projects.
This doc ument can be used with the NetStar site survey module and instructs you in site survey
and project designing. Before reading this document, you need to have basic knowledge of the
CX600. It is assumed that you have read the technical documents and installation guides for
corresponding products. You can obtain these documents from Huawei's technical support
website: http://support.huawei.com.

2 Product Introduction

2.1 Introduction ot the CX600-X3


There are two types of chassis, that is, the chassis with the AC power supply module and the
chassis with the DC power supply module.
The chassis with the DC power supply module of the CX600-X3 is 4 U high and the
dimensions are 442 mm x 650 mm x 175 mm (width x depth x height). The chassis can be
installed in an NE68E cabinet (Huawei BOM codes: 02112685, 02113069, and 02113041) or a 19-
inch cabinet.
The chassis with the AC power supply module of the CX600-X3 is 5 U high and the
dimensions are 442 mm x 650 mm x 220 mm (width x depth x height). The chassis can be
installed in an NE68E cabinet (Huawei BOM codes: 02112685, 02113069, and 02113041) or a 19-
inch cabinet.
The CX600-X3 has two slots for MPUs and three slots for LPUs, two MPUs working in 1:1
redundancy backup mode.
The appearance of the CX600-X3 chassis as following:

2018-11-28 Huawei Confidential Page 5 of 59


CX600 Site Survey Guide Internal Use

Figure 2-1 Appearance of the CX600-X3 DC chassis

Figure 2-2 Appearance of the CX600-X3 AC chassis

2.2 Introduction to the CX600-X8


The chassis of the CX600-X8 is 14 U high, with dimensions being 442 mm x 650 mm x 620
mm (W x D x H). It can be installed in an NE68E cabinet (Huawei BOM codes: 02112685,
02113069, and 02113041) or a 19-inch standard cabinet with a depth of 800 mm.
The CX600-X8 chassis has two slots for SRUs, one slot for the SFU, and eight slots for
LPUs.
The CX600-X8 is basically equipped with two SRUs working in 1:1 redundancy backup
mode and one SFU. Each SRU has an integrated SRU and an integrated SFU. SFUs on the two
SRUs provide 1:1 redundancy, and SFUs on the two SRUs and the SFU on the CX600-X8 provide
2+1 redundancy.
The appearance and components of the CX600-X8 chassis as following:

2018-11-28 Huawei Confidential Page 6 of 59


CX600 Site Survey Guide Internal Use

Figure 2-3 Appearance and components of the CX600-X8 (front view)

1. Air intake vent 2. Rack-mounting ear 3. ESD jack 4.Cabling trough

Figure 2-4 Appearance and components of the CX600-X8 (rear view)

1. Fan module 2. Power filter unit 3. AC power management interface 4. DC power module 5. CMU 6. Handle

2018-11-28 Huawei Confidential Page 7 of 59


CX600 Site Survey Guide Internal Use

2.3 Introduction to User Interfaces


The LPUs of the CX600 provide various types of interfaces, such as POS, CPOS, ATM,
Ethernet, and RPR, E1, E3, and PDH low-speed interfaces for connecting with different network
devices.

2.3.1 Interface Types Provided by Universal Interface


Cards
POS Interface
The router provides unchannelized POS optical interfaces working at a rate of 155 Mbit/s,
622 Mbit/, 2.5 Gbit/s, or 10 Gbit/s. A POS interface supports SDH/SONET and link layer
protocols such as the Point-to-Point protocol (PPP) and High-level Data Link Control (HDLC)
protocol, and can interwork with standard POS interfaces of other vendors.
 Supports the 1 x 10 G POS optical interface line card on the unpluggable optical
module.
 Supports the 1 x 10 G POS optical interface line card on the pluggable XFP optical
module.
 Supports the 4 x 2.5 G, 2 x 2.5 G, and 1 x 2.5 G POS optical interface line cards on the
pluggable SFP optical module.
 Supports the 4 x 622 M and 8 x 622 M POS optical interface line cards on the pluggable
SFP optical module.
 Supports the 8 x 155 M and 4 x 155 M POS optical interface line cards on the pluggable
SFP optical module.

CPOS Interface
The router provides channelized POS interfaces working at a rate of 155 Mbit/s. The 155
Mbit/s CPOS interface can be channelized to E1/T1 and E3/T3. A CPOS interface supports link
layer protocols, such as PPP and HDLC, and can interwork with the channelized POS interfaces of
other vendors.
 Supports the 2 x 155 M CPOS optical interface line cards on the pluggable SFP optical
module.

ATM Interface
The router provides ATM optical interfaces working at a rate of 155M. An ATM interface
supports SDH/SONET and can interwork with ATM interfaces of other vendors.
 Supports the 4 x 155 M ATM optical interface line cards on the pluggable SFP optical
module.

2018-11-28 Huawei Confidential Page 8 of 59


CX600 Site Survey Guide Internal Use

 Supports the 2 x 622 M ATM optical interface line cards on the pluggable SFP optical
module.

RPR Interface
The router provides RPR interfaces working at a rate of GE, 2.5 Gbit/s, or 10 Gbit/s. An RPR
interface supports GE and POS interfaces and RPR and SPR protocols, and is applied to an RPR
network.
 Supports the 1 x 10 G POS RPR optical interface line cards on the pluggable XFP
optical module.
 Supports the 4 x 2.5 G and 2 x 2.5 G POS RPR optical interface line cards on the
pluggable SFP optical module.
 Supports the 4 x GE and 2 x GE RPR optical interface line cards on the pluggable SFP
optical module.

PDH Interface
The router provides PDH low-speed interfaces working at a rate of CE1, CT1, E3, or T3.
CE1 can be channelized to n x 64 K, and n ranges from 0 to 31. CT1 can be channelized to n x 64
K, and n ranges from 0 to 23. A PDH interface supports PDH and protocols such as PPP and
HDLC and frame relay protocols as well. It can also interwork with PDH interfaces of other
vendors.
 Supports the 8 x CE1 or 16 x CE1 RJ45 electrical interface line cards.
 Supports the 8 x CT1 or 16 x CT1 RJ45 electrical interface line cards.
 Supports the 3 x E3 SMB electrical interface line cards.
 Supports the 3 x T3 SMB electrical interface line cards.

Ethernet Interface
The router provides FE, GE, 10 GbE LAN, and 10 GbE WAN interfaces and supports GE
optical interfaces, 1000M/100M/10M auto-sensing electrical interfaces, 10 GbE LAN, and 10
GbE WAN optical interfaces. An Ethernet interface supports standard Ethernet encapsulation and
can interconnect with the standard Ethernet interfaces of other vendors.
 Supports the 1 x 10 GbE LAN optical interface line cards on the unpluggable optical
module.
 Supports the 1 x 10 GbE WAN optical interface line cards on the unpluggable optical
module.
 Supports the 1 x 10 GbE LAN/WAN optical interface line cards on the pluggable XFP
optical module.
 Supports the 2 x 10 GbE LAN/WAN optical interface line cards on the pluggable XFP
optical module.

2018-11-28 Huawei Confidential Page 9 of 59


CX600 Site Survey Guide Internal Use

 Supports the 10 x GE optical interface line cards on the pluggable SFP optical module.
 Supports the 5 x GE optical interface line cards on the pluggable SFP optical module.
 Supports the 24 x GE/FE and 48 x GE optical interface line cards on the pluggable SFP
optical module.
 Supports the 24 x 1000 M/100 M/10 M and 48 x 1000 M/100 M/10 M auto-sensing
RJ45 electrical interface line cards.
 Supports the 16 x FE optical interface line cards.
 Supports the 8 x GE optical interface line cards with the pluggable SFP optical module.
 Supports the 20 x GE optical interface line cards with the pluggable SFP optical module.
 Supports the 40 x GE optical interface line card LPUI-40 with the pluggable SFP optical
module.
 Supports the 40 x GE optical interface line card LPUS-20 with the pluggable SFP
optical module.
 Supports the 40 x 1000M/100M/10M auto-sensing RJ45 electrical interface LPUS-20.
 Supports the 4 x 10 GbE LAN/WAN optical interface line card LPUI-40 with the
pluggable XFP optical module.
 Supports the 4 x 10 GbE LAN/WAN optical interface line card LPUS-20 with the
pluggable XFP optical module.

2.3.2 FPICs
The LPUF-10-based FPICs
 1 x 10 G POS optical interface FPIC on the pluggable XFP optical module
 1 x 2.5 G POS optical interface FPIC on the pluggable SFP optical module
 2 x 2.5 G POS optical interface FPIC on the pluggable SFP optical module
 4 x 2.5 G POS optical interface FPIC on the pluggable SFP optical module
 4 x 622 M POS optical interface FPIC on the pluggable SFP optical module
 4 x 155 M POS optical interface FPIC on the pluggable SFP optical module
 8 x 622 M POS optical interface FPIC on the pluggable SFP optical module
 8 x 155 M POS optical interface FPIC on the pluggable SFP optical module
 8 x FE/GE optical interface FPIC on the pluggable SFP optical module
 4 x 155 M ATM optical interface FPIC on the pluggable SFP optical module
 2 x 622 M ATM optical interface FPIC on the pluggable SFP optical module
 24 x CE1 RJ48 electrical interface line card that is converted from the 24 x CE1 DB100
electrical interface line card through a converter

2018-11-28 Huawei Confidential Page 10 of 59


CX600 Site Survey Guide Internal Use

 24 x CE1 SMB electrical interface line card that is converted from the 24 x CE1 DB100
electrical interface line card through a converter
 24 x CT1 RJ48 electrical interface line card that is converted from the 24 x CE1 DB100
electrical interface line card through a converter
 4 x E3 SMB electrical interface line card
 4 x T3 SMB electrical interface line card
 2 x 155 M CPOS optical interface FPIC on the pluggable SFP optical module
 8 x FE/GE optical interface FPIC (supporting the 1588v2 feature) on the pluggable SFP
optical module

The LPUF-20/21-based FPICs


 1 x 10 GbE LAN/WAN optical interface FPIC on the pluggable XFP optical module
 12 x FE/GE optical interface FPIC on the pluggable SFP optical module
 12 x 1000 M/100 M/10 M auto-sensing RJ45 electrical interface FPIC
 1 x 10 G POS optical interface FPIC on the pluggable XFP optical module
 4 x 10 GbE LAN/WAN optical interface FPIC on the pluggable XFP optical module
 40 x FE/GE optical interface FPIC on the pluggable SFP optical module
 40 x 1000 M/100 M/10 M auto-sensing RJ45 electrical interface FPIC
 48 x 100 M/10 M auto-sensing Delander connector electrical interface FPIC (supporting
the 1588v2 feature)
 1 x 10 GbE LAN optical interface FPIC (supporting the 1588v2 feature) on the
pluggable XFP optical module
 12 x FE/GE optical interface FPIC (supporting the 1588v2 feature) on the pluggable
SFP optical module
 2 x 10 GE + 20 x FE/GE optical interface FPIC (supporting the 1588v2 feature) on the
pluggable SFP and XFP optical modules

The LPUF-40-based FPICs


 2 x 10 GbE LAN/WAN optical interface FPIC on the pluggable XFP optical module
 20 x FE/GE optical interface FPIC on the pluggable SFP optical module
 2 x 10 GbE LAN/WAN optical interface FPIC (supporting the 1588v2 feature) on the
pluggable XFP optical module
 20 x FE/GE optical interface FPIC (supporting the 1588v2 feature) on the pluggable
SFP optical module

2018-11-28 Huawei Confidential Page 11 of 59


CX600 Site Survey Guide Internal Use

An FPIC LPU is composed of a motherboard and FPICs. The LPUF-10, LPUF-20/21, and LPUF-40 are
motherboards. The preceding FPICs can be installed on the motherboard. The FPICs on the LPUF-10, LPUF-
20/21, and LPUF-40 are incompatible. Different types of FPICs on the same motherboard can be randomly
combined.

2.3.3 Service Cards of Other Types


Besides the universal interface LPUs and FPIC LPUs, CX600 support the following types of
SPUs without user interfaces:
 TSUs, the service enhanced line processing units
 NetStream traffic statistics service LPUs
 Universal SPUs

3 Site Survey Process

3.1 Preparations
After receiving the site survey notification, you should read the contract, Technical Proposal,
and networking diagrams, and understand the configuration of the device at each site and the
connection between the devices. If you have any doubt, consult relevant personnel immediately.
After familiarizing yourself with the entire project, contact the customer and plan the survey
meeting to arrange personnel, time, and task assignment.

3.1.1 Device Configuration List and Technical Proposal

Study the Technical Proposal and Device Configuration List to know about the project. If you
have any doubt about the Technical Proposal and Device Configuration List, or the technical
scheme, engineering responsibility definition, project schedule, contact the personnel responsible
for the contract and reach a consensus. The contract or the Technical Proposal may have
incorrectness or miss certain information. You should review whether they are feasible and
operateable using your knowledge about the project. Report the problems found to the marketing
and R&D personnel to revise the technical scheme and contract. This can prevent troubles brought
to the implementation of the project.

3.1.2 Required Documents

Site Survey Notification, and name, telephone number, and contact method of the customer
in charge of the project
Technical Proposal and Device Configuration List
Datacomm Product Site Survey Report

2018-11-28 Huawei Confidential Page 12 of 59


CX600 Site Survey Guide Internal Use

Preparation Guide for Engineering Installation of Datacomm Products


Installation Environment Examination Form

3.1.3 Required Tools

Drawing tools, such as rulers, set squares, propelling pencils, erasers, paper, and tape
measure (longer than 4.5 m)
Laptop computer
Portable printer

3.2 Survey Coordination Meeting


Usually, Datacomm projects are of great significance. Therefore, it is necessary to hold a
survey coordination meeting. The purpose of the meeting is to enable Huawei technical personnel
to talk with the customer's senior executive face to face. In this manner, we can obtain more
understanding and support from them. The forms of meetings vary with various projects. For
ordinary projects and low-level customers, we can have informal discussions with the customer.
For significant, complicated, and high-level projects, support from each department of the
company is required. The meeting can be held as a technical communication meeting.
After arriving at the site, the designing engineers should get in touch with the engineering,
maintenance, network construction personnel of the customer, explain the entire process of project
implementation to them, let them know the preparations and auxiliary facilities, and work out the
project schedule.

3.3 On-Site Survey


Survey the site if it meets the requirements. Submit the requests for auxiliary facilities, such
as power supply, grounding bars, air conditioner, cabling racks, and movable floors to the
customer in advance. Determine the location of the device, cabling routes, and space reserved for
capacity expansion with the customer. You can obtain construction parameters of the equipment
room, distances between equipment rooms, and count of the cores for optical fibers. During the
on-site survey, survey each item carefully according to the contract and site survey report. All data
must be recorded, and assumption based on experiences is unreliable.

3.4 Inspection of the Installation Environment


Besides the on-site survey, you should inspect the installation environment for initial
installation to ensure that the installation requirements are met. Then, fill in the Installation
Environment Examination Form and submit the Preparation Guide for Engineering Installation of
Datacomm Products to the customer, which guides the customer in preparations for the
installation.

2018-11-28 Huawei Confidential Page 13 of 59


CX600 Site Survey Guide Internal Use

3.5 Preparing the Site Survey Report

3.5.1 Cover

Fill in commercial, project, user, and surveyor information. The report should be signed by
the customer representative in the user information column.
Commercial information consists of the customer name, contract number, and quotation sheet
number.
Project information consists of the total number of sites and the number of the sites to be
surveyed this time.
User information consists of the user name, contact person, telephone number, and fax
number.
Surveyor information consists of the name, telephone number, and fax number of the local
office, and the names of the surveyors.

3.5.2 Networking Diagram

Usually, the networking diagram is included in the Technical Proposal. You can obtain the
networking diagram from the marketing team. The customer also has the diagram issued by the
designing institute. You can also obtain the diagram from the customer or the designing institute.
This diagram should cover the devices used in the current project and the existing devices that will
be connected to the new ones, and the networking relations between the devices.
After the survey engineer receives the network diagram from the Marketing Dept, he/she
shall confirm the diagram with the customer first. If the diagram is not consistent with the actual
requirements, the survey engineer shall report the situation to the person responsible for the
contract in time. The engineer shall also revise the configuration list according to the actual
networking requirements and the services to be realized to meet the requirements of users.

3.5.3 Equipment Room Layout and Cabling Diagram

Fill in the cabinet layout with the location of the device specified in the equipment room
layout. This facilitates the review of the site survey, such as whether the side doors and bases are
available.
Write down the usage of the cabinet, for example, "For the CX600-4, CX600-8, or CX600-
16" in the blank odd line; write down the model number of the cabinet, for example, "N68E-22" in
the blank even line.

 New cabinets and existing cabinets are represented in various fonts.


 You can determine the numbers of side doors and bracket suites according to the
equipment room layout.

2018-11-28 Huawei Confidential Page 14 of 59


CX600 Site Survey Guide Internal Use

 New cabinets are represented in bold and existing cabinets are represented in italics.
 If the cabinets in a row are not attached to each other, make a remark in the
cabinet layout or leave a space.

3.5.4 Survey Datasheet

3.5.4.1Name of Equipment Room

In general, use the room number like 506 or 419 to indicate the detailed position where the
equipment room is in a site.

3.5.4.2Environment of Equipment Room

1. Floor Type
The type of the cabinet installation parts depends on the type of floors. Generally, there are
three types of floors: concrete floor, antistatic floor, and antistatic floor with cabinets directly
installed thereon.
For the concrete floor, the cabinet installation parts are expansion bolts.
For the antistatic floor, the cabinet installation parts are supports. Supports are usually
provided by Huawei. If the customer requests to fabricate the supports by itself under the contract,
the requirements for installation dimensions must be met. Make sure that the supports fabricated
by the customer cannot cover the downward cable holes of the cabinets.
For the antistatic floor with cabinets directly installed thereon, the antistatic floor is adopted
in the equipment room but the supports are not needed for cabinet installation. The cabinets are
fixed directly on the floor by bolts. This installation mode is generally used abroad. Huawei does
not recommend this mode. If the floor type is different from any of the previous, choose Other,
and make detailed description.
Pay attention that you shall carefully ask about the design and arrangement of the floor
before the equipment room decoration is completed.
The examples of the three installation modes are as follows:

Cement floor

2018-11-28 Huawei Confidential Page 15 of 59


CX600 Site Survey Guide Internal Use

Antistatic floor

Antistatic floor with cabinets directly installed thereon (not recommended)

2018-11-28 Huawei Confidential Page 16 of 59


CX600 Site Survey Guide Internal Use

2. Height of Antistatic Floor


If the floor is the antistatic floor, fill the height of the antistatic floor in the survey report. Be
sure to go to the place for installing the cabinet and measure the height of the antistatic floor by
yourself. Check whether obstacles such as cables and holes exist under the place reserved for the
cabinet. If yes, report to the customer and help solving the problem to ensure the successful
installation of the cabinet.
The height H1 of the antistatic floor surveyed on site is the vertical distance between the
concrete floor and the upper surface of the antistatic floor. See the following figure.

When determining the floor height, round down the height in a unit of 5 mm. The height of
313 (take 310) and 207 (take 205) cannot appear.
If the antistatic floor does not exist, fill in 0 for the height of the antistatic floor.
3. Cabling Modes
There are two cabling modes: overhead cabling and underfloor cabling. The customer
determines the cabling mode. If the trunk cables, clock cables, power cables and network cables
have different cabling modes, the cabling mode here refer to the cabling mode of the trunk cables.

2018-11-28 Huawei Confidential Page 17 of 59


CX600 Site Survey Guide Internal Use

The cabling modes of other cables must be described respectively in the cabling diagram. For the
overhead cabling, it is necessary to measure the lowest height of cable racks at the position for
installing the cabinet (If the antistatic floor is used in the equipment room, the height is the
distance between the lower surface of the cable rack and the upper surface of the antistatic floor).
Check whether the height of the cabinet in the quotation satisfies the on-site installation
conditions.
4. Height of Equipment Room
The height of the equipment room is the distance between the bottom of the beam or
ventilation pipe of the equipment room and the ground (when the antistatic floor exists, the ground
indicates the upper surface of the antistatic floor).

Note:
During the survey on the floor, you need to know whether the customer has special
requirements for the size of the bolts of the brackets. If the bolts are not of the default
size of Huawei, make a remark in the Survey Datasheet.

3.6 Cabinet Survey Overview


An assembly cabinet is optional. According to customers' requirements, the CX600 can be
installed in an assembly cabinet or in the cabinet provided by the customers, or can be used
without being installed in a cabinet.
The type of the cabinet is determined by the type of the chassis as well as site survey results.
When installing CX600 in the cabinet provided by the customers, please describe the specification
detailed in the survey report to avoid the risk of hard installation.

3.6.1 N68E Cabinet Survey

N68E Cabinet Introduction: The N68E cabinet can be installed on the cement floor or the
antistatic floor in the equipment room. The N6X support is used when the cabinet is installed on
the antistatic floor.
Presently, the N68E cabinet is of only one specification.

Table 3-1 Configuration descrip tion of the CX600’s assembly cabinet


BOM Number Description
NE80E,CR5B2N68E,2.2m Router Assembly Cabinet with Double Swing
02113041
Doors,N68E-22
Dimensions (W x D x H): 46 U high; 600 mm x 800 mm x 2200 mm
Weight: rack ≤ 59 kg; empty cabinet ≤ 100 kg; full configuration ≤ 350 kg
The N68E-22 cabinet adopts the modular structure and provides installing space for the
subrack, server, LAN switch, which facilities capacity expansion and maintenance.

2018-11-28 Huawei Confidential Page 18 of 59


CX600 Site Survey Guide Internal Use

The outside surface of the N68E-22 cabinet is of purplish gray color. The appearance of the
double-door N68E-22 as following figure:

Double-door cabinet N68E figure

Number of N68E cabinets: Fill in the number of N68E-22 cabinets that are installed in this
office. You can know the number from the quotation.
Support of the NE68E cabinet:
1) For the floor type of installing the cabinet on the antistatic floor, when one N68E-22
cabinet is installed separately, two supports are required; when N N68E-22 cabinets, which are
aligned shoulder to shoulder, are installed, 2N supports are required.
N6X supports are classified into:
 N6X of the fixed length
 N6X of the adjustable length
Compo Height of the antistatic Floor
Remarks
nent (mm)
Within this range, no level adjustment of
I 296 to 465
the height can be implemented.

The supports that are of fixed length


during delivery need be customized by
Shorter than 295 or longer than the company. The height of the ESD-
II
465 preventive floor need be surveyed on site
and filled in the site survey report. The
height error should be less than ±5 mm.
Note: The floor height refers to the distance from the upper surface of the antistatic floor to
the cement floor.

2018-11-28 Huawei Confidential Page 19 of 59


CX600 Site Survey Guide Internal Use

2) For the floor type of installing the cabinet on the cement floor, the N68E is directly fixed
to the cement floor. Each NE68E cabinet needs an installation suite.
Side door of the N68E cabinet: Its side doors are embedded on both sides of the cabinet.
When N68E-22 cabinets are aligned shoulder to shoulder, side doors need be surveyed.
Configuration rules for the side doors of the N68E cabinet:
1. When the N68E-22 cabinet is installed separately, one cabinet is equipped with two side
doors.
2. When greater than or equal to two N68E-22 cabinets, which are aligned shoulder to
shoulder, are installed, a total of two side doors are required. The side doors between the two
N68E-22 cabinets are not required.
3. When the N68E-22 cabinet and the N68-22 cabinet are aligned closely, remove the side
door from the N68-22 cabinet. It is because that the side door of the N68-22 cabinet does not
apply to the N68E-22 cabinet. In this case, an additional side door for the N68E-22 cabinet is
needed.
Shockproof Parts and Others:
The Fixing Mount Kit which is used to connect the device with the cabling rack to secure the
device to the top of the cabinet. By default, it is not delivered. It’s delivered according to the site
survey results. N+1 pcs for N cabinets in one row.
The rack shockproof reinforcement component which helps secure the top of the device to
the ceiling or against the wall. By default, it is not delivered. It is delivered according to results of
the site survey. 1 piece for each cabinet.
Remarking the line space between cabinets at survey report or survey system.
Wide wire trough, wire ladder and matching accessories. By default, they are not delivered.
Please remark the width and length of wire trough in details.

 Note:
The installation of blank panels prevents the heat at the air exhaust vent from
reflowing to the air intake vent, and thus ensures heat dissipation of the system. If
you need to install a device in an assembly cabinet of a much larger size, it is
recommended that you install blank panels in the vacant upper part of the cabinet.

Table 3-1 Dimensions of each type of CX600 chassis


Type of Chassis Dimensions (W x D x H)
CX600-16 442 mm x 669 mm x 1600 mm (36 U high)

CX600-8 442 mm x 669 mm x 886 mm (20 U high)

CX600-4 442 mm x 650 mm x 442 mm (10 U high)

CX600-X3 (DC) 650 mm x 442 mm x 175 mm (4 U high)

CX600-X3 (AC) 650 mm x 442 mm x 222 mm (5 U high)

CX600-X8 442 mm x 650 mm x 619 mm (14 U high)

2018-11-28 Huawei Confidential Page 20 of 59


CX600 Site Survey Guide Internal Use

Type of Chassis Dimensions (W x D x H)


CX600-X16 442 mm x 650 mm x 1419mm (32 U high)

A 2.2 M cabinet (02113041) can contain any of the following:

 One CX600-16
 Two CX600-8s (20 U high)
 Four CX600-4s (10 U high)
 Nine CX600-X3s with DC power modules (4 U high)
 Seven CX600-X3s with AC power modules (5 U high)
 One CX600-X16 with DC or AC power modules (32 U high)
 Three CX600-X8s with DC power modules (14 U high)
 Two CX600-X8s with AC power modules (14 U high)

3.6.2 Cabinet Purchased by the Customer and Survey checklist

When the CX600 is installed in the cabinet purchased by the customer (non-Huawei NE68E),
you need to provide detailed parameters of the customer cabinet in written form. If possible,
provide the images. The headquarters can evaluate whether the device installation requirements
are met. You must provide the following information:
 Depth (it is required to be greater than 800 mm), width (it is required to be greater than
600 mm), and height (it is determined according to the number of chassis installed in the
cabinet). For example, the height of one CX600-X16 is 32 U. The height of the
customer cabinet is at least 1800 mm.
 Distance between the rack-mounting ear of the cabinet and chassis and the outside of the
front cabinet door. For example, on the CX600-X8 and CX600-X16, the distance
between the rack-mounting ear of the cabinet and chassis and the outside of the front
cabinet door is at least 150 mm. In addition, the thickness of the front door must be
smaller than 25 mm to ensure the available space of 125 mm. If the available space is
smaller than 125 mm, the front door cannot be closed because the cabling rack is an
obstacle.
 Porosity of the front and rear doors of the cabinet. The porosity of the CX600 is required
to be greater than 50% to meet heat dissipation requirements.
 Sufficient cabling space at the top of the cabinet. For example, the power cables of the
CX600-X8 and CX600-X16 are laid out from the rear of the cabinet.
 Whether the cabinet adopts double swing doors. This involves the devices whose front
and rear sides need to be maintained. For example, the front and rear sides of the
CX600-X3, CX600-X8 and CX600-X16 need to be maintained. The cabinet cannot be
placed against the wall.

2018-11-28 Huawei Confidential Page 21 of 59


CX600 Site Survey Guide Internal Use

 Ensure that the L-shape slide rails, captive nuts, and captive screws of the cabinet
purchased by the customer are complete.
 Whether the cabinet column provides the grounding cables connected to the chassis,
cable quantity and diameter, whether the cabinet column provides the captive grounding
screws, and grounding screw type and quantity.
 Whether the cabinet provides the grounding point and grounding cable matching the
grounding bar of the equipment room, and diameter and length.

CX600-X3 Customer
Installation Environment
Self-purchased
Requirement.ppt
cabinets survey checklist.xls

3.7 Configuration Description of System Power Supply


Modules

3.7.7 Instructions on the DC Power Distribution of the CX600-X3

Each CX600-X3 chassis uses two DC power modules CR52PEMA connectted with power
input to implement 1+1 backup. The PEM module has been installed in the CX600-X3 DC chassis
and does not need to be delivered separately. It can be connected to 48 V DC power supply
directly.
The following figure shows the appearance of the DC Power Entry Module (PEM)
CR52PEMA.

Appearance of the CR52PEMA

Table 3-1 Electrical specifications of the CR52PEMA


Mode BOM Input Channel DC Input Rated Current Maximum Current
l Number Voltage Input Through Input Through
Range Each Channel Each Channel
CR52 021205 1 -38 ~ 33 A (The input 42A
PEM 29 -72VDC voltage is –48 V.)
A
The following is the diagram of power distribution of the CR52PEMA. PEMA and PEMB
are connected to two channels of DC power supply through cable a and cable b respectively.

2018-11-28 Huawei Confidential Page 22 of 59


CX600 Site Survey Guide Internal Use

Attention: the PEM module (CR52PEMA) of CX600-X3 DC chassis is different from the
PEM module (CR52PEMB) of CX600-X8/CX600-X16 DC chassis.

Diagram of power distribution of the CR52PEMA

List of parameters of the power distribution panel


Item Specification Description
Parameter of air ≥50 A It is recommended that the circuit breaker at the
circuit breaker A or user side be no less than that of the power
air circuit breaker B module (50 A).
Current input ≥33A (–48V) It is recommended that at least 33 A (–48 V) DC
through channel A power be supplied through each channel to
or channel B support the maximum configuration of the device.

3.7.8 Instructions on the AC power distribution of the CX600-X3

CX600-X3 AC chassis no need deliver other AC power module separately. We can connect
AC power input plug (C13 plug) to the 110 V/220 VAC power supply panel.
The AC power module on the CX600-X3 is EPE30B-48A (02130865). The following figure
shows the front view of the chassis with AC power modules.

2018-11-28 Huawei Confidential Page 23 of 59


CX600 Site Survey Guide Internal Use

Front view of the CX600-X3 chassis with AC power modules

Table 3-1 Electrical specifications of the EPW30B-48A


Model BOM Input AC Input Rated Current Air Circuit Breaker
Number Channel Voltage Input Through
Range Each Channel
EPW30 021308 1 200~240VAC 8A The AC power modules
B-48A 65 in the AC power
distribution frames do not
have any air circuit
breakers. The air circuit
breaker on the panel of
the chassis is 10 A.
The following is the diagram of power distribution of the CX600-X3 AC chassis. AC power
modules A and B are connected to the AC power distribution panel through cable a and cable b
respectively.

2018-11-28 Huawei Confidential Page 24 of 59


CX600 Site Survey Guide Internal Use

Diagram of power distribution of the chassis with AC power modules

 NOTE:
The AC power distribution frames in the lower part of the CX600-X3 chassis is 1 U high,
working in 1+1 backup mode. Each AC power distribution frame holds an EPW30B-48A module.
The air circuit breaker of the panel on the chassis is 10 A. Therefore, it is recommended that
the air circuit breaker A or B on the power distribution panel be no less than 10 A.

3.7.9 Instructions on the DC Power Distribution of the CX600-X8

The CX600-X8 adopts the switched-mode power supply by using four PEMs CR52PEMBs
to provide partitioned power supply for boards of two areas. The power supply modules are in 2+2
backup mode (A1 and B1 back up each other to provide power supply for boards in area 1; A2 and
B2 back up each other to provide power supply for boards in area 2). The PEM module has been
installed in the CX600-X8 DC chassis and does not need to be delivered separately. It can be
connected to 48 V DC power supply directly.

Table 3-1 Electrical specifications of the CR52PEMB


Mode BOM Input Channel DC Input Rated Current Maximum Current
l Number Voltage Input Through Input Through Each
Range Each Channel Channel
CR52 02120560 1
–38 to –72 60 A 70 A
PEM
B VDC
(The input
voltage is –48 V.)

Appearance of the CR52PEMB


The power distribution frame (PDF) at the site provides four channels of DC power supply to
the PEM, with the rated current of each channel being no less than 60 A.

2018-11-28 Huawei Confidential Page 25 of 59


CX600 Site Survey Guide Internal Use

Diagram of the DC power distribution of the CX600-X8

Table 3-1 List of parameters of the power distribution panel


Item Specification Remarks
Rated current of each air ≥ 60 A It is recommended that the circuit breaker
circuit breaker at the user side be no less than that of the
power module (70 A).
Current input through ≥ 60 A (– 48 V) It is recommended that at least 60 A (–48
each channel V) DC power be supplied through each
channel to support the maximum
configuration of the device.

3.7.10 Instructions on the AC power distribution of the CX600-X8

NOTE: When EPS200-4850A is applied on the CX600-X8, one AC power supply frame
EPS200-4850A (02400376) and four rectifier modules EPW50-48A&E (02130872) power
supply system is required.
The AC power distribution frame cannot work independently, and must be configured with
certain rectifier modules to convert the 110V/220 V AC power to the –48 V DC power. Then, the
DC power is input to the CX600-X8 integrated chassis. The following two figures show the
appearances of the AC power distribution frame EPS200-4850A configured with four rectifier
modules EPW50-48A&E.

2018-11-28 Huawei Confidential Page 26 of 59


CX600 Site Survey Guide Internal Use

Front view of the EPS200-4850A

Rear view of the EPS200-4850A

The AC power distribution frame EPS200-4850A (02400376) is different from the AC power distribution box
(02120415) in the CX600-16 5KW AC chassis. The AC power distribution box has one input and three outputs.
Each output has an air circuit breaker. The AC power distribution frame air circuit breakers. The monitoring
interface is connected to the CX600-X8 integrated chassis or the CX600-X16 integrated chassis through the
monitoring cable (04080076). Thus, the chassis can manage the AC power distribution frame.

The four air circuit breakers in the middle of the EPS200-4850A control four channels of AC
power inputs respectively. The four channels provide AC power for four rectifier modules
respectively, and the four rectifier modules outputs four channels of DC power.
EPS200-4850A can be applied to the 220 V/240 VAC and 100 V/110 V/120 VAC power
supply networks. In the 220 V/240 VAC power supply network, EPS200-4850A can output full
power. In the 100 V/110 V/120 VAC power supply network, you are required to provide double
live wire inputs. In this manner, the input voltage ranges from 176 VAC to 275 VAC, and EPS200-
4850A can output full power. Otherwise, it isn’t recommended that you use CX600-X8 AC
chassis. The output power of the EPS200-4850A depends on the output power of the configured
rectifier module. The rectifier module is the EPW50-48A&V (02130872). A single module can
provide about 54 A/53.5 V DC power.

2018-11-28 Huawei Confidential Page 27 of 59


CX600 Site Survey Guide Internal Use

Table 3-1 Electrical specifications of the EPW50-48A&V


Model BOM Input AC Input Voltage Rated Current Input
Number Channel Range Through Each Channel
EPW50-48A&V 02130872 1 90 VAC to 290 VAC (–53.5) VDC/54.2 A

Power distribution solution: The power panel provides four channels of AC power supplies to
the EPS200-4850A (02400376), with the rated current of each channel being no less than 20 A.
The EPS200-4850A is connected to the power distribution panel through a1, b1, c1, and d1 to
input four channels of AC power supplies; on the other side, the EPS200-4850A is connected to
the PEMB through a2, b2, c2, and d2 to output power supplies through four channels.

Diagram of the AC power distribution of the CX600-X8

Table 3-1 List of parameters of the power distribution panel


Item Specification Description
Rated current of each ≥ 20 A It is recommended that the circuit breaker at the user
air circuit breaker side be no less than that of the power module (20 A).
Break current of each ≥ 6000 A
air circuit breaker
Current input through ≥ 16 A (–48V) It is recommended that at least 16 A current be
each channel supplied through each channel to support the
maximum configuration of the device.

3.8 Survey of Power Cables

Warning:
Excluding the special explanation, the diameter, color, safe criterion of the power cable
of this chapter is according to Chinese Standard. For example, DC power cables use the
following specification: by default, -48 V cable uses blue wire, RTN cable uses black
wire, PGND cable uses yellow and green wire. For the oversea application, please obey
to the special requirement of power cable and confirm the requirement is the same with
China. If not, please remark at survey report in details. It is recommended that local
purchase after confirming with HQ.

2018-11-28 Huawei Confidential Page 28 of 59


CX600 Site Survey Guide Internal Use

This section describes methods of configuring matched power cables and corresponding
accessories for different types of power configurations, including NEPS3000-D (02270059),
NEPS5000-D (02270078), NEPS8000-D (02270089), NEPS3000-A (02130606), and NEPS5000-
A (02314907), CX600-X3 DC chassis, CX600-X3 AC chassis, CX600-X8 DC chassis, CX600-X8
AC chassis, CX600-X16 DC chassis, CX600-X16 AC chassis.
1) DC power cables are delivered according to three types: 15 m length, 25 m length, 35 m
length.
2) By default, the value of all the delivered power cables length is 25 m.
3) AC power cables do not use the rule.
The configuration principles of DC power cables are as follows: When the site survey length
is equal to or shorter than 15 m, quoting 15 m length. When the site survey length is longer than
15 m and equal to or shorter than 25 m, quoting 25 m length. When the site survey length is longer
than 25 m and equal to or shorter than 35, quoting 35 m length. Delivery according to the site
survey result. When the site survey length is longer than 35 m, a PDF or the first power cabinet of
a row should be placed nearby.

The power supply type refers to the type of the power supply that is equipped into the device
according to the contract and can be provided by the office. For Datacomm products, two power
supplies are available:
 –48 V DC power supply
 220 V AC power supply
You need to survey the following items:
1) DC or AC power supply
2) Whether the power supply of the equipment room can meet the requirements of the input
DC or AC power modules.
3) Length of the power cable from the cabinet to the PDF cabinet.

Note: The N68E cabinet is not equipped with the power distribution box and its power
is high. Therefore, the power is obtained from the external instead of the cabinet.

3.8.1 Configuration Description of Power Cables and Parts for the DC


Power NEPS3000-D (02270059)

Note: Each CX600-4 or CX600-8 is configured with two NEPS3000-D power supply
modules that work in 1+1 backup mode. Each NEPS3000-D power supply needs one-channel
inputs. The materials and terminals of power cables are separately delivered. The power cables are
made on the installation site.
Please record the length between PDF and power supply module when site survey.

2018-11-28 Huawei Confidential Page 29 of 59


CX600 Site Survey Guide Internal Use

Table 3-2 Configurations of external cables and terminals of NEPS3000-D


Length in BOM Description Configuration Principle
the Site Number
Survey
Equal to or 25030101 Wire,450/750V,60227 IEC 1 PCS are configured for
shorter than 02(RV)25mm^2,blue each power module. The
25 m length depends on the site
survey.
25030432 Wire,450/750V,60227 IEC 1 PCS are configured for
02(RV)25mm^2,black,110A each power module. The
length depends on the site
survey.
14170121 Naked Crimping One terminal is configured
Connector,JG2,25mm^2,M8,150A,Silver for each cable. Connected
Plated to power module.
14170060 Naked Crimping One terminal is configured
Terminal,OT,25mm^2,M8,Tin for each cable. Connected
Plating,Naked Ring Terminal to PDF.
Longer than 25030199 Wire,450/750V,60227 IEC 1 PCS are configured for
25 m and 02(RV)35mm^2,Blue,135A each power module. The
equal to or length depends on the site
shorter than survey.
35 m 25030420 Wire,450/750V,60227 IEC 1 PCS are configured for
02(RV)35mm^2,black,135A each power module. The
length depends on the site
survey.
14170128 Naked Crimping One terminal is configured
Connector,JG2,35mm^2,M8,210A,Tin for each cable. Connected
Plating,For OEM to power module.
14170063 Naked Crimping One terminal is configured
Terminal,OT,35mm^2,M8,Tin for each cable. Connected
Plating,Naked Ring Terminal to PDF.
Longer than A PDF or the first power cabinet of a row should be placed near the device.
35 m

3.8.2 Configuration Description of Power Cables and Parts for the DC


Power NEPS5000-D (02270078)

Note: Each CX600-16 is configured with two NEPS5000-D power supply modules that work
in 1+1 backup mode. Each NEPS5000-D power supply needs three-channel inputs. The materials
and terminals of power cables are separately delivered. The power cables are made on the
installation site.
Please record the length between PDF and power supply module when site survey.

Table 3-3 Configurations of external cables and terminals of NEPS5000-D


Length in BOM Description Configuration Principle
the Site Number
Survey

2018-11-28 Huawei Confidential Page 30 of 59


CX600 Site Survey Guide Internal Use

25030430 Wire,450/750V,60227 IEC 3 PCS are configured for


02(RV)16mm^2,blue,85A each power module. The
length depends on the site
survey.
25030428 Wire,450/750V,60227 IEC 3 PCS are configured for
02(RV)16mm^2,black,85A each power module. The
Equal to or length depends on the site
shorter survey.
than 25 m
14170020 Naked Crimping One terminal is configured
Terminal,OT,16mm^2,M6,Tin for each cable.
Plating,Naked Ring Terminal
14170024 Naked Crimping One terminal is configured
Terminal,OT,16mm^2,M8,Tin for each cable.
Plating,Naked Ring Terminal
25030101 Wire,450/750V,60227 IEC 3 PCS are configured for
02(RV)25mm^2,blue each power module. The
length depends on the site
survey.
Longer
than 25 m 25030432 Wire,450/750V,60227 IEC 3 PCS are configured for
and equal 02(RV)25mm^2,black,110A each power module. The
to or length depends on the site
shorter survey.
than 35 m 14170147 Naked Crimping One terminal is configured
Terminal,OT,25mm^2,M6,Tin for each cable.
Plating,Width Less Than 12.4mm,For
OEM
14170060 Naked Crimping One terminal is configured
Terminal,OT,25mm^2,M8,Tin for each cable.
Plating,Naked Ring Terminal
Longer A PDF or the first power cabinet of a row should be placed near the device.
than 35 m

3.8.3 Configuration Description of Power Cables and Parts for the DC


Power NEPS8000-D (02270089)

Note: Each CX600-16 is configured with two NEPS8000-D power supply modules that work
in 1+1 backup mode. Each NEPS8000-D power supply needs three-channel inputs. The materials
and terminals of power cables are separately delivered. The power cables are made on the
installation site.
Please record the length between PDF and power supply module when site survey.

Table 3-4 Configurations of external cables and terminals of NEPS8000-D


Length in the BOM Description Configuration Principle
Site Survey Number
Equal to or 25030101 Wire,450/750V,60227 IEC 3 PCS are configured for
shorter than 02(RV)25mm^2,blue each power module. The
25 m length depends on the site
survey.

2018-11-28 Huawei Confidential Page 31 of 59


CX600 Site Survey Guide Internal Use

25030432 Wire,450/750V,60227 IEC 3 PCS are configured for


02(RV)25mm^2,black,110A each power module. The
length depends on the site
survey.

14170147 Naked Crimping One terminal is configured


Terminal,OT,25mm^2,M6,Tin for each cable.
Plating,Width Less Than
12.4mm,For OEM

14170060 Naked Crimping One terminal is configured


Terminal,OT,25mm^2,M8,Tin for each cable.
Plating,Naked Ring Terminal
Longer than 25030199 Wire,450/750V,60227 IEC 3 PCS are configured for
25 m and 02(RV)35mm^2,Blue,135A each power module. The
equal to or length depends on the site
shorter than survey.
35 m 25030420 Wire,450/750V,60227 IEC 3 PCS are configured for
02(RV)35mm^2,black,135A each power module. The
length depends on the site
survey.
14170142 Naked Crimping One terminal is configured
Terminal,OT,35mm^2,M6,Tin for each cable.
Plating,Naked Ring Terminal
14170063 Naked Crimping One terminal is configured
Terminal,OT,35mm^2,M8,Tin for each cable.
Plating,Naked Ring Terminal
Longer than A PDF or the first power cabinet of a row should be placed near the device.
35 m

3.8.4 Configuration Description of Power Cables and Parts for the AC


Power NEPS3000-A (02130606)

Note: Each CX600-4 or CX600-8 is configured with two NEPS3000-A power supply
modules that work in 1+1 backup mode. Each NEPS3000-A power supply needs one-channel
inputs. The materials and terminals of power cables are separately delivered. The power cables are
made on the installation site.
Please record the length between PDF and power supply module when site survey.

Table 3-5 Configurations of external cables and terminals of NEPS3000-A


BOM Description Configuration Principle
Number
25030422 Power Cable,300/500V,227IEC10(BVV),Black(Cores: 1 PCS are configured for
Blue,Brown,Yellow/Green),36A,3*6mm^2 each power module. The
length depends on the
site survey.
14170013 Naked Crimping Terminal,OT,6mm^2,M8,Tin Each cable should be
Plating,Insulated Ring Terminal,12~10AWG,yellow equipped with three
terminals.
14170017 Naked Crimping Terminal,OT,6mm^2,M4,Tin Each cable should be
Plating,Insulated Ring Terminal,12~10AWG,yellow equipped with three
terminals.

2018-11-28 Huawei Confidential Page 32 of 59


CX600 Site Survey Guide Internal Use

3.8.5 Configuration Description of Power Cables and Parts for the AC


Power NEPS5000-A (02314907)

Note: Each CX600-16 is configured with two NEPS5000-A power supply modules that work
in 1+1 backup mode. Each NEPS5000-A power supply needs three-channel inputs. The AC power
supply module NEPS5000-A must be used together with the external AC power distribution box.
These materials and terminals of power cables are separately delivered. The power cables are
made on the installation site. The maximum distance for power distribution is 100 m.
Please record the length between PDF and power distribution box when site survey.

Table 3-6 Configurations of external cables and terminals of NEPS5000-A


BOM Description Quantity
Number
25030463 Power Each power module should
Cable,300/500V,227IEC10(BVV),10mm^2,Black be equipped with one
Jacket(Cores: Blue,Brown,Black,Yellow/Green),46A,4 cable of this type.
Equivalent Cores

04043396 Chinese AC Power Cable Each power module should


220V16A,3m,3*2.5mm^2,Black,I-Type Angle be equipped with three
Plug,227IEC53-2.5^2(3C),C19 Straight Connector cables of this type.

02120415 NetEngine5000E,CR5E3TSR,AC Distribution Frame Each device should be


for Cabinet,2 or 6 Input,6(2*3) Output,6 Group of 2 equipped with 1 pcs. The
Poles 20A Air Switch price of this item must be
separately quoted.

14170146 Common Terminal,Single Cord End Each 25030463 cable


Terminal,Conductor Cross Section should be equipped with
10mm^2,50A,Insertion Depth 18mm,Ivory three terminals of this type.

14170016 Naked Crimping Terminal,OT,10mm^2,M6,Tin Each 25030463 cable


Plating,Naked Ring Terminal should be equipped with
three terminals of this type.

14170098 Common Terminal,Single Cord End Each 04043396 cable


Terminal,Conductor Cross Section should be equipped with
2.5mm^2,12.5A,Insertion Depth 8mm,Blue three terminals of this type.

The principle for using AC-input power cables is as follows:


For the power cables connecting the power distribution cabinet and the power distribution box: At the user
side, it is recommended to use two mutual-backup circuit breakers rated for 32 A for each power supply
input and adopt the Power Cable, 10mm^2, (BOM: 25030463) as the input-AC cable. One end of the power
cable connected with the power distribution cabinet is recommended to be OT terminals (BOM: 14170016,
M6). While the other end of the AC-input power cable connected with the power distribution box (BOM:
02120415) is recommended to be a cold end terminal (BOM: 14170146).
For the power cables connecting the AC power distribution cabinet and the AC power module: The input-
cable of the AC power module has connectors (BOM: 04043396). The C19 straight connector can be directly
inserted into the power module and the male connector should be cut and re-installed with a cold end
terminal (BOM: 14170098) for connecting the AC power distribution cabinet.

2018-11-28 Huawei Confidential Page 33 of 59


CX600 Site Survey Guide Internal Use

3.8.6 Configuration Description of CX600-X3 Power Cables

1) CX600-X3 DC chassis
NOTES: The CX600-X3 does not need to be equipped with external power modules. The
power supply module of the CX600-X3 chassis can be directly connected to PDF. Each power
supply needs one-channel inputs.
Please record the length between PDF and power supply module when site survey.
The following table lists the power cables of the CX600-X3.

Table 3-7 Configuration description of external cables and terminals of the


CX600-X3 DC chassis
Length in BOM Description Configuration Principle
the Site Number
Survey
25030017 Wire,450/750V,60227 IEC 2 PCS are configured for each DC
02(RV)10mm^2,black chassis. The length depends on
the site survey.
25030074 wire,450/750V,60227 IEC 2 PCS are configured for each DC
Equal to or 02(RV)10mm^2,blue,62A chassis. The length depends on
shorter the site survey.
than 14170123 Naked Crimping One terminal is configured for each
15 m Connector,OT2,10mm^2,M6,60 cable.
A,Tin Plating
14170056 Naked Crimping One terminal is configured for each
Terminal,OT,10mm^2,M8,Tin cable.
Plating,Naked Ring Terminal
25030430 Wire,450/750V,60227 IEC 2 PCS are configured for each DC
02(RV)16mm^2,blue,85A chassis. The length depends on
the site survey.
Longer 25030428 Wire,450/750V,60227 IEC 2 PCS are configured for each DC
than 15 m 02(RV)16mm^2,black,85A chassis. The length depends on
and equal the site survey.
to or 14170116 Naked Crimping One terminal is configured for each
shorter Terminal,JG2,16mm^2,M6,95A cable.
than 35 m ,Tin Plated,for OEM
14170024 Naked Crimping One terminal is configured for each
Terminal,OT,16mm^2,M8,Tin cable.
Plating,Naked Ring Terminal
Longer A PDF or the first power cabinet of a row should be placed near the device.
than 35 m

2) CX600-X3 AC chassis
CX600-X3 AC chassis need deliver AC power cable (C13 plug) with two connectors. By
default, the length of this cable is 3 m. If the distance of site survey is longer than 3 m, please
remark the length. It’s not recommended that the distance is longer than 20 m. Otherwise, users

2018-11-28 Huawei Confidential Page 34 of 59


CX600 Site Survey Guide Internal Use

should design the connect place near the device. For the 220 V/240 VAC power supply network,
we can select the power cable (04000104).
Please record the length between PDF and power supply module when site survey.

Table 3-8 Configuration description of external cables and terminals of the


CX600-X3 AC chassis
BOM Number Description Quantity
04000104 External Suite,Power Cords All Over The Different cables are use for
World,Class I Equipment With Connector different countries. Each AC
C13,External Cable Set chassis is equipped with 2 pcs.
In the 100 V/110 V/120 VAC power supply network, double live wire inputs are required. In
this manner, the input voltage ranges from 176 VAC to 275 VAC. Any two phases of the live wire,
neutral wire, and protection earth wire can be input to the power supply module. The three screws
of C13 connector side are L (live wire), N (neutral wire), and PE (protection earth wire). The other
end should be cut and made on the installation site. Please remark the terminal type at site survey
report.

The plugs are different among every country, please select the power cable depends on the local requirement
from the cable suites (04000104).

3.8.7 Configuration Description of CX600-X8 Power Cables

1) CX600-X8 DC chassis
NOTES: The CX600-X8 does not need to be equipped with external power modules. The
power supply module of the CX600-X8 chassis can be directly connected to PDF. There are four
PEM power modules equipped in CX600-X8 chassis. Each power supply needs one-channel
inputs.
Please record the length between PDF and power supply module when site survey.

Table 3-9 Configuration description of external cables and terminals of the


CX600-X8
Length in BOM Description Configuration Principle
the Site Number
Survey
Equal to or 25030430 Wire,450/750V,227 IEC 4 PCS are configured for each
shorter than 02(RV)16mm^2,blue,85A DC chassis. The length
15 m depends on the site survey.
25030428 Wire,450/750V,227 IEC 4 PCS are configured for each
02(RV)16mm^2,black,85A DC chassis. The length
depends on the site survey.
14170116 Naked Crimping One terminal is configured for
Terminal,JG2,16mm^2,M6,95A,Ti each cable.
n Plated,for OEM

2018-11-28 Huawei Confidential Page 35 of 59


CX600 Site Survey Guide Internal Use

14170024 Naked Crimping One terminal is configured for


Terminal,OT,16mm^2,M8,Tin each cable.
Plating, Naked Ring Terminal
4 PCS are configured for each
Wire,450/750V,227 IEC
25030101 DC chassis. The length
02(RV)25mm^2,blue
depends on the site survey.
4 PCS are configured for each
Longer than Wire,450/750V,227 IEC
25030432 DC chassis. The length
15 m and 02(RV)25mm^2,black,110A
depends on the site survey.
equal to or
Naked crimping terminal-OT- One terminal is configured for
shorter than
14170060 25mm^2-M8-tin plating-naked each cable.
35 m
ring terminal
Naked Crimping One terminal is configured for
14170119 Connector,JG2,25mm^2,M6,150 each cable.
A,Tin Plating,For OEM
Longer than A PDF or the first power cabinet of a row should be placed near the device.
35 m

2) CX600-X8 AC chassis
The AC power distribution frame cannot work independently, and must be configured with
certain rectifier modules to convert the 110V/220 V AC power to the –48 V DC power. Then, the
DC power is input to the CX600-X8 integrated chassis.
The power cables include two sections: cables between PDF and power distribution box,
cables between power distribution box and DC chassis.
Please record the cables length between PDF and power distribution box, the length between
power distribution box and PEM power supply module.
During the site survey and project design, please place the power distribution box and
CX600-X8 DC chassis in the same cabinet. Decreasing the distance between box and DC chassis
(A) and monitoring the power distribution box through the monitor cable (B). The length of the
monitor cable is only 3 m. When the distance is longer than 3 m, we can not monitor the power
distribution box.

2018-11-28 Huawei Confidential Page 36 of 59


CX600 Site Survey Guide Internal Use

Figure of CX600-X8 chassis and AC power frame

Table 3-1 configuration principles of AC power cables


Length in the BOM Description Configuration Principle
Site Survey Number
Each DC chassis is
Wire,450/750V,60227 IEC equipped with 4 pcs.
25030430
02(RV)16mm^2,blue,85A The single cable length is 3
m.
Length between Each DC chassis is
AC power supply Wire,450/750V,60227 IEC equipped with 4 pcs.
25030428
frame and the DC 02(RV)16mm^2,black,85A The single cable length is 3
chassis is equal m.
to or shorter than Naked Crimping
Each cable is configured
3m 14170116 Terminal,JG2,16mm^2,M6,95
with 2 pcs.
A,Tin Plated,for OEM
Monitor and Alarm
Each AC chassis is
04080076 Cable,3m,D9M,CC4P0.48B(
configured with 1 pcs.
S),D9M
Length between
1. An AC power supply frame should be placed near the DC chassis.
AC power supply
2. The power cables between AC power supply frame and DC chassis are
frame and the DC
selected according to Configuration description of external cables and
chassis is longer
terminals of the CX600-X8.
than 3 m

2018-11-28 Huawei Confidential Page 37 of 59


CX600 Site Survey Guide Internal Use

Each AC power frame is


Power
equipped with 4 pcs. Each
Cable,300/500V,227IEC10(B
CX600-X8 chassis is
25030461 VV),6mm^2,Black
equipped with 4 pcs.The
Jacket(Cores:Blue,Brown),4
The length cable length is determined
3A,2 Equivalent Cores
between AC by the site survey result.
power frame and Naked Crimping
PDF is equal to or Terminal,OT,6mm^2,M6,Tin Each cable is configured
14170023
shorter than 20 m Plating,Insulated Ring with 2 pcs.
Terminal,12~10AWG,yellow
Naked Crimping
Terminal,OT,6mm^2,M8,Tin Each cable is configured
14170013
Plating,Insulated Ring with 2 pcs.
Terminal,12~10AWG,yellow
The length
between AC
A PDF or the first power cabinet of a row should be placed near the
power frame and
device.
PDF is longer
than 20 m

3.9 Survey of Ground Cables


The CX600 can be grounded in two modes: through the chassis and through the cabinet.

:
The default length of Ground Cable is 25 m when there is not special requirement. So please write down the
mode and length on the site survey report to avoid hard installation and cables waste.

:
Since the device is grounded through the chassis or the cabinet. The power module need not be singly
connected to the earth through a ground cable.
Grounded through the chassis: The power is not obtained from the cabinet, or the cabinet which the device is
installed isn’t connected to the earth, or the chassis isn’t installed in the cabinet. You should connect the chassis to
the grounding connector of the equipment room. In this manner, each chassis is equipped with one ground cable,
the length is the distance from the grounding connector of the chassis to the grounding bar of the equipment room.
The terminal of the cable is configured depands on the type of the chassis grounding connector and the grounding
bar.
Grounded through the cabinet: The cabinet which the chassis is installed is connected to the grounding bar of
the equipment room. The chassis can be grounded through the cabinet. In this manner, you should write down the
grounded type and the length between the cabinet’s grounding connector and the grounding bar of the equipment
room in detail.

2018-11-28 Huawei Confidential Page 38 of 59


CX600 Site Survey Guide Internal Use

Diagram of the chassis and cabinet are connected to the earth


The N68E-22 cabinet is equipped with a grounding cable (04044880), the length is 0.45 m,
the diameter is 35 mm^2. When the chassis is grounded through the cabinet, only one chassis is
installed in the cabinet. You can use this cable to connect the chassis to the cabinet. If there are
more than one chassis, you should write down the number of the chassis, the distance (a1) from
the chassis to the cabinet, and the distance (a2) from the cabinet to the grounding bar of the
equipment room.
For the cabinet purchased by the costomer, or the cabinet’s type is not N68E-22. And using
the type of grounded through the cabinet. You should write down the terminal type (B) of the
cabinet’s grounding connector and the length (a1) between the chassis and the cabinet. Customer
should purchase the grounding cable (C, a2, D) from the cabinet to the grounding bar of the
equipment room when the cabinet is purchased by the customer.
In the following section, when grounding through the cabinet, the cable suite is including the
cable length (a1) and the terminal type and terminal number (A, B). When grounding through the
chassis, the cable suite is including the cable length (a3) and the terminal type and terminal
number (E, F). When using the N68E cabinet, the cable suite is including the cable length (a2) and
terminal type and terminal number (C, D). Any special requirement, please contact the HQ.

3.9.1 Configuration Description of the Ground Cable for the N68E


Cabinet

When grounding through the cabinet, please write down the distance from the cabinet to the
grounding bar of the equipment room.

Table 3-1 Configurations of ground cables and terminals of the cabinet


BOM Description Configuration Principle
Number

2018-11-28 Huawei Confidential Page 39 of 59


CX600 Site Survey Guide Internal Use

25030431 Wire,450/750V,60227 IEC Each cabinet is equipped with 1


02(RV)25mm^2,yellow green,110A pcs.The cable length (a2) is
according to the site survey result.
Naked Crimping 2 pcs are configured for each cabinet.
14170060 Terminal,OT,25mm^2,M8,Tin
Plating,Naked Ring Terminal
Customer should purchase the grounding cable (C, a2, D) from the cabinet to the
grounding bar of the equipment room when the cabinet is purchased by the customer. Any
special requirement, please write down on the contract.
When grounding through the customer purchased cabinet, please note the terminal type of the
grounding connector which the chassis is connected.

3.9.3 Configuration Description of Ground Cables for the CX600-X3

When grounding through the chassis, please write down the distance between the chassis and
the grounding bar.
When grounding through the cabinet with other device together, please write down the
distance between the chassis and the grounding connector on the cabinet.

Table 3-2 Configurations of ground cables and terminals of the CX600-X3


BOM Description Configuration Principle
Number
25030190 Wire,450/750V,60227 IEC 1 pcs is configured for one device.
02(RV)10mm^2,Yellow And Green,62A The cable length depands on the site
survey result.
14170123 Naked Crimping 1 pcs is configured for one chassis.
Connector,OT2,10mm^2,M6,60A,Tin Connected to the grounding
Plating connector on the chassis.

Naked Crimping 1 pcs is configured for one chassis.


Connected to the grounding
14170056 Terminal,OT,10mm^2,M8,Tin connector on the cabinet or the
Plating,Naked Ring Terminal grounding bar.

3.9.4 Configuration Description of Ground Cables for the CX600-X8/X16


and EPS200-4850A

When grounding through the chassis, please write down the distance between the chassis and
the grounding bar.
When grounding through the cabinet with other device together, please write down the
distance between the chassis and the grounding connector on the cabinet.

Table 3-3 Configurations of the ground cables and terminals of the CX600-
X8/X16 and EPS200-4850A
BOM Description Configuration Principle
Number

2018-11-28 Huawei Confidential Page 40 of 59


CX600 Site Survey Guide Internal Use

25030431 Wire,450/750V,60227 IEC 1 pcs is configured for one device. The cable
02(RV)25mm^2,yellow green,110A length depands on the site survey result.
14170119 Naked Crimping 1 pcs is configured for one chassis.
Connector,JG2,25mm^2,M6,150A,Tin Connected to the grounding connector on
Plating,For OEM the chassis.
14170060 Naked Crimping 1 pcs is configured for one chassis.
Terminal,OT,25mm^2,M8,Tin Connected to the grounding connector on
Plating,Naked Ring Terminal the cabinet or the grounding bar.

3.10 Survey of Fiber Jumpers and Network Cables

3.10.1 Survey of Fiber Jumpers


Principle for the delivery of fiber jumpers: The quantity and types of fiber jumpers are
determined by the contract. If discrepancies are found, record them in the Contract Problem
Report. The types and number of connectors for fiber jumpers at the device side are determined by
the Configuration Manual. The length and types and number of connectors of the peer device are
determined by the survey result.
During the site survey, the lengths of cables and fiber jumpers are measured according to
their ends and proper redundancy is retained. When determining the length of fiber jumpers, you
must survey with the customer and determine the cabling route, and reach a consensus.
Misunderstanding and errors must be avoided.
Optical fiber survey items:
Peer devices: indicate the devices directly connected to Huawei's Datacomm products, which
can be LAN switches, routers, optical transceivers, Optical Distribution Frames (ODFs), and
Optical Distribution Boxes (ODBs).
Type of the interfaces for the fiber jumpers on the user side: The connectors on both ends of
the fiber jumpers are prepared before delivery. You should survey the type of the interfaces at the
peer end. The Configuration department should determine which types of fiber jumpers should be
delivered according to the type of the optical interfaces for Huawei devices and the survey report.
When surveying the type of the interface at the peer end, fill in the survey report according to the
type of the device connected to the fiber jumpers and the type of the interfaces on the ODF.
Currently, the common types of connectors for optical interfaces are SC/PC, FC/PC, and LC. The
Broadcasting & Television Bureau usually uses FC/APC or PC/APC.
In principle, optical attenuators should be configured to the receiving end. Usually, optical
attenuators should be quoted by the Marketing department.
Lengths of fiber jumpers: indicate the lengths of the fiber jumpers between network devices
or between a network device and ODF. The standard lengths of fiber jumpers are 5 m, 10 m, 15 m,
20 m, 25 m, 30 m, 35 m, 45 m, 55 m, 70 m, 80 m, and 100 m. Fibers jumpers should not be too
long because the connectors on both ends of fiber jumpers are readily made before delivery, and
cannot be reworked on site. Fibers jumpers of proper length facilitate layout and protection. When
fiber jumpers are rather long, it is recommended that the customer be responsible for laying
optical fibers.
2018-11-28 Huawei Confidential Page 41 of 59
CX600 Site Survey Guide Internal Use

The appearance of various types of optical connectors are as follows:

Table 3-4 List of commonly used optical fibers in the optical fiber suite
No. BOM Description Quantity Unit
Number
1 14130296 Patch Cord,LC/PC-LC/PC,Multimode,A1b,2mm,5m The type pcs
and the
2 14130222 Patch Cord,LC/PC-LC/PC,Multimode,2mm,10m number ofpcs
3 14130295 Patch Cord,LC/PC-LC/PC,Multimode,2mm,20m fibers pcs
4 14130195 Patch Cord,LC/PC-LC/PC,Singlemode,2mm,5m depend onpcs
the site
5 14130199 Patch Cord,LC/PC-LC/PC,Singlemode,2mm,10m survey.
pcs
6 14130251 Patch Cord,LC/PC-LC/PC,Singlemode,2mm,20m pcs
7 14130248 Adapter,LC/PC- pcs
LC/PC,2,Blue,Shell:Plastic,Sleeve:Zirconia,Squar
e
8 14130197 Patch Cord,FC/PC,LC/PC,Singlemode,2mm,10m pcs
9 14130221 Patch Cord,FC/PC,LC/PC,Multimode,2mm,10m pcs
10 14130196 Patch Cord,LC/PC-SC/PC,Singlemode,2mm,10m pcs
11 14130223 Patch Cord,LC/PC-SC/PC,Multimode,2mm,10m pcs
12 14130375 Patch Card,MPO-MPO,Multimode,0.3m,8 Cores pcs
Ribbon Fiber
13 14130335 Optic Fiber Connector,LC/PC,LC/PC,Multi- pcs
mode,2mm,1m
1. The type of the optical fiber must match the connector type used on the optical interface.
Therefore, the types of the interfaces at both the local end and the remote end must be taken into
consideration.
Currently, all the interfaces of the CX600 use LC connectors. You can select suitable optical
fibers according to the site survey result that shows the connector type used on the device at the
remote end.
Pay special attention to the configuration of the optical fibers of the pluggable optical
modules on an LPU. Interfaces with XFP modules and SFP modules all use LC connectors, and

2018-11-28 Huawei Confidential Page 42 of 59


CX600 Site Survey Guide Internal Use

thus must be connected to the optical fibers with LC connectors. Interfaces with GBIC modules
use SC connectors, and thus must be connected to the optical fibers with SC connectors.
2. If the length of the optical fibers listed in Table 3-30 does not satisfy the needs of use, you
can connect the adaptor 14130248 to the optical fiber to prolong the length. Alternatively, you can
select another optical fiber with a suitable length from 04100069.
3. Selection of single/multi-mode optical fibers: The type of the optical fiber (single-mode or
multi-mode) must be consistent with the type of the optical interface on the LPU. If the optical
interface is in single-mode, the connector in single-mode must be selected. If the optical interface
is in multimode, the connector in multimode must be selected.
4. The actual length of the optical fiber and the type of the connector that are used on the
opposite end must be provided in the site survey report.
5. Selection of the MPO optical fiber 14130375: This optical fiber is used for connecting 10G
POS RPR interfaces. One optical fiber (14130375) is required to connect two 10G POS RPR
interfaces because all optical interfaces on the LPU of the CX600 are of the transmission and
reception separated structure. Each optical interface needs to be connected to two optical fibers.
6. Two BIDI optical modules need to be used together. Only one optical fiber can support two
optical modules work. BIDI optical module only supports single model fiber.
7. By default, the corrugated pipe and spiral pipe are stopped to deliver in China. If
fragmentary requirement, please purchase locally.

3.10.2 Survey of Network Cables


If the device is configured with the Ethernet interface (RJ-45), the cable needs surveying.
1) Length: Indicates the distance from the Ethernet interface to other connected devices.
2) Cable type: The default type is unshielded cables. If customers have special demands, it is
noted down in the survey report.

3.12 Survey on Other External Cables of the CX600


Configurations cables, auxiliary cables, and network cables are lumped together with
engineering accessories without separate selection or configuration.

3.12.1 Configuration Rules for Clock Cables


If the CX600 needs to import the clock from the network, select clock cables from the
external cable suite according to the site survey result. If the CX600 needs to export the clock to
other devices, select clock cables of the required length. If the NE80 does not need to import or
export the clock, clock cables are unnecessary.
If only synchronizes frequency, for example, POS synchronization (Sonet, SDH service),
synchronization Ethernet clock transmit and receive, only need input and output clock. When
using the 1588v2 character, you should configure the clock and time input and output.
For the trunk cable of the clock, do as follows to survey the impedance and length.

2018-11-28 Huawei Confidential Page 43 of 59


CX600 Site Survey Guide Internal Use

1) Survey the impedance and length from the impedance transfer box to the trunk cable on
the device side.
2) Survey the impedance and length from the cock source to the transfer box.
One end of the clock cable is connected to the clock interface of MPU (SRU) board. It can be
120-ohm balanced cable (RJ48) or 75-ohm unbalanced cable. The other end of the cable is
connected to clock source device (BITS), or receiving clock device (downstream network device).
There are five factors to select the clock cable.
1) The type of MPUs (SRUs).
2) The clock character, only clock synchronization, or time synchronization.
3) The peer interface type and peer device type.
4) The signal format and definition between MPUs (SRUs) and peer device.
5) The length of clock cable according to the site survey result.
The following table lists the clock cable.

Table 3-5 Clock cable list


N BOM Description Apply
Length Cable Type
o. Number Devices
Trunk
1 04022629 Cable,20.00m,75ohm,2.2mm,SMB75SF- 20m
SMB cable,
V,SYFVZ75-1.2/0.25,HONET,DL2526
only one
Trunk
terminal to CX600-
Cable,30.00m,75ohm,2.2mm,SMB75SF-
2 04060205 30m connect to 16/CX60
V,SYFVZ75-1.2/0.25,Wireless Intelligent
the MPUs 0-
Network
(SRUs), 8/CX600
Trunk
customer -
3 04023971 Cable,40.00m,75ohm,2.2mm,SMB75SF- 40m
need provid 4/CX600
V,SYFVZ75-1.2/0.25,C&C08B,DL3133
the other -
Trunk
terminal X8/CX60
4 04023972 Cable,50.00m,75ohm,2.2mm,SMB75SF- 50m
0-X16
V,SYFVZ75-1.2/0.25,C&C08B,DL3134
Trunk Cable,155M Self- With two
5 04060171 Loop,5m,75ohm,4.0mm,SMB75SF- 5m SMB
IV,SYV75-2/0.34(S),SMB75SF-IV,OptiX connectors
Trunk Cable with CX600-
Cable,3m,120ohm,1E1,0.4mm,MP8- the RJ48 16/CX60
6 04040497 3m
II,120CC4P0.4P430U(S),MP8-II,Expert connector 0-
2.0 8/CX600
Trunk -
7 04040261 Cable,15m,120ohm,1E1,0.4mm,MP8- 15m 4/CX600
II,120CC4P0.4P430U(S),MP8-II -
8 04040496 Trunk 30m X3/CX60
Cable,30m,120ohm,1E1,0.4mm,MP8- 0-
II,120CC4P0.4P430U(S),MP8-II,Expert X8/CX60
2.0 0-X16

2018-11-28 Huawei Confidential Page 44 of 59


CX600 Site Survey Guide Internal Use

Trunk
Cable,60.00m,120ohm,1E1,0.4mm,MP8-
9 04040494 60m
II,120CC4P0.4P430U(S),MP8-II,Expert
2.0
Trunk
Cable,80m,120ohm,1E1,0.4mm,MP8-
10 04040493 80m
II,120CC4P0.4P430U(S),MP8-II,Expert
2.0
Network Interface Connector,8Bit RJ45 CX600-
11 14080082 2pcs
8Pin,Crystal Plug,Matching 25050014 connector 16/CX60
0-
8/CX600
Delivery
-
accordin
Twisted-Pair Cable,100ohm,,Category 5e 4/CX600
g to the Balanced
12 25050014 UTP,0.51mm,24AWG,8Cores,PANTONE -
site Cable
430U,Use with Plug:14080082 X3/CX60
survey
0-
result
X8/CX60
0-X16

Except SMB cable (BOM: 04060171) with two SMB connectors, the other cables only have one
terminal to connect to the MPUs (SRUs), customer need provid the other terminal.

RJ48 Trunk cable is different from RJ45 network cable. The two cables can not substitute each
other.

3.12.2 Configuration Description of the Clock Cables of the CX600

The MPUs (SRUs) of CX600 support two fomat clock signal inputs: 2.048 Mhz clock signal
and 2.048 Mbps code signal (E1 signal). These two signals can be transmitted on the coaxial
cables or twisted-pair (RJ48 cable). It’s named for 75-ohm unbalanced mode when using the
coaxial cable. It’s named for 120-ohm balanced mode when using twisted-pair.
The MPUs (SRUs) of CX600 support two fomat time signals: 1PPS+TOD and DCLS. When
1PPS+TOD signal is transmitted on the coaxial cable, 1PPS uses TTL level, TOD uses RS232
level. Using 2 pcs coaxial cables to transmit 1 channel signal, it’s for short 1PPS+TOD (RS232).
When 1PPS+TOD signal is transmitted on the twisted-pair (RJ48 cable), 1PPS and TOD use
RS422 level. Using 1 pcs twisted-pair to transmit 1 channel signal, it’s for short 1PPS+TOD
(RS232). DCLS signal can only be transmitted on the twisted-pair, using RS422 level.
On the SMB interface, using coaxial cable to transmit 1PPS+TOD (RS232) signal. 75-ohm
unbalanced clock signal and 1PPS+TOD (RS232) signal are multiplex, the interface can support
only one work mode anytime. The device with RJ48 interface supports 120-ohm balanced clock
signal, DCLS signal and 1PPS+TOD (RS422). These signals are multiplex on one RJ48 interface,
the interface can support only one work mode modified through software anytime.

2018-11-28 Huawei Confidential Page 45 of 59


CX600 Site Survey Guide Internal Use

If the CX600-16/CX600-8/CX600-4/CX600-X8/CX600-X16 needs to connect to the external


2MHz reference clock, you can select clock cables from the external cable suite according to the
site survey. Table 3-32 and table 3-33.

A) CX61MPUB0/CX61SRUA1 provides four SMB interfaces, support clock information


input and output.
Each one of the two SMB input interfaces can select one channel unbalanced 2.048 MHz
input or one channel unbalanced 2.048 Mbps input. Each one of the two SMB output interfaces
can select one channel unbalanced 2.048 MHz output or one channel unbalanced 2.048 Mbps
output.

Table 3-6 Configuration description of the clock cables of the CX600-16/CX600-


8/CX600-4 with double MPUs/SRUs (CX61MPUB0/CX61SRUA1)
No. Applicable Environment Quantity Unit
1 The system only needs to input the 4 pcs
2MHz reference clock.

2 The system only needs to output the 4 pcs


2MHz reference clock.

3 The system needs to output and input 8 pcs


the 2 MHz reference clock.

4 The system does not need to input or 0 pcs


output the 2 MHz reference clock.

B) CX61MPUB1/CX61SRUA2/CX61MPUB4/CX61SRU40A4 provides two SMB


interfaces and two RJ48 interfaces, support clock information and time information input and
output.
When clock transmission is applied, each of the two SMB interfaces, each of the RJ48
interfaces, SMB interface and RJ48 interface are separate.
Each one of the two SMB interfaces can select: one channel unbalanced 2.048 MHz
input, or one channel unbalanced 2.048 MHz ouput, or one channel unbalanced 2.048
Mbps input, or one unbalanced 2.048 Mbps output.
Each one of the two RJ48 interfaces can select: one channel balanced 2.048 MHz
input, or one channel balanced 2.048 MHz ouput, or one channel balanced 2.048 Mbps
input, or one balanced 2.048 Mbps output.
When time transmission is applied, the two SMB interfaces are configured together. Each of
the RJ48 interfaces, SMB interface and RJ48 interface are configured separately.
Each one of the two RJ48 interfaces can support: one channel 1PPS+TOD (RS422)
input, or one 1PPS+TOD (RS422) output, or one channel RS422 (DCLS input and
output).
The two SMB interfaces can support: one channel 1PPS (TTL) + TOD (RS232)
input, or one channel 1PPS (TTL) + TOD (RS232) output.

2018-11-28 Huawei Confidential Page 46 of 59


CX600 Site Survey Guide Internal Use

Table 3-7 Configuration description of the clock cables of the CX600-16/CX600-


8/CX600-4/CX600-X8/CX600-X16 with double MPUs/SRUs
(CX61MPUB1/CX61SRUA2/CX61MPUB4/CX61SRU40A4)
N Applicable Environment Quantity of Quantity of Precautions Unit
o. Cables with Cables with
SMB RJ48
Connectors Connectors
The system needs to Using 75-ohm
1 output or input the 2 4 0 unbalanced pcs
channels reference clock. cable
The system needs to
Using 120-ohm
2 output or (and) input the 2 0 4 pcs
balanced cable
channels reference clock.
The system needs to Using 75-ohm
3 output and input the 1 4 0 unbalanced pcs
channel reference clock. cable
The system needs to
Using 120-ohm
4 output and input the 1 0 2
balanced cable
channel reference clock.
The system needs to Calculate
output or (and) input the 2 Using 120-ohm the cable
5 0 4
channels DCLS (RS422) balanced cable length and
signal connector
The system needs to number
output or (and) input the 2 Using 120-ohm according
6 0 4
channels 1pps+TOD balanced cable to the site
(RS422) signal survey
The system needs to result.
output or (and) input the 1 Using 120-ohm
7 0 2
channel 1pps+TOD balanced cable
(RS422) signal
The system needs to
Using 75-ohm
output or (and) input the 1
8 4 0 unbalanced pcs
channel 1pps+TOD
cable
(RS232) signal
The system does not need
9 to input or output the 0 0 pcs
reference clock.

3.12.3 Configuration Description of the Clock Cables of the CX600-X3

CX61MPUD board provides two RJ48 interfaces, supporting clock information and
time information input and output.
When clock transmission is applied, each one of the two RJ48 interfaces can support: one
channel balanced 2.048 MHz input and ouput, or one channel balanced 2.048 Mbps
input and output. The two RJ48 interfaces are configured separately.
When time transmission is applied, each one of the two RJ48 interfaces can support:
one channel 1PPS+TOD (RS422) input, or one 1PPS+TOD (RS422) output, or one

2018-11-28 Huawei Confidential Page 47 of 59


CX600 Site Survey Guide Internal Use

channel RS422 (DCLS input and output). The two RJ48 interfaces are configured
separately.

Table 3-8 Configuration description of the clock cables of the CX600-X3 with
double CX61MPUD
No. Applicable Environment Quantity of
Cables with RJ48 Unit
Connectors
The system needs to output or (and) input the 2
1 4 pcs
channels reference clock.

The system needs to output or (and) input the 1


2 2 pcs
channel reference clock.

The system needs to output or (and) input the 2


3 4 Calculate the
channels DCLS (RS422) signal
cable length
The system needs to output or input the 2 and connector
4 4
channels 1PPS+TOD (RS422) signal number
according to
The system needs to output or (and) input the 1 the site survey
5 channel DCLS signal and ouput or input 1 4 result.
channel 1PPS+TOD (RS422) signal

The system does not need to input or output


6 0 pcs
the reference clock.
For some specially applied, it is recommended to use the converter to transform the signal if
the interface type of local device is different from the remote device. For example, the interface
type of the remote device is SMB. In this case, you should use the converter to transform 75-ohm
unbalanced cable to 120-ohm balanced cable. Then can be connected to the RJ48 interface of local
CX600-X3 device. The method to transform the signal and cable is same with E1 interface. Please
refer to the following configuration description of E1 interface cables. Because the conversion
affects the signal, please decrease this application.

3.12.4 Configuration Description of E1/T1 Interface Cables


1)Configuration Description of the CR5M1CFE1 Interface Cables
The CFE1 line processing unit (LPU) (channelized E1 LPU) provides 24 E1 interfaces. The
interface type is DB100. For DB100-RJ48/SMB conversion, the converter box and Signal cable
are required. The cable connecting the LPU and the converter is 04070064.

Table 3-9 Configuration description of the converter and cables for the
CR5M1CFE1
BOM Number Description Configuration Principle
02351606 NetEngine80E,CR5Z1DCRF The converter of this type corresponds to one
,24*E1/T1 DB100 to RJ48 CR5M1CFE1 LPU. The LPU and the converter
Port Conversion Box are connected through the 04070064 cable. The
converter is separately packaged.

2018-11-28 Huawei Confidential Page 48 of 59


CX600 Site Survey Guide Internal Use

02351607 NetEngine80E,CR5Z1DCR The converter of this type corresponds to two


M,48*E1/T1 DB100 to RJ48 CR5M1CFE1 LPUs. The LPU and the converter
Port Conversion Box are connected through the two sets of 04070064
cables. The converter is separately packaged.

02351608 NetEngine80E,CR5Z1DCSF, The converter of this type corresponds to one


24*E1 DB100 to SMB Port CR5M1CFE1 LPU. The LPU and the converter
Conversion Box are connected through the 04070064 cable. The
converter is separately packaged.

04070064 Signal cable ,24E1 Transit It is used to connect the E1 converter and E1
Cable,4m,D100M- LPU. Each LPU is equipped with one cable of
I,3*CC16P0.4P430U(S)- this type.
I,D100M-I
If coaxial cables with SMB connectors are used, the converter 02351608 must be selected. If
twisted pair cables with RJ48 connecters are used, the converter 02351606 or 02351607 must be
selected.

2)Configuration Description of E1 Interface Cables


A) The peer interface (RJ48) uses the 120-ohm balanced cable
When the resistance of the interface on the peer device is 120 ohm (RJ48 connector), The
RJ48 connectors are on the both ends of the cables. The maximum transmission distance is 270 m.

Table 3-10 E1 trunk cable list (RJ48 interface)


No. BOM Description Quantity Unit
Number
One for pcs
Trunk Cable,3m,120ohm,1E1,0.4mm,MP8-
1 04040497 each E1
II,120CC4P0.4P430U(S),MP8-II,Expert 2.0 interface

One for pcs


Trunk Cable,15m,120ohm,1E1,0.4mm,MP8-
2 04040261 each E1
II,120CC4P0.4P430U(S),MP8-II interface

One for pcs


Trunk Cable,30m,120ohm,1E1,0.4mm,MP8-
3 04040496 each E1
II,120CC4P0.4P430U(S),MP8-II,Expert 2.0 interface
Trunk One for pcs
4 04040494 Cable,60.00m,120ohm,1E1,0.4mm,MP8- each E1
II,120CC4P0.4P430U(S),MP8-II,Expert 2.0 interface

One for pcs


Trunk Cable,80m,120ohm,1E1,0.4mm,MP8-
5 04040493 each E1
II,120CC4P0.4P430U(S),MP8-II,Expert 2.0 interface

2018-11-28 Huawei Confidential Page 49 of 59


CX600 Site Survey Guide Internal Use

Schematic diagram of E1 cable connections (peer device is RJ48 interface)

B) The peer interface (SMB) uses the 75-ohm unbalanced cable


When the remote interface is of the 75-ohm SMB connector, For the CFE1 LPU, the
02351608 converter should be selected, providing 24 SMB interfaces. Select corresponding cables
from the following table according to the site survey length.
In addition, no terminal is provided for the end of the selected cable that is connected to the
device of the office. In this application, the maximum transmission distance is shorter than 200 m.

Table 3-11 List of E1 trunk cables with SMB connectors


No. BOM Description Quantity Unit
Number
04026814 Single Cable,120ohm,75ohm Converter Box(With
1 SMB Socket 14040127),PCB03022834+Box Body 1 pcs
21210634)

04022627 Trunk Cable,10.00m,75ohm,2.2mm,SMB75SF-


2 V,SYFVZ75-1.2/0.25,HONET,W2524 2 pcs

04022629 Trunk Cable,20.00m,75ohm,2.2mm,SMB75SF-


3 V,SYFVZ75-1.2/0.25,HONET,DL2526 2 pcs

04060205 Trunk Cable,30.00m,75ohm,2.2mm,SMB75SF-


4 V,SYFVZ75-1.2/0.25,Wireless Intelligent Network 2 pcs

04023971 Trunk Cable,40.00m,75ohm,2.2mm,SMB75SF-


5 V,SYFVZ75-1.2/0.25,C&C08B,DL3133 2 pcs

04023972 Trunk Cable,50.00m,75ohm,2.2mm,SMB75SF-


6 V,SYFVZ75-1.2/0.25,C&C08B,DL3134 2 pcs

04043079 Trunk Cable,65.00m,75ohm,2.2mm,SMB75SF-


7 V,SYFVZ75-1.2/0.25 2 pcs

04042130 Trunk Cable,70m,75ohm,2.2mm,SMB75SF-


8 V,SYFVZ75-1.2/0.25 2 pcs

04042131 Trunk Cable,80m,75ohm,2.2mm,SMB75SF-


9 V,SYFVZ75-1.2/0.25 2 pcs

04042132 Trunk Cable,90m,75ohm,2.2mm,SMB75SF-


10 V,SYFVZ75-1.2/0.25 2 pcs

04043080 Trunk Cable,100.00m,75ohm,2.2mm,SMB75SF-


11 V,SYFVZ75-1.2/0.25 2 pcs

2018-11-28 Huawei Confidential Page 50 of 59


CX600 Site Survey Guide Internal Use

Trunk Cable,155M Self-


12 04060171 Loop,5m,75ohm,4.0mm,SMB75SF-IV,SYV75- 2 pcs
2/0.34(S),SMB75SF-IV,OptiX

The 5 m self-loop cable is with two SMB connectors. If the two device distance is near and in the
same cabinet, you can select this cable to connect with each other.

Schematic diagram of E1 cable connections (SMB interface)

3)Configuration Description of T1 Interface Cables


The interface type of T1 is RJ48. For DB100-RJ48/SMB conversion, the converter and
Signal cable are required. The interface impedance is in the 120 ohm balance mode, and the
interface can be directly connected to the T1 interface of the remote device. The maximum
transmission distance is 270 m. The T1 interface cables are selected from table 3-36 according to
the site survey result.

3.12.5 Configuration Description of E3/T3 Interface Cables


The CR5M14CT3 LPU provides 4 channelized E3 or T3 interfaces, Each E3 or T3 interface
has two ports: the sending port and the receiving port. The interface is of the SMB coaxial
connector. The interface impedance is in 75 ohm non-balanced mode (the E3 or T3 interface does
not support the balanced transmission mode). The 75 ohm coaxial cables are used to connect
corresponding devices (When the cables are connected to other devices, pay attention to the
relationship between the sending end and the receiving end.). The maximum transmission distance
is 270 m.
In addition, no terminal is provided for the end of the selected cable that is connected to the
device of the office. In this application, the maximum transmission distance is shorter than 200 m.
The cables are selected from the following table according to the site survey result.

2018-11-28 Huawei Confidential Page 51 of 59


CX600 Site Survey Guide Internal Use

Table 3-1 List of E3 trunk cables with SMB connectors


No. BOM Number Description Quantity Unit
04060171 Trunk Cable,155M Self-
1 Loop,5m,75ohm,4.0mm,SMB75SF-IV,SYV75- 2 pcs
2/0.34(S),SMB75SF-IV,OptiX

04044335 Trunk
2 Cable,155M/Clock/Lightning,10m,75ohm,3.9m 2 pcs
m,SMB75SF-IV,SYV75-2/0.34(S)

04044336 Trunk
3 Cable,155M/Clock/Lightning,20m,75ohm,3.9m 2 pcs
m,SMB75SF-IV,SYV75-2/0.34(S)

04044337 Trunk
4 Cable,155M/Clock/Lightning,30m,75ohm,3.9m 2 pcs
m,SMB75SF-IV,SYV75-2/0.34(S)

The 5 m self-loop cable is with two SMB connectors. If the two device distance is near and in the
same cabinet, you can select this cable to connect with each other.

3.12.6 Configuration Description of EPS200-4850A Monitoring Cables


When CX600-X8 or CX600-X16 is used on the AC power supply environment, for AC/DC
conversion, EPS200-4850A AC power supply frame is required. DC chassis monitors the AC
power supply frame through the monitoring cable using the 485 bus. One end of this cable is
connected to the AC power supply frame, the other end of this cable is connected to the DC
chassis.

Table 3-2 Configuration Description of EPS200-4850A Monitoring Cables


BOM Description Configuration Principle
Number
0408007 Monitor and Alarm One for each CX600-X8 AC chassis;
6 Cable,3m,D9M,CC4P0.48B(S),D9M Two for each CX600-X16 AC chassis

The length of monitoring cable is 3 m, it’s recommended to keep the AC power supply frame and
chassis within 3 m. Otherwise, can not monitor the AC power supply frame.

3.13 Cabling Modes and Cabling Racks


You need to survey cabling racks only when they are specified in the contract.
Upward cabling:

2018-11-28 Huawei Confidential Page 52 of 59


CX600 Site Survey Guide Internal Use

Cable ladders can be hung on the ceiling or be supported by the wall. Cable ladders cannot be
supported by the top of the rack. If cable ladders are fixed in other modes, make a remark on the
"others" column.
The lower surfaces of cable ladders must be at least 2.2 m from the installation surface.
Otherwise, the rack is hard to install. When cable ladders are higher than 2.8 m, you need to install
a downward cabling ladder. The bottom of the downward cabling ladder should be 2 m away from
the installation surface.
Downward cabling:
Usually, antistatic floors are laid out in the equipment room if cables are laid out downward.
When there is an exception, lay out cables according to the actual conditions. Otherwise, you must
lay out cabling troughs along the cabling direction, including the cabling troughs from the
broadband devices to the operation terminals.
The cabling mode is related to whether the rodent-proof mesh for the cabinet has cable holes.
Therefore, the availability of cable holes on the rodent-proof mesh must be specified. When
upward cabling is adopted, the cabling racks must be strong and horizontal. The longer side of the
cabling rack must be parallel with the wall surfaces. The end of the downward cabling ladder must
be 2 m away from the installation surface.
If the contract specifies that the cabling racks are to be provided by Huawei, the path of
cabling racks must be marked in the layout of the equipment. Fill in the Survey Datasheet for
Auxiliary Devices and submit it to the configuration department together with the Site Survey
Report.

3.14 Site Survey Memorandum


The items unspecified in the site survey report should be recorded in the Site Survey
Memorandum. If necessary, the items unspecified in the site survey report should be recorded in
an appendix and signed by the customer.
1. During the site survey, if the customer does not meet the site survey conditions completely
or partially, inform the customer that the site survey cannot be performed in time, and the
shipment and project schedule will be affected according the clause of the contract. Write down
this in the Site Survey Memorandum. Request the customer to sign it and report the result to the
local office and headquarters.
2. If certain items are found not completed by the customer during the survey but the site
survey is unaffected, write down the unfinished items in the Site Survey Memorandum. The
requirements for each item and the completion date (earlier than the start of the project) must be
specified. Request the customer to sign it and report the result to the local office and headquarters.
3. During the site survey, the items not mention in the Site Survey Report and articles, such
as the cables and boards of special models (length and interface) customized for the customer
must be recorded in the Site Survey Memorandum.

2018-11-28 Huawei Confidential Page 53 of 59


CX600 Site Survey Guide Internal Use

4. If the customer raises special requirements, which mismatch Huawei's existing products or
cannot be met currently, list these requirements, write them down in the Site Survey
Memorandum, and report these requirements to the local office and headquarters.
For example, whether users have special requirements for the color of power cables and
have strict requirements for the length of optical fibers.

4 Inspection of the Installation Environment

4.1 Equipment Room Conditions


If the device operates for a long time in the equipment room, the temperature in the
equipment room should range from 15°C to 30°C and the relative humidity should range from
40% to 65%. If the device operates for a short time in the equipment room, the temperature in the
equipment room should range from 0°C to 45°C and the relative humidity should range from 20%
to 90%.Ensure that the device is protected against electrostatic discharge and electromagnetic
interference.
The floor of the equipment room must meet the bearing requirement of at least 450 kg per
square meter. The floor can be cement, water-polished stones, resin-painted floor, or antistatic
floor. The floor must be dust-proof, fire-proof, insulated, and wearable.
The height of the antistatic floor indicates the height from the ground to the upper surface of
the movable floor. Antistatic floors of 300 mm or 330 mm high are recommended for new
equipment rooms. If the equipment room is installed with movable floors, a base for the cabinet is
required. If it is stated in the contract that the base will be prepared by the customer, the size of the
base needs to meet the installation requirements.
The net height of the equipment room indicates the distance between the installation surface
and the lower surfaces of the girders or ventilation pipes. If upward cabling is adopted, the net
height should be greater than 3 m; if downward cabling is adopted, the net height should be
greater than 2.7 m. To facilitate the entrance to and exit from the equipment room, the size of the
door for the equipment room should be at least 2 m high and 1 m wide.

4.2 Preparation Guide for Engineering Installation of


CX600 Products
When submitting the Preparation Guide for Engineering Installation of CX600 Products to
the customer, remind the customer to prepare network resources according to the Network
Resource Planning Table and report lack of resources. Explain the meaning of each item to the
customer. Network resource planning includes planning of network address prefixes, IP addresses,
clocks, and signaling versions. IP address planning refers to the allocation of IP addresses to
broadband switches, MA series devices, such as MPUs and LAN switches, severs, the Network
Management System (NMS), and operation terminals. Clock planning refers to determination of
the sources clock for the Datacomm products (self-excitation clock or circuit-tracking clock). If a

2018-11-28 Huawei Confidential Page 54 of 59


CX600 Site Survey Guide Internal Use

circuit-tracking clock is used, you need to find the optical interface or service interface from
which the circuit-tracking clock source originates.

4.3 Required Material and Responsibility Division


The equipment and material to be prepared by Huawei and the customer, and responsibility
division can be specified in a diagram.
The device part of the responsibility division diagram must be based on the contract. If the
responsibility division diagram is to be provided by Huawei, change the broken lines to real lines.
Usually, the fiber jumpers, network cables, and electric cables to be provided by Huawei are not
longer than 15 m. Therefore, the customer should place the interfaces for service cables (adaptors
included) close to broadband devices. If certain responsibility is unspecified in the commercial
contract, you should negotiate with those who handle the contract and the customer. If the division
of material provision and project implementation are various, work out diagrams for material
provision and project implementation separately.
If the customer requests us to provide material that is unspecified in the contract and that is
usually not provided by Huawei, contact the sale personnel to solve the problem.

4.4 Network Consolidation


Network consolidation is involved in the inheritance of existing devices. Therefore, site
survey for a network consolidation project must be carefully carried out and recorded.
Devices, boards, and software can be replaced on the network based on the actual capacity
and networking diagram.
Layout of the devices in the equipment room. Fill in the board and frame location diagrams
for previous devices, and rack information.
Types and quantities of cables.
Special interfaces, boards, and devices for the network.

5 CX600 System Parameters


Maximum Input channel
Power power of power of each Maximum Empty Full
Device supply supply supply power supply Input Maximum Chassis Chassis
Type mode module module module Current Power Weight Weight
DC NEPS5000-D 2 3 55A*3
CX600-16 DC NEPS8000-D 2 3 75A*3 6000W 152kg 250kg
AC NEPS5000-A 2 3 10A*3
DC NEPS3000-D 2 1 85A
CX600-8 2200W 97kg 147kg
AC NEPS3000-A 2 1 21A
DC NEPS3000-D 2 1 85A
CX600-4 1400W 56kg 87kg
AC NEPS3000-A 2 1 21A
CX600-X3 DC CR52PEMA 2 1 42A 1100W 15kg 36kg

2018-11-28 Huawei Confidential Page 55 of 59


CX600 Site Survey Guide Internal Use

AC EPW30B-48A 2 1 10A 25kg 46kg


DC CR52PEMB 4 1 70A
CX600-X8 2800W 43kg 118kg
AC EPW50-48A&V 4 1 18.5A
DC CR52PEMB 8 1 70A
CX600-X16 5360W 94kg 238kg
AC EPW50-48A&V 8 1 18.5A
: The power and weight are variable when the device is configured with different LPU
boards. Please get the details from the product sales engineer.

Appendix: Guide to fill in the survey


report

A. Environment of Equipment Room


Please fill in Cabinet type, Floor height, Power Mode, Type of Grounding, the quantity of
side doors according to the site survey. And fill in the quantity of connecting plate when
combining cabinets.
Floor height (mm) : For the height of cement ground, fill in “0”
Floor height: _______mm
directly.
□No cabinet
□N68E-22
Cabinet type
□19'open rack
□Other:_____
□Through chassis
□Through cabinet
Type of Grounding
□through the cabinet with other
device together
Quantity of side doors(pcs): When the cabinets are installed in a
combined way, each row needs two side panels, and N rows
Equipment Room need 2*N side panels. When N68E-22 cabinet and N68-22
Quantity of N68E side doors:
Environment cabinet are install in a combined way, the side panel of N68-22
_______PCS
must be removed, as the side panel of N68-22 is not fit to
N68E-22 cabinet, you need to survey one side panel of N68E-22
in addition.

Quantity of Connecting plate for combining cabinets(pcs):


Connecting plate is only used when N68E-22 and N68-22
Quantity of Connecting plate for
cabinet are combined together, connecting plate
combining cabinets: _______PCS
configuration principle: One piece of connecting plate is
required for combining one N68E and one N68 cabinets.
□-48V
Power Mode(-48V/110V/220V) □110V
□220V

2018-11-28 Huawei Confidential Page 56 of 59


CX600 Site Survey Guide Internal Use

B. Power cables and PGND power cables


Measuring the distance between the customer’s PDF and the chassis of this project. Please
fill in the length of one power cable.

Single length of AC power cable: The power cables of


AC power cables Single length of power cable:
NE5000E/80E/40E,ME60,CX600 chassis or power distribution
of chassis _______m
box are connected to Customer's AC power system directly.

Single length of -48V power cable (m): The power cables of


Single length of power cable:
NE5000E/80E/40E,ME60,CX600 chassis are connected to
_______m
DC power cables Customer's PDF directly.
of chassis Single length of GND power cable (m): The power cables of
Single length of power cable:
NE5000E/80E/40E,ME60,CX600 chassis are connected to
_______m
Customer's PDF directly.

1. Chassis is connected to the grounding bar of equipment room directly, the length of cable
is the distance between the chassis and the grounging bar.
2. Cabinet is connected to the grounding bar of equipment room directly, the length of cable
is the distance between the cabinet and the grounging bar.
3. Grounding through the cabinet with other device together, the length of cable is the
distance between the chassis and the grounding connector on the cabinet.
Please fill in the length of grounding cable according to the grounding type.

Single length of PGND power cable of Chassis or Cabinet (m):


1. Chassis is connected to the grounding bar of equipment room
directly, the length of cable is the distance between the chassis
and the grounging bar.
2. Cabinet is connected to the grounding bar of equipment room Single length of power cable:
directly, the length of cable is the distance between the cabinet _______m
and the grounging bar.
3. Grounding through the cabinet with other device together, the
length of cable is the distance between the chassis and the
PGNG power grounding connector on the cabinet.
cables Single length of PGND power cable of power distribution box
(m): 1. Chassis is connected to the grounding bar of
equipment room directly, the length of cable is the
distance between the chassis and the grounging bar.
2. Cabinet is connected to the grounding bar of equipment Single length of power cable:
room directly, the length of cable is the distance between _______m
the cabinet and the grounging bar.
3. Grounding through the cabinet with other device
together, the length of cable is the distance between the
chassis and the grounding connector on the cabinet.

C. Fiber Jumpers and Other Cables


Please fill in the fiber type, fiber number, the length of one fiber, connector type of
the peer endpoint.

2018-11-28 Huawei Confidential Page 57 of 59


CX600 Site Survey Guide Internal Use

□SM
Single mode/multi-mode (SM/MM)
□MM
Single length of fiber:
Length(m)
_______m

Patch cord Quantity(PCS) Quantity of fiber: _______PCS


□FC/PC
Peer end connector type: The common patch cord connector □SC/PC
types are: FC/PC, SC/PC and LC/PC. If any other type is □LC/PC
adopted, please fill in the full name of the type. □MT-RJ
□Other:_____

Please fill in the impedance type, connector type, length of one cable just when the E1 trunk
cables are required.

□75Ω
Impedance (75Ω/120Ω)
□120Ω
Peer end connector (not required/SMB/BNC/other) : The □Not required
common trunk cable connector types are: SMB/BNC/SMA. If □SMB
Trunk cable
any other type is adopted, please fill in the full name of the type. □BNC
If connector is not required, fill in "No". □Other:_____
Length (m) Single length of cable: _______m

Please fill in the impedance type, connector type, length of one cable just when the clock
cables are required.

□75Ω
Impedance (75Ω/120Ω)
□120Ω
□Not required
□SMB
Clock Cable Peer end connector (not required/SMB/BNC/other)
□BNC
□Other:_____
Length (m) Single length of cable: _______m

Please fill in the length of twisted-pair cable, the RJ45 connector number.

Total length of the twisted-pair


Total length of the twisted-pair network cable (m)
Miscellaneous network cable: _______m
cable Quantity of RJ45 connector:
Quantity of RJ45 connectors (PCS)
_______PCS

D. Others
For some special material, please fill in here.

Remarks (For some special material, please fill in here.)

2018-11-28 Huawei Confidential Page 58 of 59


CX600 Site Survey Guide Internal Use

References:

1. CX600 V600R001 Product Configuration Manual

2. CX600 Site Survey Guide(7[1].2)-20081227-B

2018-11-28 Huawei Confidential Page 59 of 59