Scaffolding
Engineering
www.peri.com
Scaffolding Technology
Scaffolding Technology
Edificio Ágora, Valencia, Spain
Technology
References
Edition 03 | 2016
PERI GmbH
Formwork Scaffolding Engineering
Rudolf-Diesel-Straße 19
89264 Weissenhorn
Germany
Tel. +49 (0)7309.950-0
Fax +49 (0)7309.951-0
info@peri.com
www.peri.com
PERI – The Company 20 PERI UP with Decking UDG and 52 PERI UP with Decking UDS and
Ledger UH Ledger UHD
4 PERI – your reliable partner worldwide
6 Continuous support 22 PERI UP Flex Modular Scaffolding 54 Frame Scaffolding
during all project phases PERI UP T 72 / T 104
24 Industrial Scaffolding
8 Intelligently-designed products 56 Facade Scaffolding
in the very best quality 28 Suspended Scaffolds
50 Facade Scaffolding
2
Building Construction Industrial Structures Combined solutions with
formwork and scaffolding
68 Central Railway Station, Wiesbaden, 100 Westfalen Power Plant, Hamm,
Germany Germany 128 Motorway Bridge T4,
Paradisia-Tsakona, Greece
70 Haramain High-Speed Rail Link Phase 1, 102 Dedusting System for Blast Furnace 9,
KAEC Station, Saudi Arabia ThyssenKrupp Steel Europe, 130 Bridge over the Golden Horn,
Duisburg, Germany Istanbul, Turkey
72 Technology Centre, Falkenberg School,
Sweden 104 Waste Incineration Plant, Klaipeda, 132 Parco della Musica e della Cultura,
Lithuania Florence, Italy
74 “The Bow”, Calgary, Canada
106 Biocel Pulp Mill, Paskov,
76 CIS/Interporto di Nola Service Centre, Czech Republic
Naples, Italy
108 Mugardos LNG Regasification Terminal,
78 New Surgery Clinic, Ulm, Germany La Coruña, Spain
3
PERI – your reliable partner worldwide
Working successfully in the market for more than 45 years
For more than 45 years, PERI has been a In addition to the headquarters in Weissen- We know and understand the requirements
competent provider of formwork and scaf- horn, over 60 international subsidiaries with of our customers intimately, and support
folding systems. Apart from proven and numerous branch offices and more than them from the first solution idea to beyond
innovative products and systems, PERI also 100 logistic sites ensure close proximity to the successful conclusion of the project.
offers a wide range of services which our customers and markets.
improve and further increase the cost-effec- In the process, our maxim is enhanced cus-
tiveness of the project implementation. With the in-depth technical know-how of tomer service in all respects. All our
These include not only individual planning our employees along with extensive knowl- employees apply this guiding principle on a
and structural calculations but also, for edge of local requirements, market and day-to-day basis and around the world –
example, optimized logistical operations practice-oriented solutions are realised for they have shaped PERI since the company
and constant support for our customers all construction projects – whilst always tak- was founded. This fact along with our expe-
during construction. ing into consideration the total costs result- rience from over 40 years of company his-
ing from labour and materials. tory as well as our worldwide activities ben-
efit each customer and every project –
regardless of size.
4
The very latest production facilities along with the Product development at PERI is teamwork: Apart from the purchasing option, PERI also offers the
expertise of the PERI workforce, efficient operational practice-oriented as well as easy and safe to use possibility of renting formwork and scaffolding sys-
processes and stringent quality tests guarantee the high scaffolding are a result of the collaboration of specialists tems. In particular, the combination of both models
quality of PERI products and systems. in the field, development and maunufacturing. allows cost-effective project realisation.
5
Continuous support provided in all project phases
Your requirements are our business
Our services and performance are pro- The sales engineer is the main point of con- Requirements are analyzed on a project-re-
ject-specific overall concepts which bring tact for our customers; he has profound lated basis, solution proposals are created
our customers decisive competitive advan- specialist knowledge and knows the and the price-performance ratio is carefully
tages. We also support the contractors and requirements and needs of the project par- considered. Detailed discussions with the
site management during the construction ties exactly. The extensive network of sales sales engineers, experts from specialist
phase – continuously throughout the whole engineers thus ensures close proximity to departments and the site management
project. the users along with providing reliable sup- result in optimised and cost-effective
port. scaffolding solutions.
Project process
7
Intelligently designed products with the best quality
Well thought-out down to the last detail and designed for the
greatest possible service life
80 80
80
80
0
80 8
The PERI UP Rosett allows connections with angles up The guardrail can be mounted by means of a simple The contour of the rosette prevents the verticals from
to 45°. waving movement. rolling away and facilitates the stacking of the tubes.
The Ledger Brace UBL allows extremely fast and easy Well thought-out in every detail: in spite of the integrat- With the Ledger-to-Ledger Coupler UHA, ledgers can be
assembly. ed handle lock, the spindle can be adjusted to any mounted at any position of another ledger.
height.
8
Customer-oriented engineering services
Project-related preparation results in the best solution
2.40
9
PERI Software
ELPOS and PERI CAD – optimised software for scaffold planning
10
In PERI CAD, multiform mass elements can be creat-
ed which are then automatically scaffolded. Even
with uneven ground contact areas, the solution is
created at the touch of a button.
PERI ELPOS and PERI CAD also allow simple planning of stair towers: based on the ground plan and
height dimensions, the stair towers are then automatically created.
With PERI CAD, complete shoring solutions can be planned in 3D – with towers, framework units or birdcage scaffolds. Three-dimensional views enable an easier under-
standing of complex scaffolding constructions.
11
Expertise in logistics and distribution
On-site support and throughout the entire course of the project
Apart from the purchasing option, PERI also an investment that building contractors
offers the possibility of renting formwork should be making themselves. For covering
and scaffolding systems. In particular, the peak demand periods as well as for special
combination of both models aids cost-effec- applications, the rental option usually repre-
tive project execution: those materials sents the optimal solution.
which can be utilized on a long-term basis is
12
Complete safety in the execution
Reliable provision of technical documentation
13
PERI Customer Seminars
Our knowledge and expertise for your personnel
14
A large number of training centres world-
wide provide the best opportunities for
our customers of obtaining valuable
know-how for the practice.
15
Scaffolding – then and now
From individual constructions to modular scaffolding
Although many ancient buildings could not From the beginning of the 19th century, At the end of the 1990s, PERI developed
have been realised without the correspond- more complex scaffolding constructions the PERI UP scaffold system. Thereby, the
ing scaffolding, only a few documents or were developed which featured more company could rely on the valuable experi-
illustrations are available. As evidence has metallic materials. ence gained with the requirements regard-
shown, already in Ancient Egypt timber ing working platforms and safety scaffold in
supports and boards were connected by The first steel tube and coupler scaffold formwork construction. At that time, PERI
ropes to form load-bearing and working appeared in 1930 while the first system also already had comprehensive knowledge
scaffolding, while components made of iron scaffolding in Germany was introduced in about safety regulations.
were additionally used in Ancient Greece. In 1952. Today, modular systems determine
Asia, bamboo scaffolding has been used the scaffolding industry.
from time immemorial.
16
The development of PERI UP
Adapted perfectly to meet the needs of the user
The most important consideration for The requirements for a modular scaffolding Combined with new industrial decking, the
designing the new scaffold system was to system – flexibility, low weight while simul- PERI UP Flex modular scaffolding is an
ensure that users are protected against fall- taneously maintaining a high load-bearing extremely flexible modular scaffold for
ing when entering the next level. On this capacity and excellent handling – were fully numerous applications – from shoring for
basis, PERI UP T 72 / T 104 frame scaffold- meet by PERI with the development of the accommodating high loads through to
ing was developed – optimized for facade PERI UP Rosett: for easy and safe assem- adaptable industrial scaffolding complete
work and featuring two different system bly, the wedge drops into the hole through with the highest safety requirements. For
widths of 72 cm and 104 cm. The guardrail its own force of gravity when inserting the the new industrial decking, with an integrat-
for the next scaffold bay is mounted with- wedge head into the Rosett, and locks auto- ed lock against lifting and a non-slip perfo-
out any additional parts with the T-frame. matically. Positioned every 50 cm, the rated surface, a system width of 25 cm was
Scaffolders can work safely and quickly on Rosett node provides connection possibili- selected. As a result, the working platforms
every assembly level through the integrated ties in all directions. Complicated geome- can be completely covered without leaving
collective anti-fall safeguards in the system tries can also be scaffolded cost-effectively, any gaps and allow virtually any adjust-
– without rope protection. e.g. old buildings with bay windows and ments to be carried out in order to suit local
cantilevers. conditions.
17
PERI UP with UDG Decking and UH Ledgers
The maximum flexible modular scaffolding
PERI UP Flex
PERI UP Flex:
Maximum adaptability to match virtually any local
geometrical conditions.
Applications
■ Industrial Scaffolding
■ Shoring
■ Working Scaffolding
■ Working Platforms
■ Access
■ Pedestrian Bridges
■ Facade Scaffolding
18
PERI UP with UDG Decking and UHD Ledgers
As PERI UP T 72 / T 104 frame scaffolding particularly safe, as
PERI UP Rosett modular scaffolding extremely versatile
PERI UP T 72 / T 104: integrated collective safety against fall- PERI UP Rosett: high degree of flexibility for complex forms
ing on every assembly level through the T-frame construction. through the use of Rosett standards and ledgers
Applications Applications
■ Facade Scaffolding ■ Facade Scaffolding
■ Access
19
PERI UP with Decking UDG and Ledgers UH
The extremely flexible PERI UP Flex Modular Scaffolding
20
Kapitel
UDG – UH
Applications
24 Industrial Scaffolding
28 Suspended Scaffolding
30 Shoring
36 Working Scaffolding
37 Working Platforms
38 Requirement-specific solutions
through combination with PERI
steel components
40 Access
46 Pedestrian bridges
50 Facade Scaffolding
21
PERI UP Flex Modular Scaffolding
System details
After installation, the decks of the modular scaffolding are locked in place: simply by The Gravity Lock guarantees fast and safe assembly.
the force of gravity, the securing hook slides under the ledger – and the deck is During the ledger assembly, the wedge falls into the
immovably fixed in position. opening of the Rosett through its own force of gravity
and locks automatically.
22
UDG – UH
23
PERI UP Flex Modular Scaffolding
Industrial Scaffolding
Due to the high degree of adaptability of the system The Gravity Lock allows quick and safe assembly with For connecting ledgers and standards to existing ledg-
scaffold, complex scaffolding tasks can also be easily site personnel always in a secure position. By inserting ers, appropriate connection means are available. In this
and quickly realized. By changing the direction of the the wedge head into the Rosette, the wedge drops by way, for example, obstacles and discontinuities such as
decking, working areas can be covered virtually gap- force of gravity into the hole and then locks in position. large pipes can be accommodated.
free.
For the use in industrial facilities, the scaf- Toe boards are painted in a signal colour, With the trolley, moving completely assem-
folding system must be extremely adapta- and are always installed between two verti- bled platforms is possible. The permissible
ble. At the same time, all working areas cal scaffold tubes. They border the working load is 19.7 kN. The position of the standard
which have been erected must fulfil the platforms on all sides and can also be used with regard to the girder axis is continuous-
highest safety requirements. In addition, around corners. Toe boards are non-com- ly adjustable up to 125 mm.
the user demands fast assembly. bustible, have a very low weight and can
easily be stacked on top of each other.
PERI UP Flex takes all of these require-
ments into account. UDG Industrial Decks
feature an integrated lock against lifting as
well as having non-slip perforated surfaces. UPY 50
24
UDG – UH
The small width of the UH Ledger allows up to 4 ledgers Platform completely covered by PERI UP system decking. The lightweight ledger serves both as support for
to be carried at any one time by one scaffolder. the decks as well as guardrails. For platforms, stand-
ard or reinforced ledgers are used depending on load
requirements.
25
PERI UP Flex Modular Scaffolding
Industrial Scaffolding
Refinery Expansion C-10, Cartagena, Spain As Pontes Power Station, La Coruña, Spain
26
UDG – UH
Elektrownia Ostrołęka B Power Station, Poland Kralupy nad Vltavou Oil Refinery, Czech Republic
27
PERI UP Flex Modular Scaffolding
Suspended Scaffolding
28
UDG – UH
The PERI suspended scaffold solution on the basis of The PERI UP suspended scaffold solution served as By means of RCS Rails and UFS 20 Trolleys from the
the PERI UP Rosett modular scaffolding also made use working scaffold as well as access means for the safe PERI UP system, a suspended scaffold for transporting
of rentable PERI formwork system components. and problem-free replacement of the glass fibre mem- bulky components could be easily moved through the
branes. window openings to the outside.
29
PERI UP Flex Modular Scaffolding
Shoring – Shoring Towers
30
UDG – UH
The modular structure of PERI UP Flex allows optimal For the erection of a tower with 16 legs, loads of
adjustment of the load area of influence to suit the up to 64 t can be carried.
respective load-bearing capacity of the legs.
Cross Forkhead
64 t
Ledger
3.00
2.50
2.00
Standard
1.50
Base Standard
1.50
2.00
Base Spindle
2.50
3.00
31
PERI UP Flex Modular Scaffolding
Shoring – Shoring Towers with Additional Frames
The shoring tower assumes the bracing As an extension of a PERI UP Flex shoring
function while the additional frames are
simply “attached”.
tower, up to two additional frames can be
attached to the tower – on one or both
sides. The lengths of the spacing ledger
are freely selectable between 25 cm and
300 cm.
32
PERI UP Flex Modular Scaffolding UDG – UH
Assembly of the shear frame arrangement The variable spacing of the shear frames
is based on shoring towers which are con- allows optimal adjustment to suit the loads
nected in one direction and thus function as of the superstructure. Compared to a bird-
shear frames. cage scaffolding solution, material savings
can therefore be made when using shear
The tower can be erected with widths rang- frames.
ing from 1.50 m up to 3.00 m in 50 cm
increments. The width of the shear frame is
variable. On the basis of a 1.50 m standard
field, load-optimised field adjustments are
possible in many system lengths.
33
PERI UP Flex Modular Scaffolding
Shoring – 3D Shoring Structures
PERI UP Flex showcases its complete varia- realizable with standard materials and each other. Units can be pre-assembled on
bility when creating three-dimensional shor- requiring very little time and effort. The high the ground and subsequently joined together
ing structures. Here, the positions of the rigidity of the ledger connections maintains to form large shoring scaffolds. Working plat-
legs can be adapted exactly to match the the shape of even very large scaffolding forms for formwork operations as well as
on-site load requirements. Very high load units when being moved with the crane or access stairs can be integrated in the shor-
concentrations can be transferred just as by means of rollers. Tension-proof connec- ing through the installation of system decks.
easily as small area loads. Adjustments to tions are used to connect the standards to
very complicated geometrical shapes are
Each standard is positioned in the system to suit both the geometry and the load to be carried.
34
UDG – UH
35
PERI UP Flex Modular Scaffolding
Working Scaffolding
36
PERI UP Flex Modular Scaffolding UDG – UH
Working Platforms
Safe means for climbing up and down – easily integrated in the system.
37
PERI UP Flex Modular Scaffolding
Requirement-specific solutions through combination with PERI
steel components
The PERI product range also includes Through the worldwide PERI rental park
numerous steel components which can be network, solutions are not least extremely
combined as required with PERI UP. Opti- cost-effective because the standardized
mized shoring structures and working plat- system components can be rented accord-
forms can be designed especially with sys- ing to project-specific requirements each
tem components taken from the VARIOKIT time. Thus, the scope of tasks for the scaf-
Engineering Construction Kit. Through the folder is extended to additional areas with-
detailed and comprehensive planning, inter- out requiring any further investment.
face problems during the planning process
and on the jobsite are eliminated. In addi-
tion, formal procedures for users is much
easier and less time-consuming as PERI
also provides verifiable statics on request. For the demolition work required for the revolving res-
taurant on the Henninger Turm, PERI UP Flex served
both as 16 m high protection scaffold as well as a work-
ing platform. Cantilever-mounted RCS Climbing Rails
formed a stable assembly level at a height of 100 m.
38
UDG – UH
39
PERI UP Flex Modular Scaffolding
Access – Staircase Alu 75
Staircase Alu 75
UAS 75 x 150/100
40
UDG – UH
41
PERI UP Flex Modular Scaffolding
Access – Staircase Steel 100, 125
42
UDG – UH
Assembly without
tools: lightweight indi-
vidual steps interlock
during installation and
secure automatically.
For construction sites with high load and With a permissible load of 3.00 kN/m², the
accessibility requirements: the PERI UP stair tower can be erected up to a height of
Staircase Steel 100, 125 is erected as a 50 m. Assembly is simple and fast. The
10-leg tower with landing widths of 100 cm, stringers are mounted first followed by the
125 cm or 150 cm. In connection with the steps which interlock during installation.
step widths of 100 cm or 125 cm, the site The top step secures all the others.
stair provides easy and convenient access –
with space enough to pass.
43
PERI UP Flex Modular Scaffolding
Weather protection roofs with the LGS Lattice Girder System
44
UDG – UH
15°
45°
120°
150° 45°
45° 15°
120°
15° 15°
150°
For buildings with flat roofs or small roof pitches, a Using 45° supports, non-symmetrical weather protec- This weather protection roof with multiple pitches shows
weather protection roof can be erected using standard tion roofs and steeper roof forms can also be realised. that even the most difficult types of roof can be optimally
components. enclosed. The side scaffold can stop at the eaves.
Smooth-running rollers support the uniform rolling up The roof elements can be moved in the longitudinal
procedure and fast dismantling of the Keder tarpaulin direction by means of wheels so that, for example, For retracting the tarpaulin, a solution with an electric
across the entire field width. materials can be lifted in by crane. motor can be used.
45
PERI UP Flex Modular Scaffolding
Temporary pedestrian bridges with the LGS Lattice Girder System
46
UDG – UH
47
PERI UP Flex Modular Scaffolding
Working platforms with the LGS Lattice Girder System
48
UDG – UH
With the LGS lattice girder system, safe Scaffold towers from the PERI UP Flex
working platforms can be realised at great modular scaffolding form the support struc-
heights. At the same time, the system pro- ture underneath the platforms whereby the
vides sufficient space for storing materials. use of Rosett nodes fixed to the girder ele-
In addition, the area underneath the plat- ments makes intersections and adjust-
forms is protected due to the installation of ments much easier. Different types of sup-
system decking along with dirt and dust- port open up a wide range of application
proof sheeting. As a result, the area under possibilities.
the platform can be used independent of
construction work operations.
The URW Wheel has four castors. This
allows the working platform to be
moved along the URT Aluminium Rails
in both longitudinal and transverse
directions.
Working platforms in a church dome in Italy for carrying In addition to safe working areas, this LGS working plat-
out refurbishment work. form for the renovation of the steel roof also provided
protection for pedestrians against falling objects.
Movable support with wheels on aluminium rails: the Fixed or mobile support on steel girders: a cost-effec-
upper part is completely independent of the lower Fixed or movable support directly on the scaffold sub- tive solution with project-specific steel profile sup-
part. As a result, optimal adjustments to loads and structure: the grid dimensions of the modular scaffold ports. The 50 cm grid of the sub-structure is discon-
spans are possible. are maintained along the whole length of the LGS. tinued.
100
100
100
50
50
50
50
50
50
50
49
PERI UP Flex Modular Scaffolding
Facade Scaffolding
A further application of the PERI UP Flex The flexibility of the PERI UP Flex scaffold-
is facade scaffolding. ing allows a range of widths which are
adapted to suit the respective requirements
For this, decking with a width of 37.5 cm of the user. With few additional compo-
is particularly suitable as a 75 cm wide nents such as console brackets or strength-
standard scaffold bay can be easily and ened ledgers, complicated facade geome-
quickly be covered with only two decks. tries can also be easily scaffolded.
50
UDG – UH
The scaffolding width is freely selectable and can be Circular structures can also be easily scaffolded with
adapted to met a wide range of requirements. PERI UP Flex.
51
PERI UP with UDG Decking and UHD Ledgers
Particularly safe as PERI UP T 72 / T 104 frame scaffolding,
extremely versatile as PERI UP Rosett modular scaffolding
52
Kapitel
UDS - UHD
Applications
56 Facade Scaffolding
Applications
60 Facade Scaffolding
62 Access
53
PERI UP T 72 / T 104 Frame Scaffolding
System details
Base Frame
With the integrated lock against lifting, the deck is Safe assembly without tools: the guardrails can be The scaffolding decks can be easily removed and re-
immediately secured after being placed in position mounted easily and quickly – on the inside as well as installed – access openings can therefore be realized at
and moved sideways. outside. any time.
54
UDS - UHD
55
PERI UP T 72 / T 104 Frame Scaffolding
Facade Scaffolding
PERI UP T 72
System width 72 cm
Decking area width 64 cm
Load Classes 1 to 4
PERI UP T 104
System width 104 cm
Decking area width 96 cm
Load Classes 1 to 6
56
UDS - UHD
Work sequence for assembly: The guardrail is subsequently Finally, the UDS Steel Deck
at first, a UVT T-Frame is installed and connected to the next T-frame is mounted from below by the
then the UPG Guardrail is attached. and inserted. scaffolder in a safe position.
57
PERI UP Rosett Modular Scaffolding
System details
Base Standard
UVB
116 mm
With the integrated lock against lifting, the deck is immedi- High rigidity through the large spacing
ately secured after being placed in position and moved between contact points of 116 mm.
sideways.
58
UDS - UHD
59
PERI UP Rosett Modular Scaffolding
Facade Scaffolding
60
UDS - UHD
The perfectly matched system and component dimensions allow The requirements regarding working safety also remain fulfilled:
any combination of frame scaffolding with modular scaffolding. the guardrail heights fully comply with regulations and toe
The integrated protection against lifting provides access ways of boards can be fitted from end to end.
equal height and without any obstacles.
PERI UP T 72
PERI UP Rosett 72
72
ett
Ros
UP
RI
PE
T 72
UP
RI
PE
Frame scaffolding and modular scaffold- With a combination one above the In the areas of PERI UP Rosett modular If elements of the modular scaffolding are
ing can be combined next to each other other, coupler braces are to be scaffolding, scaffolding frames can be integrated in the frame scaffolding, the ledg-
with end-to-end guardrails. arranged in the transition level. The integrated. Bracing takes place by ers provide the bracing in the area of the
Rosett only requires diagonal bracing means of face braces. modular scaffolding.
in the lowest level.
61
PERI UP Rosett Modular Scaffolding
Access – Staircase Alu 64
62
UDS - UHD
Stair tower with alternating staircase Stair tower with staircase units in the
units provides large head clearance and same direction is the preferred type for
shorter walking distances for site person- installation work and, apart from provid-
nel between levels. ing access, also offers work platforms.
63
PERI UP Rosett Modular Scaffolding
Public Stairways – PERI UP Public
For temporary stairs used in public areas, With a low number of individual compo-
special attention is paid for ensuring the nents, a wide range of structures can be
safety of the users. Existing regulations are realized: single continuous staircases with
frequently tightened through additional widths of 150 cm, 200 cm or 250 cm; linked
requirements placed on the event organiser. continuous staircases of any width as a sin-
gle continuous staircase sequence; dog-leg-
PERI UP Public meets the following require- ged staircases as well as staircase towers
ments: the stair system has been designed with and without stair wells.
for live loads up to 7.50 kN/m² and the
guardrails for loads up to 2.00 kN/m to fulfil The steel decking can be installed on both
the highest safety regulations. In addition, sides of the stair stringers so that stairways
the geometrical requirements with regard of any width can be erected.
to the ratio of rise and tread, safety barriers
and climbing over guardrails are also met,
likewise vandal-proof requirements.
A free-standing public staircase with a viewing Construction as a stair tower with intermediate
platform at a height of 15 m. landings.
Solution for a trade fair: a stairway leading to a PERI Public as a stair tower inside a church which
pedestrian bridge complete with separate and areas serves as an emergency stairway in case the
of different widths for climbing up and down. electrically-operated elevator breaks down.
64
UDS - UHD
65
Examples of completed projects
66
68 Building Construction
80 Cultural Buildings
92 Transport Engineering
67
Central Railway Station, Wiesbaden, Germany
Mobile platforms for shed roof renovation during on-going daily
operations
Contractor
ARGE Instandsetzung Hallendach
Rainer Morawietz, Project Manager Hauptbahnhof Wiesbaden:
Metin Kizmaz, Site Supervisor Ed. Züblin AG / Eiffel Germany
Stahltechnologie GmbH
Scaffold Contractor
“This here is a project that falls outside of any stand- Gerüstbau Paul GmbH, Frankfurt a. M.
ard scaffold frame undertaking. In spite of the Field Service
uniqueness of the PERI solution with the mobile plat- PERI GmbH Germany, Düsseldorf,
Frankfurt and Weissenhorn Offices
forms, everything worked smoothly.”
On the basis of the PERI solution featuring entire refurbishment work as the railway Bridging the retail outlets and kiosks was
transversely and longitudinally movable tracks in the section to be renovated were realized using system components. Shear
working and safety platforms, refurbish- covered by a PERI protective roof construc- frames were formed that were adapted to
ment work for the glass roofing on the five- tion. suit the local conditions. Integrated HDT
span train shed was carried out very quickly Main Beams taken from the HD 200
and without significant interference to rail Mobile platform units minimized the time Heavy-Duty System carried the loads –
operations and passenger movements required for moving to the next phase. For even from large spans of up to 10 metres –
throughout the station. Thanks to the mutu- the planning of the PERI UP load-carrying and reliably transferred these into the PERI
ally supportive cooperation from the plan- system, not only were the rail tracks to be UP supporting structure. For accommodat-
ning phase onwards between the ARGE kept open but suitable walkways for pedes- ing corresponding load concentrations, the
partners, scaffolding contractor and PERI trians with sufficient width of passage also scaffold legs could be bundled together by
engineers, all specified deadlines were met. had to be taken into consideration. In addi- means of short 25 cm ledgers.
The use of standardized, rentable system tion to the vertical loads, the scaffold
components from the extensive scaffolding sub-structure also carried all horizontal
and formwork product ranges also played loads from the platform. Anchoring to the
an important role here. steel components which were to be refur-
bished was not possible due to structural
The 17.50 m to 25.50 m wide glass-steel reasons. Safe access was provided by 75 cm
roof constructions of the five listed, 195 m wide aluminium and 1.00 m wide steel stairs
long platform halls were replaced section respectively of the PERI UP scaffolding sys-
by section. Normal station operations tem.
remained virtually unaffected during the
The 190 m long protective roof construction straddled Manoeuvring at a height of 7 m: moving the platforms
the rail tracks with spans ranging between 7.50 m and both transversely and longitudinally was carried out on
12.50 m – this meant that the refurbishment work on rails whilst being secured on the sides at all times. The ... where they were easily moved by hand in a longitudi-
the hall roofs could be carried out without affecting train units moved sideways on roller blocks from the newly nal direction by means of a trolley on steel walers to the
schedules and passenger movements. renovated hall into the next ... next place of operations.
68
Building Construction
69
Haramain High-Speed Rail Link Phase 1, KAEC Station,
Saudi Arabia
Wide-spanned platforms for safe working conditions
The Haramain high-speed rail link connects work required on the roof, large-sized safe the PERI UP Flex modular scaffolding sys-
the Muslim holy cities while reaching a total working platforms had to be installed at tem. Thanks to the integrated moving devic-
length of around 450 km. Integrated in the heights of over 18 m. Top priority was es, the platforms were easily shifted to the
project is a separate line to the King Abdu- ensuring the safety of the many teams next work section by hand in each case.
laziz International Airport (KAIA). The dou- working on the construction site, because a
ble-track, electrified line primarily serves to wide range of building work was being car- The circumferential anti-fall protection and
ensure the fast and safe transport of pil- ried out in parallel which included, among continuous guardrails ensured safe working
grims whereby up to 160.000 passengers other things, all mechanical and electrical conditions. In addition, the system decking
will be transported per day in the future. work for train operations. provided completely closed surface areas
Operator of the rail link is the Saudi Railway so that no objects could fall to the ground
Organization. For this, PERI engineers developed a and workers under the working platforms
mobile solution on the basis of the LGS Lat- were protected at all times. Safe working
Phase 1 featured a wide range of excava- tice Girder System. With the scaffolding operations and easy handling due to the
tion work as well as several stations – system, lattice girder supporting structures low component weights accelerated all pro-
including the King Abdullah Economic City with 28 m spans were realized. Due to the cesses on the jobsite. The fact that the
transit station complete with restaurants, low weight of the individual components, entire scaffolding solution could be realized
mosques, parking facilities and various larger units could be pre-assembled on the with rentable PERI UP system components
retail areas. ground by hand and then lifted into the final additionally enhanced the cost-effective-
position with the crane. The over 18 m high ness of the solution.
One particular challenge was the construc- supporting construction included integrated
tion of the station roofs with large spans access to all working areas and was erect-
and the special arched architecture. For the ed using system components taken from
70
Building Construction
Contractor
El-Seif Engineering & Contracting Co.
Construction Site Support
PERI Saudi Arabia
Jeremy Thorpe
Project Manager
71
Technology Centre, Falkenberg School, Sweden
Protective roof, load-bearing system and facade scaffolding
rolled into one
Kjell Andersson
Site Manager
Contractor
Tage & Söner, Halmstad
Field Service
PERIform Sverige AB, Halmstad
PERI GmbH Germany, Weissenhorn
26.70
Due to the flexible adaptability of the PERI on the facade and roof whilst the extensive area: wide access points on the longitudinal
UP modular scaffolding in combination with thermal protection measures also demand- sides allowed easy truck deliveries, RCS
system components taken from the PERI ed the highest quality of construction work. Climbing Rails served here as bridging gird-
programme, all requirements regarding the ers.
enclosure, accommodating the gantry crane With the help of the LGS Weather Protec-
and working scaffold for the insulation work tion Roof and the enclosure on the basis of Accommodating and transferring the loads
could be fulfilled with only one scaffold con- the PERI UP Flex modular scaffolding sys- from the crane track into the scaffold was
struction. tem, construction work throughout was pro- carried out via SRU steel walers. In order to
vided with full protection against external adapt the load-bearing system to handle the
The four-story NTC building (NTC = weather conditions. In addition, an impor- load concentrations, legs were bundled
Naturvetenskapligt och Tekniskt Centrum) tant element of the PERI solution was the together by means of 25 cm ledgers. RS
has an area of 3.500 m², and was designed integration of a gantry crane in the scaffold 1400 Push-Pull Props from the PERI prod-
and constructed as a passive house. Maxi- construction. Furthermore, the entire mate- uct portfolio stabilized the scaffold con-
mum use is made of solar and wind energy rial transport took place in the protected struction at spacings of 6 m.
72
Building Construction
PERI engineers took into account the integration of a The PERI complete housing construction was 51 m
The weather protection roof on the basis of the LGS gantry crane with a 10 t lifting capacity in their scaffold long, 34 m wide and 26 m high – ensuring high quality
Lattice Girder System had a span of 26.70 m. concept. of execution of all constructional measures.
73
“The Bow”, Calgary, Canada
Crescent-shaped scaffolding: PERI UP at its best
The direction of the decks can be changed within a scaf- The staircase meets high load and accessibility require- The Rosetts allow connections of up to 45° so that the
fold bay at any point which increases the flexibility of ments – with a permissible load of 3.0 kN/m² and 1.00 m scaffolding can be optimally adjusted to match the cres-
the system. wide stairways. cent-shaped atrium.
63.40
The 236 m high office tower, “The Bow”, is entire height of the building was requested.
shaped like a crescent and the most strik- One of the most important requirements to
ing feature of the building is the diagonal be fulfilled for all sub-contractors was to
arrangement of the steel support structure. ensure that the working platforms were as
A well thought-out PERI UP scaffolding con- close as possible to the complex steel
cept provided safe access and generous- structure. Here, the main beams ascended
ly-sized working platforms for all subse- at an angle of 76° whilst the front of the
quent sub-contractor work on the shell con- building is curved in the form of a crescent.
struction.
PERI UP Flex could be used extremely ver-
“The Bow” is the headquarters of the satilely. The metric grid dimensions along
22.70
EnCana Corporation, a company operating with the 25 cm and 37.5 cm decking widths
in the oil and gas industry. Not only does provided maximum flexibility and the Rosett
the office tower feature an extraordinary nodes allowed connecting possibilities in all
design but also the building concept which directions. This flexibility and high load-bear-
was tailored to meet the needs of the ing capacity with only a small number of
23.20
employees. Shape and orientation of the diagonals made the scaffold solution quick
building have also been ideally adapted to and cost-effective. For work on the steel
suit the local climatic conditions: a glass construction, the diagonally-positioned pro-
atrium extends in a south-westerly direction files had to be accessible from all sides.
over the entire building height whilst an With bracket cantilevers and the use of cor-
236.00
intelligent energy concept ensures opti- ner plates for the inside corners, the work-
23.20
mum utilization of solar energy and mini- ing areas could be adapted with maximum
mum energy consumption. effect to match the steel components. In
addition, adapting to the complex structure
For painting as well as mounting of the fire was achieved by changing the direction of
protection cladding, insulation and installa- the decking: the span direction of the decks
tion of the piping system, the PERI UP scaf- could be changed within a scaffold bay at
fold solution fulfilled a wide range of any point – several times if required.
requirements regarding working area
dimensions and potential loads for the work
22.50
74
Building Construction
Duncan McMillan
Senior Construction Manager
Contractor
Ledcor Construction Company, Calgary
Architect
Foster & Partner, London
Field Service
PERI Formwork Systems, Inc. Canada, Calgary
75
CIS/Interporto di Nola Service Centre, Naples, Italy
Flexible shoring for a complicated structural form
The shoring towers comprised of PERI UP Due to the accurately designed formwork slab surfaces. For forming the massive rein-
Rosett with grid dimensions of mostly and easy to install individual components, forced concrete walls with a range of differ-
2.00 m x 1.50 m and were connected by site crews were able to assemble the scaf- ent heights, TRIO panel formwork with only
means of system parts to form a spatial folding and formwork within a very short a minimum of individual components
load-bearing construction. These were of time. Neatly-arranged storage with PERI proved to be particularly advantageous.
varying heights reaching up to 38 m in the storage pallets ensured fast material access
centre. and saved space on the construction site.
For crane-independent dismantling in par-
The modular structure of the PERI UP sys- ticular, fast working operations could be
tem allowed assembly on different erection achieved with the lightweight PERI UP
area surfaces. Both vertical and inclined system components.
reinforced concrete columns could then be
easily accommodated without any difficulty. For shuttering the floor slabs in the lower
The continuously changing angle of inclina- levels, lightweight aluminium SKYDECK
tion, and adapting the load-bearing columns panel slab formwork with its drophead sys-
with appropriate auxiliary support on the tem was selected to ensure fast striking.
slab underside, were already taken into The panel grid of the SKYDECK system was
consideration during the planning phase. used as a design element for the visible
Geom.
Oronzo Rampino
Site Manager
Contractor
Vesuvio S.c.a.r.l., Nola
Field Service
PERI Rome, Italy
76
Building Construction
Architect Renzo Piano was inspired by the form of the Through the modular assembly, complicated geometries
nearby volcano, the world famous Vesuvius. Numerous could also be cost-effectively scaffolded and existing col- The lightweight individual components could be quickly
restaurants, cinemas and conference halls as well as a umns could be accommodated without any problems. and easily assembled. In particular, when dismantling
shopping centre and a hotel, are located around the cen- Well-organised storage ensured fast access to materials without any crane support this was a big advantage and
trally-positioned “crater” which has a diameter of 160 m. and reduced stacking and transportation volumes. ensured fast construction progress.
77
New Surgery Clinic, Ulm, Germany
Easy-to-assemble, extremely high load-bearing shoring
constructions
78
Building Construction
The PERI UP Rosett shoring system solution served for 190 m long, 170 m wide and 25 m high – 150 highly- structural work was completed on time. The topping-out
temporarily transferring the loads of the main building motivated construction workers and a customised PERI ceremony was held in April 2010.
complex over a height of 16 m via the base construction. formwork and scaffolding solution ensured that the
The new University of Ulm clinical centre Up to the point when the final storey was
consists of a finger-like base construction completed and the building´s inherent sta- Dirk Brandt
on which a three-storey building is arranged bility had been reached, over 30 kN/m² of General Foreman
like a magistrale. surface loads had to be taken into consider-
On a total area of 30.000 m², the complex ation. For this, PERI engineers planned cor-
has a total of 235 beds and 17 operating responding shoring towers complete with
theatres. additional frames. In addition, the braced
shoring towers were extended to 1.50 m
Supplementing the comprehensive form- base widths in each case with respective “After a short briefing by the PERI super-
work solution comprised of TRIO, RAPID, additional frames – and optimally adapted visor, the PERI UP shoring towers could
FTF and SKYDECK for walls, columns and to the existing geometry and expected be assembled in no time at all. It was
slabs, was the 16-leg and more PERI UP loads by means of 25, 50 cm and 75 cm also an advantage regarding the handling
shoring towers which ensured fast con- ledgers. and work preparation that we only had
struction progress. These temporarily trans- one partner for both the formwork and
ferred the loads of the 165 m long main scaffolding operations.”
building at heights of between 6.80 m and
16.05 m safely downwards.
Completely pre-assem-
bled on the erection area,
11.57
16.76
79
Henninger Turm, Frankfurt am Main, Germany
Safe demolition operations with the PERI modular
design principle
80
Cultural Buildings
Frankfurt Skyline
Six of the 18 high-rise buildings which
could be visited during the Frankfurt Sky-
scraper Festival were realized using PERI
formwork and scaffolding solutions.
81
Toskana Thermal Baths, Bad Orb, Germany
Thermal bath and roof formed to perfection
Contractor
Industriebau Wernigerode GmbH, Wernigerode, Germany
Roof Construction
Hess Wohnwerk GmbH & Co. KG, Kleinheubach, Germany
Field Service
PERI Berlin, Frankfurt and Weissenhorn, Germany
82
Cultural Buildings
The very unusual timber roof construction spans the thermal bath complex, complete with an 800 m²
expanse of water, like a wave and rests on only eight bearing points. Its assembly, with the help of
PERI UP shoring and working scaffold, took place approximately at the same time as the structural
and finishing work.
83
Edificio Ágora, Valencia, Spain
Elegant sculpture in flexible scaffolding
Carlos Gil
Project Manager
49 vaulted steel fins are arranged according months, a particularly fast solution was
to an elliptical floor plan and span a gigantic required.
interior measuring 100 m long, 65 m wide
and 68 m high. For assembly work of the For assembling the load-bearing building
68.00
84
Cultural Buildings
The PERI UP Flex modular scaffolding provided working Flexibility, high load-bearing capacity and wide cantile-
platforms and access for all construction activities. The vers with, nevertheless, a minimum number of diago-
complex building construction and the utilization for a nals, made the PERI UP solution both quick and cost-ef-
wide range of activities determined the degree of diffi- fective.
culty for this project.
of the scaffold could be perfectly adapted ly assembled scaffold sections, decks could Contractor
U.T.E. Ágora, Valencia
to the complex building structure. For sub- also be subsequently removed and re-in- Augescón S. L., Corvera de Asturias
sequent working activities, scaffold use stalled without any problems – a big advan-
was limited to the inside area: the wide tage regarding continuous adaption of the Lindner AG, Arnstorf
Architect
cantilevers were reduced in size to a large scaffold. The low weight of the individual Santiago Calatrava
extent so that external facade, insulation PERI UP system components and the fact Field Service
and the curtain wall construction could be that each system component could be han- PERI Valencia, Spain
installed. dled by only one person, facilitated fast and
energy-saving work operations. In addition,
PERI UP stairs provided safe access to the the high rigidity of the standard connec-
working areas and, through the use of UDI tions reduced the number of both bracing
industrial decking, working platforms and levels and required diagonals. This ensured
access ways were installed throughout short assembly times and fast modification
without leaving any gaps. Even in complete- phases which noticeably accelerated con-
struction progress.
85
St. Peter’s Basilica, Rome, Italy
Uninterrupted church services during dome restoration
86
Cultural Buildings
The mosaics on the St. Pius Dome had to girders and PERI UP Rosett standard com-
Luigi Vivian undergo extensive restoration. While the ponents formed the basic structure of the
Purchasing Manager work was being carried out, free and unhin- platform. From here, followed the assembly
dered access for all visitors had to be guar- with UBK node braces in the form of a can-
anteed. tilevered construction. Above the working
platform, PERI UP Rosett scaffold units pro-
Using PERI UP Rosett, a 124 m² working vided safe access right up to the lantern in
platform was created within one week the dome. Equipped with decks complete
“It was tremendously difficult to adapt which seemed to float over the space with integrated ladders, climbing up and
the platform to the geometry of the below at a height of 28 m. This provided the down was extremely easy.
building at this height. The system had best working conditions above for the res-
to be flexible but also easy to install. toration work and ensured safe and undis- For the erection of the working platform,
After carrying out a detailed review, turbed activities in the church down below. assembly of temporary falsework was first
we were convinced that the PERI UP The restoration team was able to access carried out which served as an interim stor-
solution fulfilled all requirements.” the platform from the outside of the dome age facility and means of access until the
via large window openings. final positioning of the platform. Due to the
high PERI UP Rosett node rigidity, addition-
For the platform, PERI engineers designed an al anchorage or support for the church build-
efficient solution using self-supporting LGS ing itself was not required.
lattice girders with spans of over 17.50 m.
The skylights of the four large windows on
the elliptical-shaped dome could be used as
points of support. The combination of LGS
Client
Astaldi S.p.A., Rome
Field Service
PERI Basiano, Italy
7.54
25
25
25
25
87
Hotel Marques de Riscal, Elciego, Spain
Optimal adjustment to very unusual building geometry
SRZ steel walers and GT 24 lattice girders as sub-con- On the basis of a 2 x 2 m scaffold grid, the PERI UP The PERI UP Rosett modular scaffolding allowed optimal
struction for forming the massive and twisting rein- decking provided safe and load-bearing working areas adjustment to the complicated building geometry.
forced concrete slab. PERI UP Rosett was used as for assembly crews at all heights.
shoring.
88
Cultural Buildings
Contractor
Ferrovial, Madrid (Shell), Umaran S. Coop., Barakaldo
(Roof and Facade)
Field Service
PERI Madrid, Spain
89
Rock Face Stabilisation, Cara del Moro, Alicante, Spain
Perfect adaptation provides maximum safety levels
Erosion at an advanced stage on Mount rock and, on the other, as a stable platform
Benacantil and the associated risk of falling for storing materials. Transferring the verti- Miguel Barranco
rocks meant that extensive stabilization cal and horizontal loads took place using Site Manager
measures were required. For this, PERI ledger braces and corresponding scaffold
planned and supplied a scaffold solution widenings in a lateral direction which was
with working platforms which allowed for supplemented by RS 1000 push-pull props
safe working conditions to all areas. An taken from the PERI formwork programme.
important consideration was that for scaf- The working platforms for the injection
fold bracing purposes, the cliff itself could work nestled up against the cliff face which “It was clear to me that the project´s
not be used for transferring loads, e.g. via was to be renovated. While the sub-struc- success depended directly on a good,
rock anchors. ture was based as far as possible on a flexible and reliable technical solution
2.50 m x 2.50 m basic grid, PERI UP which, in fact, the PERI UP scaffolding
The PERI UP scaffold construction had an allowed for 50 cm and 75 cm horizontal system provided us.”
impressive overall height of 70 m which adjustments to be made to match the natu-
included the access to the castle. A 35 m ral geometry. Particularly advantageous and
long and up to 6 m wide intermediate level safe was the fact that the UDI industrial
at a height of 30 m served, on the one decking continued this adaptability with
hand, as easy and convenient access to the completely closed surface areas.
37.00 Contractor
Geocisa, Madrid
Field Service
PERI Valencia, Spain
90
Cultural Buildings
The PERI UP stair towers also allowed direct access to Through the PERI UP metric grid arrangement, scaffold PERI UP Flex provided safe assembly platforms at all
the castle buildings. bays could be perfectly adapted to the natural features. heights as well as convenient stair access.
Additional safety was provided by the end-to-end guard-
rails and closed surface areas with flexible UDI decking.
91
Aristóteles Parra
Project Manager
92
Puente Ejército, Lima, Peru Transport Engineering
For assembling the steel arched bridge, PERI engineers created an assembly scaf- mentation planning and static calculations,
PERI UP served as shoring and working fold on the basis of the PERI UP scaffolding the stability of the structure could be exten-
scaffold at the same time. In addition, an system. This served as a temporary, up to sively verified which led to shorter set-up
important element of the scaffolding struc- 20 m high support structure for the steel times. The high flexibility of the PERI UP
ture was the load-bearing capacity and load segments as well as a working platform for system enhanced safety conditions for the
transfer into the sub-structure using system the final assembly. Each arch consisted of steel erectors and accelerated their work
components. 11 steel segments and had a total weight of procedures. The different working levels
100 t. A big advantage for the design of the were continuously connected in a longitudi-
Two 105 m long steel arched bridges con- shoring towers and working levels was the nal direction by means of system steel
nect the northern district to the city centre high load-bearing capacity and, in particular, decks with side protection ensured through
of the Peruvian capital. These were posi- the adaptability of the PERI UP Flex. Fur- the use of ledgers. Due to the system grid
tioned to the left and right of the 50-year thermore, system components from the of 25 cm or 50 cm, all adjustments can be
old existing bridge in order to better man- PERI product portfolio supplemented the carried out without any time-consuming
age the high volume of traffic through the scaffolding structure: through the use of tube and coupler connections; in particular,
expansion to 10 lanes as well as being able GT 24 formwork girders and SRU steel wal- the self-securing ledger assembly with the
to accelerate the public transport system as ers, the load distribution was also systema- Gravity Lock also increased the level of
a whole. tized. As an integral part of the PERI imple- working safety for the scaffold assemblers.
Contractor
COSEI Consorcio, Fiansa
Field Service
PERI Peruana SAC, Lima
23.20
The PERI UP Flex modular scaffolding precisely matched the bridge geometry thanks Through the combination of PERI UP and Scaffolding and bridge assembly went
to the system-integrated flexibility – without any time-consuming tube and coupler system components of the formwork hand in hand – with fast working speeds
assembly. programme, loads could be reliably trans- and maximum level of safety.
ferred.
93
Wümme Bridge, Ritterhude, Germany
LGS Lattice Girder System
Mobile working platforms with 20 m spans
The 110 m long crossing over the River 3 m tidal range; in addition, the complete Contractor
Schälerbau Berlin,
Wümme is in the form of a steel composite underside of the bridge was accessible at all Branch Office of August Reiners
bridge. With two vehicle lanes along with times with the help of the LGS platform – Bauunternehmung GmbH, Bremen
footpaths and cycle paths on both sides, above the surface of the water and edge Field Service
PERI Berlin and Weissenhorn, Germany
the bridge cross-section has a width of sections on the river banks.
almost 20 m.
For shuttering and striking operations as The superstructure was widened for the
well as for drainage, corrosion protection realization of a viewing platform in the cen-
and inspection work, the construction team tre of the bridge. In order to cover this area
used two mobile working platforms on the as well, the scaffolding solution developed
basis of the LGS lattice girder system. A by the PERI engineers featured a mobile
pontoon solution was not considered due to transverse platform which could be support-
the forever-changing current conditions and ed between the LGS platforms.
The 22 m long and 3 m wide platform could easily be For their project solution, PERI engineers combined The LGS lattice girder solution featured spans of over
moved by hand to the next section. PERI UP modular scaffolding with LGS lattice girders – 20 m, and was coordinated with the local Waterways
as well as system components from the PERI rental park. and Shipping Authority. It accelerated work operations
under the bridge and made it independent of current
conditions and water level.
Alexander Krölls
Site Manager 19.90
Modular system for large spans and high loads: LGS lattice girders connected to PERI UP Flex
standard components allows safe and efficient solutions as well as a wide range of application
possibilities.
94
Transport Engineering
95
State Garden Show, Villingen Schwenningen, Germany
Temporary pedestrian bridge connects exhibition areas
96
Transport Engineering
Client
Landesgartenschau Villingen-Schwenningen 2010 GmbH
Field Service
PERI Weissenhorn, Germany
Through the use of a temporary pedestrian safely pre-assembled on the ground with without intermediate railings. The road to
bridge consisting of LGS truss girders and UH ledgers and UBL ledger braces. A be bridged had a clear width of 12 m
Public stairways, visitors to the garden mobile crane placed the two units on the between the two supports with 2.50 m for
show were able to access two areas with- previously installed PERI UP support struc- the parallel positioned pavements and cycle
out having to cross a very busy road. ture; subsequently, these were coupled lanes underneath the stair sub-structure.
Together with the client and local authori- together by means of short 25 cm ledgers
ties, various road crossing options were and the surface area fitted with UDS steel
prepared during an early initial planning decks. This minimized crane time and the
phase. Due to the planning expertise of the duration of the required road closure.
PERI engineers and the flexibility of the
PERI UP modular construction system, an The stairway access at both ends – including
optimal scaffolding solution could therefore the required intermediate landings and corre-
be reached for all those involved in the pro- sponding to the valid safety regulations –
ject. was divided into two 1.50 m wide flights of
stairs separated by guardrails. The complete
The bridge superstructure consisted of two width of the 15 m long and 3.25 m wide
LGS truss segments which was easily and pedestrian footbridge could be fully utilised
... and subsequently positioned on the support structure Using the southern, stairway access which had already Public stairs and the LGS bridge fulfil the highest safety
with the mobile crane. For this, the main road was only been installed, the steel decking for the pedestrian foot- requirements – both structurally as well as geometrically.
closed to traffic for a short time in the late evening. bridge was fitted during the time the road was closed.
97
Motorway Bridge near Grudziądz, Poland
Shortened construction time and high quality assured with the
LGS Weather Protection Roof
The foreland bridge of the new Vistula river feature because when operations started in In order to facilitate unhindered material
crossing was realized using the incremental November, temperatures reaching minus installation and placing of concrete, the
launching method whereby the prefabrica- 25° C were expected. Altogether, the con- construction allowed the protection roofs to
tion of the individual repetitive bridge sec- struction team used four roof constructions: be moved – over the reinforcement tents.
tions was carried out with stationary form- two smaller, permanently installed tents The lattice girder supports were equipped
work. Two separate box girder profile super- served as reinforcement preparation; two with rails and, with lengths of 55.50 m,
structures, each 556 m long, were to be movable protection roofs on basis of the were twice as long as the protection roofs.
constructed in 25 cycles with standard LGS lattice girder system spanned the The smooth-running trolleys used allowed
cycle lengths of 24 m and then connected formwork and concreting area. With Keder moving the roofs in the longitudinal direc-
to each other using tension cables after the tracks and sheeting, the scaffold construc- tion while requiring only two to four per-
moving procedure had been completed. tions were very light and included translu- sons – without the use of any aids.
cent roofs. The solution in Grudziądz also
The temporary, largely rentable protection featured side and gable sheeting. Overlap-
roof construction on the basis of the PERI ping of the sheeting at all joints ensured a
UP modular scaffolding spanned the pro- tightly-fitting enclosure which at the same
duction area and allowed weather-independ- time could easily be opened. During extreme
ent fabrication of the individual sections for temperatures, the temporary tents were also
the superstructure. This was an important heated.
For reinforcement and concreting operations, the weather protection Roofing for the scaffold construction was realized by means of a Keder system. The
roof was moved over the permanently installed reinforcement tent. All retracted sheeting offered the best protection against wind and weather while the
required materials could be lifted with the crane without any problems. light transmission made permanent artificial lighting unnecessary.
98
Transport Engineering
Two movable LGS weather protection roofs spanned the two sets of
incremental launching equipment used for the construction of the
bridge superstructure. They provided sheltered working areas and guar-
anteed continuous work operations also in winter as well as best con-
crete quality.
Dariusz Daniluk
Site Manager
The LGS roof segments could easily be moved by hand The URW wheel allowed moving to be caried
and were also equipped with brakes. This ensured a fast out in a longitudinal direction, at the same
moving procedure. time a horizontal sliding support was integrat-
ed at the level of the girder.
99
Westfalen Power Plant, Hamm, Germany
High level of safety for assembly and use
100
Industrial Structures
Zbigniew Zoń
Site Manager
During the assembly work as part of the modular scaffolding system. Thus, one
new power plant development, PERI UP externally-mounted working scaffold with
Flex proved to be extremely adaptable – integrated 75 cm flights of stairs was used
and thus fulfilled the highest requirements for the final assembly of the eight inlet
regarding the working platforms which ducts. The scaffold solution could be opti-
were to be installed. Given that the modular mally adjusted in a metric grid arrangement
scaffold was mounted with the guardrail in to suit the up to 4.50 m canterlevered fun-
advance, required safety levels for the scaf- nel shape – suspended in part on a scaffold
folding assembly team was provided to a construction comprised of PERI UP system
very high degree. components.
With the two new D and E blocks, the The PERI UP system grid was particularly
Westfalen power plant increased its capaci- advantageous for the spatial scaffolding of
ty by 1,600 MW. The high efficiency and the funnel filter: scaffold bays could be hori-
extremely effective filter and purification zontally and vertically divided almost arbi-
facilities make the coal-fired power plant in trarily with the help of standard compo-
Hamm the most modern in the world. As nents. As a result, the bay lengths of the With the PERI UP Flex system grid, the steel construc-
tion could be modified as well as achieving optimum
the upgrading plant was to be fully integrat- lower sections could be generously-dimen- adjustment to suit the filter funnel.
ed into the existing site, all construction sioned for easy access and with a minimum
and installation work had to be carefully use of materials. In the area of those rele-
coordinated to match ongoing power plant vant components with geometrical adapta-
operations. tion, 300 cm scaffold bays, for example,
were divided into three sections of 75 cm,
On the two 64 m long and 35 m high elec- 150 cm and 75 cm widths, so that construc-
trostatic precipitators for flue gas desul- tion could continue upwards with reduced
phurization, access for the welding and bay widths.
insulation work was realized with the help
of working platforms from the PERI UP Flex
Client
RWE Generation SE, Hamm
General Contractor Flue Gas Purification
Hitachi Power Europe GmbH, Duisburg The insulation work on the 35 m high outer sides also
Insulation Work required a safe working scaffold as well as stair access -
Kaefer SA, Polaniec, Poland adapted to match the steel construction. The modular
Field Service scaffolding assembly was carried out extremely safely
PERI Poland Sp. z o.o., , Plochocin with the guardrail in advance which meant rope protec-
PERI GmbH Germany, Weissenhorn tion was not required.
101
Dedusting System for Blast Furnace 9, ThyssenKrupp Steel
Europe, Duisburg, Germany
Scaffolding and formwork: 2 systems – 1 grid dimension
After undergoing extensive modernization scaffold bays could be easily and quickly
measures, blast furnace 9 has recently assembled by means of UBK node braces. Heiko Neie
become operational again. Part of the over- Supervisor:
haul operations included the re-insulation of Outwardly visible but fully integrated into
the casting bay dust extraction facilities by the scaffolding solution was the load-bear-
the Leuna-based Intering GmbH’s team of ing intermediate level consisting of
insulation experts. For this, PERI UP Flex VARIOKIT system components at a height
modular scaffolding provided optimal work- of 12 m. As a result, the plant components
ing conditions for all insulation work as the positioned above the non-supporting flat “With PERI UP Flex, the most suitable
high level of flexibility allowed virtually any roof could also be accessed. The loads grid dimensions can always be realized
adjustments to be made – this resulted in from the up to 5 additional scaffolding and it is 100 % compatible with other
completely safe working platforms. levels were thus transferred to the outer PERI system components. And the
scaffolding which likewise served as work integrated protection against lifting in
In the PERI scaffolding solution, integrated scaffolding and shoring. the steel decks fully complies our high
stair towers with 75 cm wide aluminum safety requirements.”
flights of stairs ensured safe and fast
access to all levels. Inwardly cantilevered
102
Industrial Structures
Scaffolding Contractor
Intering GmbH, Scaffolding Department, Leuna
Field Service
PERI Leipzig
103
Contractor
JSC Litana ir Ko, Gargždai
Field Service
The waste collection bunker and steel hall of the mod- PERI UAB Litauen, Vilnius
ern waste incineration plant are 54 m high. PERI GmbH Germany, Weissenhorn
Dmitrij Cariov
Site Manager
104
Waste Incineration Plant, Klaipeda, Lithuania Industrial Structures
The PERI scaffolding solution, complete The 31 m long and only 7.50 m wide plat- featured an 8 m cantilever on this side; as a
with a movable working platform in a longi- form with integrated wheel units was sup- result, the span between the rails was
tudinal direction, reduced material costs ported on aluminium rails and could be 22.30 m.
and saved time. The compatibility with rent- moved by hand in a longitudinal direction to
able system components taken from the the next section. Compared to a flat scaf- An important element of the PERI scaffold-
extensive PERI product range increased the folding construction, time and material ing solution were the system components
cost-effectiveness and safety levels at the requirements could therefore be significant- taken from the extensive formwork portfo-
same time. ly reduced. LGS girder segments were con- lio. The use of SRU steel walers and RCS
nected by means of 150 cm ledgers, which climbing rails in the scaffold sub-structure
The waste incineration plant in Klaipeda is had been pre-assembled on the ground and as well as anchors from the brace frame
the first thermal waste utilization facility in then raised into position by crane. Due to programme avoided any on-site temporary
the Baltic States and is regarded as a pilot the limited load-bearing capacities of the solutions and was also very cost-effective
project. With a 50 MW heat and 20 MW ground on one side of the hall, the platform due to the rentable components.
power output respectively, it covers almost
half the urban thermal energy require-
ments. In addition, the recycling capacity of 22.30 8.00
approx. 240,000 t/a household and industri-
al waste as well as biomass, makes a signif-
icant contribution for easing the burden on
landfill sites in the region.
The working platform – based on the LGS lattice girder The scaffold sub-structure serves as support for the rails
system – was supported on wheels and moved by hand and as working scaffold for the wall-side indoor hall With the help of rentable system components, such as
to the place of assembly. assembly. the RCS climbing rails, large spans could be bridged.
105
Biocel Pulp Mill, Paskov, Czech Republic
Systematic adaptation for completely safe working conditions
With the help of the PERI UP Flex modular foreign matter. Therefore, the scaffold con-
scaffolding, the working platforms could be struction was realized without anchors and
optimally adapted to suit the silo structural pressure supports, and was also provided
components – without anchors and pres- with temporary roofing. Due to its metric
sure supports. As a result, all welding, coat- system grid, the PERI UP Flex modular
ing and installation work could be carried scaffolding allowed bay lengths between
out safely and according to the required 1.50 m and 3.00 m and bay widths of
level of quality. 0.75 m to 1.50 m to be combined with
Radim Sýkora each other in 50 cm and 25 cm increments
Managing Director The pulp mill in the Czech town of Paskov respectively. The adaptability provided by
has expanded and modernized its produc- means of internal brackets and steel deck-
“The silos and the technical equip- tion facilities. The special pulp produced ing mounted in chess board fashion meant
ment with the countless number of there is an important raw material for fur- that all working areas were optimally acces-
pipes in particular presented an enor- ther processing into high-quality cellulose sible and a high level of safety was ensured
mous challenge for the scaffolding fibre products. For this, five 13 m high circu- when the scaffolding was used.
work. With PERI UP, we managed to lar steel tanks were erected which featured
provide a scaffolding construction to diameters of varying dimensions. PERI UP In addition, especially advantageous was
the complete satisfaction of our cus- scaffolding provided safe and comfortable the fact that individual decks could be
tomer.” working conditions for the complex welding removed at any time and installed in anoth-
and coating work. er position. As a result, the scaffolding
could be subsequently self-adapted for any
For a long-lasting coating, the surfaces unforeseen technical installation work –
were not under any circumstances to be without complex scaffold assembly and
soiled or brought into contact with any whilst maintaining the high level of safety.
Scaffolding Contractor
Scaffmont s.r.o., Ostrava
Field Service
PERI spol. s r.o., Czech Republic, Jesenice and Prahy
43.25
Ø
7.50
5.
5.
10
Modular adaptation: ledgers could be installed in almost Completely safe working conditions: work could be car- Short distances: the access technology was integrated
any combination and the decks mounted in a chess ried out quickly and safely on completely covered work- into the scaffolding construction – with the help of 75 cm
board fashion. ing levels with non-slip surfaces. wide aluminum stairways.
106
Industrial Structures
107
Mugardos LNG Regasification Terminal, La Coruña, Spain
Flexible and adaptable scaffolding for industrial structures
LNG stands for liquefied natural gas. The volume of the cient. However, the insulation and installation technolo-
natural gas can be reduced through liquefaction to gy required is both complex and expensive as the tem-
approximately two parts per thousand of the original perature difference between inside and outside can be
state. Thus storage and transportation over long distanc- anything up to 200°.
es where pipelines do not exist is much more cost-effi-
108
Industrial Structures
In the north-west of Spain, TGE Gas Engi- A free-standing stair tower with access
Pedro Gomes neering was commissioned to erect two liq- bridge served as entrance to the construc-
Site Manager uid gas tanks (LNG) with a total capacity of tion site. With the PERI UP modular scaf-
150,000 m³ for the Reganosa utility compa- folding system and only a minimum of sup-
ny. The structures each have 80 m diame- plementary components for the heavy-duty
ters and an overall height of more than 50 stairway, the 12 m difference in height
metres. PERI Spain provided a cost-effec- could be cost-effectively bridged. The 1 m
tive formwork and scaffold solution for the flight width along with the comfortable rise-
“PERI UP is easily installed and can be structural work as well as the installation of to-tread ratio, ensured safe and quick
adapted to suit a wide range of situa- an extensive range of technical equipment. access for site personnel. The stairs were
tions. Through the quick assembly pro- designed for a permissible load of 3 kN/m².
cess, we could save both time and PERI UP Flex industrial scaffolding was
money. For me, PERI UP is the best used for the installation work as the system PERI UP Flex industrial scaffolding combines
and safest scaffold system on the mar- is extremely flexible, adaptable and mul- the flexibility of time-consuming tube and
ket.” ti-functional. For the exteriors of the con- coupler scaffold with the assembly advantag-
tainers, 8 m wide and 50 m high Rosett 75 es of system scaffolding. The 25 cm metric
facade scaffold provided safe working con- grid dimensions allow simple and easy
ditions allowing fast installation of the cable adjustments to be carried out on complicated
and wiring systems. On the inside, too, var- structural geometries. This means danger-
ious facade scaffolding units and working ous gaps in the decking are reduced to an
platforms accelerated the required insula- absolute minimum and safety levels are
tion work. considerably increased for installation and
maintenance work.
Contractor
TGE Gas Engineering GmbH, Mugardos
Field Service
PERI La Coruña, Spain
109
380 KW Overhead Power Lines, Krümmel-Görres, Schwerin, Germany
Lightweight system components for a high level of protection
110
Industrial Structures
20.00
30.00
Near Schwerin, the cables of the 66 km The assembly of 3 m standards at the base
long overhead power lines between the ensured that in all of the following 2 m
Görries (Schwerin) and Krümmel (near bays, the standards always increased the
Hamburg) sub-stations had to be replaced. level of safety during erection due to their
At the intersection point with other over- functioning as guardrail posts in advance.
head lines, safety nets had to be installed Working with personal protective equip-
at a height of around 20 m in order to pro- ment such as helmet and rope protection
tect the 110 KV lines running transversely was matter of course for the experienced
Franz-Joachim Stein underneath while replacement work was team of scaffolders.
Managing Director and being carried out. The span of the integrat-
Dieter Mandry ed safety nets reached 30 m in each case
Site Manager while the length of the two sets of safety
scaffolding measured 50 m.
“Through the low individual weights of
the PERI UP system components, we Two PERI UP scaffolding constructions
could assemble the safety scaffolding assembled opposite each other held the
extremely quickly. With 7 men, we supporting ropes of the nets. The highly
only needed 2 weeks for erecting both tear-resistant parafile ropes also served to
sets of safety scaffolding - including all brace the scaffolding and guaranteed the
bracing and nets.” stability during all load situations. GT 24
Formwork Girders were positioned on the
top head spindles and functioned as a sup-
port for the nets while also absorbing the
impact of the power lines in an emergency.
111
Waste Incineration Plant, Berlin, Germany
Versatile use of PERI UP for new and existing buildings
For construction of a new bunker as well as plant operations in any way and to carry out
refurbishment of an existing bunker at the the required work without interruption nor
Ruhleben waste incineration facility in Ber- risk of compromising quality standards, a
lin, PERI UP proved to be an extremely ver- temporary 27 m long LGS weather protec-
satile solution – as a load-bearing scaffold tion roof spanned each construction phase.
for the structural work of the new waste In the course of the refurbishment work,
and slag bunker along with a weather pro- this was moved forward on rails each time
tection roof and assembly platform required to the following section.
for the extensive renovation work of the
existing bunker roof while the plant was in Three of a total of twelve roof segments
operation. respectively were equipped with a PERI UP
platform which functioned both as working
In the interwoven new structure, among and, in particular, safety scaffold for con-
other things, intermediate slabs were to be struction operations. As a result, the roof
constructed at various levels and in several structure and skylights could be replaced
areas. For supporting the slab formwork, a step-by-step as well as carrying out the
spatial PERI UP supporting structure with re-coating of the remaining components –
heights of up to 22.50 m was used. Through with maximum possible safety and only
the metric grid design, the scaffold could minimum disruption of daily plant opera-
easily be adapted to suit the complex tions.
geometry as well as the transfer of a wide
range of high loads; in addition, the ground
contact areas on different levels required a
large degree of flexibility from the scaffold
system used.
3.01 3.44
7.52
23.06
3.27
5.82
112
Industrial Structures
Malcom Robinson
Supervisor for Structural Work
Frank Papajewski
Site Manager
Joachim van Mark
Supervisor for Roof and Truss Refur-
bishment
For fixing the rails to the existing parapet wall, a special Contractor
construction on a PERI system basis was designed. Matthäi Bauunternehmung GmbH & Co. KG,
Westerstede
Field Service
PERI Oldenburg and Weissenhorn, Germany
113
Harto Vallimägi
Site Manager
114
Tallinn Oceanographic Museum, Estonia Building Redevelopment
Due to the metric PERI UP basic grid dimensions, shor- The PERI UP Rosett scaffold nodes offer a wide range of Optimal working conditions at a height of almost 20 m
ing towers and stairways could be integrated into the connecting possibilities and provide very rigid node con- for carrying out the extensive refurbishment measures
birdcage scaffolding without any problems. nections with a high load-bearing capacity. on the underside of the dome.
One of the cultural highlights of Tallinn is a scaffold was based on metric grid dimen- with heights of 21 m. Here, the shoring
historical domed structure dating from the sions of 3.00 m by 3.00 m. In order to be towers were fully integrated into the spatial
time of the last Russian Czar which was able to optimally work on all areas of the working scaffold used for renovating the
converted into an attractive oceanographic underside of each dome, the PERI scaffold underside of the dome. In addition, a
museum. PERI UP was optimally adapted solution featured stepped working levels in light-duty aluminium stairway with alternat-
here to suit the geometry of the almost 50-cm increments – at heights of 11 m at ing staircase units was centrally positioned
100-year old reinforced concrete complex the corners and 19.50 m at the centre of in the working scaffold which ensured safe
and was used for a wide range of applica- the dome. For exact geometrical adjust- and easy access.
tions on both the interior and exterior. ments in the edge sections, the substruc-
ture was sub-divided in each case into two For the refurbishing work on the outer sides
The reinforced concrete renovation work on 1.50 m wide fields. In addition, cantilevers of the domed structure, PERI UP T 72
the self-supporting shell-shaped construc- were installed using standard node braces facade scaffolding was used. This provided
tion complete with three impressive thus providing 1.50 m extended platforms at a twofold level of safety: during the assem-
domes, without disturbing any intermediate both ends. bly sequence featuring the guardrail in
supports, was extremely time-consuming advance and utilization when fitting inside
and labour-intensive. The old reinforcement The ring beams of the lanterns, the opening guardrails without any accessories – a big
was exposed using an ultra-high pressure in the centre of the domes, were supported advantage as external walls were missing
cleaning device, corrosion protection was during the entire renovation operations with on the museum. Here, too, a stair tower
then applied, followed by injection work the help of PERI UP Rosett shoring towers. provided safe access to the roof and, when
along with replacement of any damaged These had grid dimensions of 1.50 m by necessary, to the respective scaffold levels.
reinforcing bars – all this in order to subse- 1.50 m and carried up to 40 kN per leg –
quently install an additional layer of rein-
forcement and a 50 mm thick shotcrete
covering. Safe working conditions also for the outside work: with PERI UP T 72 facade scaffolding complete with site
PERI UP T 72 frame scaffolding with internal guardrails access stair tower scaffold supplemented the compre-
and no additional components. hensive scaffold solution.
The domes had to be temporarily supported
so that overall stability could be maintained;
at the same time, the PERI UP scaffold sys-
tem served as a spatially adapted working
platform with integrated shoring and stair
access. The detailed design of the birdcage
Contractor
Nordecon AS, Tallinn
Field Service
PERI AS Estonia, Saku vald
115
Production Hall Roof Refurbishment, Gerolzhofen, Germany
LGS Lattice Girder System: temporary weather protection roof
with a span of almost 30 m
The combination of the LGS weather protection roof The ridge bars facilitate easy fixation of the roof inclina- The 30 m long girder segments could be completely
with the VARIOKIT Engineering Construction Kit acceler- tion when lifting the LGS girder segments while connec- pre-assembled on the ground by hand and then lifted
ated implementation of the execution solution and was tions are made largely without tools using bolts and cot- into position with the mobile crane.
also very cost-effective. ter pins.
116
Building Redevelopment
Contractor
Eugen Wahner GmbH, Sulzfeld
Field Service
PERI Nuremberg and Weissenhorn
Thorsten Wahner
Site Manager and
Managing Director:
30.60
26.75
14.60
117
Sceptic Tank, Wastewater Treatment Plant, Kassel, Germany
PERI UP in the balanced cantilever construction: minimum use
of materials – maximum results
Contractor
Laudemann GmbH, Sontra
Thomas Fischbach
Field Service
Supervisor PERI Franken and Weissenhorn
118
Building Redevelopment
Ø 21.30
Ø 1.65
38.95
Ø 1.20
The four-sided platforms positioned half-way up – each
with 9 m cantilevers – served, in addition to the scaffold
bracing, in particular for assembling the bracing for the
sludge digestion chamber.
119
Eaton Centre, Toronto, Canada
Modernizing with PERI UP without restriction of use
120
Building Redevelopment
During the modernization of the Canadian tractors. At the same time, protective roof
shopping centre, the PERI UP scaffold solu- structures ensured that visitors could move
tion made a very convincing case through around the mall safely. Through the detailed
its great adaptability – and provided both scaffold and cycle planning with generous-
users and visitors with maximum safety. ly-dimensioned passageways along with
This was particularly important as the large-sized advertising banners, a construc-
extensive refurbishing work was carried out tion site atmosphere was scarcely felt in
during normal business hours. spite of the ongoing modernization meas-
ures. Bridging width and passage heights David Gerdun
The seven-storey Toronto Eaton Centre is were optimally adapted to suit the use of Site Superintendent
home to over 230 shops, restaurants and the centre by the visitors as well as the
service providers as well as an impressive geometry of the building. “We have used PERI scaffolding sys-
glass gallery, and is one of the largest shop- tems in several projects in the past -
ping malls in Canada. Over a period of two Here, PERI UP Rosett provided several the PERI scaffolding solution takes
years, the shopping centre underwent advantages: the modular scaffold could be into account all site conditions. The
extensive renovation and modernization. flexibly adapted to the geometrical and stat- adaptable modular scaffolding system
While escalators, elevators, floor coverings, ic requirements – for maximum accessibili- along with the logistical support ena-
balustrades and lighting were being ty for the workmen. The ledger connections bled us to achieve the strict safety,
replaced on several floors at one time, the by means of the Gravity Lock, installation of speed, convenience and aesthetic
mall nevertheless remained open for visi- the steel decks with integrated lock against requirements of the project.”
tors as usual. lift off as well as the lattice girder bridging
with the help of the starter tube also accel-
With the help of the PERI UP Rosett scaf- erated scaffold erection and ensured safe
fold system, PERI’s Canadian engineers working conditions during assembly, modifi-
created a project solution complete with cations and dismantling. Furthermore,
working platforms and integrated access for selected system components were used
subsequent work carried out by sub-con- which, in addition to the static require-
ments, also met all aesthetic demands.
Contractor
PCL Construction, Mississauga
Field Service
PERI Scaffolding Services Inc. Canada, Bolton
Refurbishing work took almost 2 years – The publicly accessible areas were strictly separated from the working
however, the Toronto Eaton Centre was areas by means of advertising banners – and thus made safe for pas- The PERI UP Rosett scaffold solution could be adapted
open for visitors during the entire project. sers-by. to meet all geometrical and static requirements.
121
St. Vitus Cathedral, Prague, Czech Republic
Customized church scaffolding increases working safety
Required cantilevers could be realized with both scaffold PERI UP Flex adapts perfectly to the complex geometry In order to preserve the historic structure of the St. Vitus
brackets and system diagonals. in 25 cm increments. Cathedral in Prague, on-going restoration and scaffolding
work was required.
The restoration of the historic St. Vitus Through the 25 cm grid arrangement, PERI
Cathedral in Prague called for an adaptable UP Flex can be adapted to suit almost any
scaffolding system with working levels also geometric shape, and the direction of the
designed to accommodate the storage and decking within a scaffold bay can also be
transport of large-sized blocks of stone. turned at will. As a result, the distance
between the working level and the structur-
St. Vitus Cathedral is situated entirely within al element being worked on is minimized.
the Prague Castle complex and is the most This optimized the working conditions for
visited place of interest in the country with the stonemasons and increased the level of Róbert Šupej
1.5 million visitors a year. In order to pre- safety. Scaffold Contractor
serve the historic structure of the Goth-
ic-style cathedral which was built in 1344, During the scaffold planning phase, the can- “We love to work with PERI UP
ongoing and extensive restoration work tilevered transition points to be mounted as because it is flexible and safe. This is a
was required. well as the defined load transfer into the big advantage particularly for the work
stable existing structure and on the access on the St. Vitus Cathedral in Prague.”
The PERI UP Flex modular scaffolding sys- areas were taken into consideration. In
tem served as a flexible, adaptable working addition, pedestrian tunnels were integrat-
scaffold - as well as for material storage and ed into the scaffold construction which was
support system for the almost 45 m high covered with safety nets in order to protect
traction elevators. Thus, the working levels the numerous crowds of visitors.
were 4.50 m wide in some areas in order to
accommodate the large-sized and up to
600 kg stone blocks.
Restoration
Kamenosochařství Pánek, Říčany
Scaffolding Contractor
Šupej Scaffolding Contractors, Žilina/Slovakia
Field Service
PERI spol. s.r.o., Czech Republic, Jesenice and Prahy
122
Building Redevelopment
123
Burlington Canal Lift Bridge, Hamilton, Canada
PERI UP suspended scaffold for an historical steel bridge
Since 1962, the lift bridge on the west bank of Lake over 33 m. The navigation season usually runs from late
Ontario spans the Burlington Canal. The steel super- March to late December so all scaffolding and repair
structure weighs a total of 2.200 t and can be raised work was limited to the 55-day winter shut-down period.
124
Building Redevelopment
The historical steel bridge across the Burl- the cantilevered suspension – such as the
ington Canal had to be comprehensively MPB 24 aluminium beam. Taking into con- Jeff Butcher
refurbished and treated with anti-corro- sideration the three-dimensional lattice Managing Director
sives. The whole, 111 m long western side frame of the bridge, the Canadian PERI
including the scaffolding work had to be design engineers provided a solution allow-
done within only 55 days – at the same ing for a quick and safe assembly process –
time, the eastern side remained open for and also made sure that the work area was
public traffic. completely contained so that any kind of
water pollution could be excluded. “The PERI system and engineering
The PERI solution with a suspended scaf- design for our bridge project outper-
fold on the basis of the PERI UP Rosett formed all other scaffolding systems.
modular scaffolding also made use of renta- We were very impressed with the
ble PERI formwork system components for PERI suspended scaffold.”
16.19
The detailed PERI plan- Contractor
ning of the scaffold sus- Dayson Industrial Services Inc., Hamilton
pensions took into Field Service
account the numerous PERI Toronto, Canada
available bridge compo-
nents.
2.91
2.40
The externally mounted scaffold bay provided perfect
accessibility. Before the refurbishment work started, the
complete working area was hermetically enclosed with
plywood sheeting and tarpaulins so that any environ-
mental hazards could be excluded.
The PERI UP suspended scaffold could be attached to the doubled up PERI MPB 24
aluminum beams – downwards via DW 15 tie rods and laterally with a cantilever of
over 2 m.
125
Cristo Rei Monument, Lisbon, Portugal
Fast assembly but still flexible with facade scaffolding
28.00
the structure, high wind forces could be
expected due to the close proximity of the
coast. In addition, the scaffolding was to be “Two points in particular convince me
used as rentable advertising space for the of the benefits of PERI UP: the quick
duration of the project. assembly times that can be achieved
and the high level of safety which is
PERI´s Portuguese engineers submitted a provided by the system’s construc-
comprehensive contract package which tion.”
included the delivery of materials, detailed
planning as well as an accurate logistical
schedule. This enabled all project require-
ments to be completely fulfilled.
Client
Santuário de Cristo Rei, Almada, Lisbon
Field Service
81.00
PERI Lisbon, Portugal
Work could be safely carried out on the spacious and 1.50 m - 3.00 m bay lengths were arranged to scaffold
geometrically adapted working platforms of the PERI UP the face of each leg of the base.
Rosett scaffold which was erected up to the head of the
statue at a height of over 100 m.
25.50
25.50
126
Building Redevelopment
127
Motorway Bridge T4, Paradisia-Tsakona, Greece
Supporting system solution – individually adapted
Nikolaos Donas
Site Manager
128
Combined Solutions
Bundled 42-leg VARIOKIT heavy-duty shoring towers By halving the 150-cm basic grid using 75 cm long ledg- PERI engineers combined two modular construction
carried the extremely high loads in the area of the steel ers, PERI UP could be optimally adapted to accommo- systems to form a comprehensive load-bearing concept
arch connections. date the load concentrations. with heights of up to 20 m.
A huge inclined pier supports the motorway Supporting element of the bridge is a work was formed, gradually increasing up
bridge on the Greek peninsula of Pelopon- huge, almost 30 m high inclined twin-pillar to the total support height of over 20 m to
nese. A team of Greek and German PERI pier with an asymmetrical V-shape. On the the rear and upwards respectively. Using
engineers supported the site management one hand, this serves as an intermediate 25, 50 and 75-cm long ledgers, the 150-cm
team with project-specific system solu- support for the in-situ concreted carriage- basic grid could be adapted extremely flexi-
tions. way and, on the other, as support and start- bly here to suit the geometric and static
er section for the steel arch. requirements. This allowed the polygonal
The 160 km long A7 motorway connects 32° to 36° shallow-pitched inclined piers on
the towns of Kalamata and Corinth. The PERI developed a comprehensive formwork both sides of the bridge to be constructed
principle element used to close the gap and scaffolding solution – for constructing in eight segments, each 4.50 m long.
between Paradisia and Tsakona is a 390 m the pier structure and reinforced concrete
long arched bridge. Two-thirds of the 22 m superstructure as well as providing tempo- Trusses consisting of rentable VARIOKIT
wide bridge superstructure is suspended on rary support for the bridge during the entire standard elements supported the oblique-
a steel arch and was constructed using the building project. Essentially, two modular ly-positioned VARIO GT 24 girder formwork
steel composite construction method. For construction systems were combined with and transferred the formwork and concret-
the northern bridge section, a pre-stressed each other in order to transfer the high ing loads of the inclined piers safely into the
concrete superstructure variant was select- loads safely into the ground. With help of scaffolding. In addition, the VARIOKIT mod-
ed which features a twin-cell hollow box PERI UP Flex, a spatial load-bearing struc- ular construction system formed the basis
cross-section. ture for the piers and superstructure form- for the heavy-duty shoring. In the connect-
ing area between the cast-in-place bridge
and steel arch, two 17 m high, 42-leg
heavy-duty shoring towers were used to
accommodate the high loads – until the
inherent load-bearing capacity was reached.
Due to the long utilization period, each
tower was designed to carry loads of 1,200
t as well as high earthquake and horizontal
loads. For load concentrations, four stand-
ard towers respectively, each with 2.00 m
by 2.00 m axis dimensions, could be bun-
dled by means of 37.5 cm additional frames
– using only rentable system components
Contractor
ARGE Alpine Bau G.m./Terna SA and type-tested connection means.
Field Service
PERI Hellas Ltd., Athens and PERI GmbH Germany,
Weissenhorn
129
Bridge over the Golden Horn, Istanbul, Turkey
Efficient forming and shoring with modular construction systems
The combination of detailed planning work, a combination of cable-stayed and swing Framework units on the basis of the PERI
continuous site supervision and optimized bridges as well as a 450 m foreland bridge UP Rosett Flex modular scaffolding formed
system use was the basis for ensuring fast the supporting structure for transferring the
construction progress and excellent quality The construction of the single-webbed vertical and horizontal loads. The supporting
of execution. T-beam cross-section superstructures in the heights of between 1 m and 14 m could be
foreland areas was realized on PERI UP flexibly realized whilst the framework unit
The bridge over the Golden Horn (Turkish: falsework. Web and cantilever formwork width was maintained at a constant 2.00 m.
Haliç) connects the historical, millennia-old were formed with variable frame construc- In the area of the piers, the carriageway
Istanbul with the modern, European-influ- tion units comprising of VARIOKIT system slab is up to 2.50 m thick: here, the shoring
enced districts of the city. It is an integral components due to the continuously chang- tower width was halved with the legs bun-
part of the urban transport system expan- ing cross-section. With the help of CNC- dled in 50 cm x 100 cm grid dimensions.
sion programme in an effort to cope with milled formwork units prepared at the PERI The bay lengths of 25 cm to 2.50 m in the
the increase in traffic volumes: two 950 m formwork assembly hall, the distinctive direction of the frames could also be adapt-
long subway tracks cross over the famous form of the bridge underside could be real- ed to suit the web and cantilever thickness-
Bosphorus Straights. The new connection is ized through curvatures in the transverse es - in 25 cm increments by means of sys-
and longitudinal directions. tem ledgers without any additional effort.
130
Combined solutions
Optimized load transfer: superstructure The VARIOKIT framework units trans- With the help of the PERI UP Flex modu-
formwork and falsework for the foreland fered the loads into the shoring while the lar scaffolding system, obstructions could
bridges based on the flexible VARIOKIT curvatures in the transverse and longitu- easily be accommodated.
and PERI UP modular construction sys- dinal directions were formed with form-
tems. work units.
Contractor
Astaldi – Gülermak J.V.
Field Service
PERI Kalıp ve İskeleleri San. ve Tic. Ltd.Şti Turkey, Istanbul
12.60
72.50
1.10
2.50
14.00
The thickness of the massive bridge superstructure changed continuously from 1.10 m to 2.50 m.
Superstructure formwork and framework units could be easily adapted to suit the varying geometries and loads.
131
Parco della Musica e della Cultura, Florence, Italy
Problem-free construction progress with formwork and scaffolding
from one source
Contractor
Società Consortile Parco della Musica a.r.l.
Field Service
Mauro Mezzaroma
PERI S.p.A. Italy, Basiano Office Technical Director
132
Combined Solutions
The complicated structural architecture mized transfer of loads. Interface problems PERI UP Rosett modular scaffolding was
required achieving an optimal combination were kept to an absolute minimum, errors used as working scaffold as wel as shoring.
of the formwork and scaffolding to be used. in the execution were avoided and produc- The metric basic grid and the use of short
Through the compatibility of the system, tivity was maximized. Furthermore, formal ledgers allowed the bay sizes to be optimal-
load transfer is optimized, building work procedures for the building contractor were ly sub-divided in both width and depth in 25
simplified as well as accelerating the con- much easier and less time-consuming as cm increments. Furthermore, the massive,
struction progress. PERI engineers also coordinated and pro- up to 1.20 m thick structural components of
vided the static for both the shoring and the stage tower – 15 m above the central-
The music and cultural park features an formwork. ly-positioned stage – resulted in very high
opera house with 1,800 seats, a concert temporary loads, combined with high
hall for 1,100 music lovers and a theatre for The implementation was technically demands placed on the load-carrying con-
audiences up to 2,000. Generously-sized extremely challenging. For example, the struction with regard to geometrical adapta-
free areas and boulevards as well as an entrance foyer of the large opera house tion. For this, PERI UP shoring was com-
underground car park with 700 parking bays cantilevered for more than 16 m at a height bined with the MULTIPROP system.
supplement the unique building ensemble. of 20 m – over a total length of 46 m. Here,
The short construction period for the con-
crete shell of only 18 months required a
high level of commitment from the person-
nel: a team of around 300 workers worked
in multiple shifts which often included
nights. For this, the construction team
required large quantities of materials that
were delivered to the jobsite just-in-time
from the PERI rental park.
The MULTIPROP system carried the A steel framework construction supports the slab above the auditorium
The 1,800-seat opera house (shown in the foreground) formwork and concreting loads of the parquet. PERI UP, MULTIPROP as well as units comprised of SLS spin-
is characterized by a complex design featuring inclined 1.20 m thick walls of the stage tower at a dles and SRU walers were ideally combined as a load-carrying system
and curved levels. height of 15 m. providing temporary assembly support.
133
PERI International
RU
CA
KZ
US AZ TM KR JP
TN LB
MA IL JO IR
KW
MX DZ EG QA HK
SA AE IN
OM
TH VN
PH
PA NG
CO MY
SG
ID
TZ
PE BR
AO MZ
NA
BW
CL
AU
ZA
AR
NZ
MX
Mexico DZ
Algeria AZ
Azerbaijan LB
Lebanon
PERI Cimbras y Andamios, S.A. de C.V. S.A.R.L. PERI PERI Repesentative Office PERI Lebanon Sarl
www.peri.com.mx www.peri.dz www.peri.com.tr lebanon@peri.de
PA
Panama BW
Botswana HK
Hong Kong MY
Malaysia
PERI Panama Inc. PERI (Proprietary) Limited PERI (Hong Kong) Limited PERI Formwork Malaysia Sdn. Bhd.
www.peri.com.pa www.peri.co.bw www.perihk.com www.perimalaysia.com
US
USA EG
Egypt ID
Indonesia OM
Oman
PERI Formwork Systems, Inc. Egypt Branch Office PT Beton Perkasa Wijaksana PERI (L.L.C.)
www.peri-usa.com www.peri.com.eg www.betonperkasa.com www.perime.com
MA
Morocco IL
Israel PH
Philippines
PERI S.A. PERI F.E. Ltd. PERI-Asia Philippines, INC.
South America www.peri.ma www.peri.co.il www.peri.com.ph
AR
Argentina MZ
Mozambique IN
India QA
Qatar
PERI S.A. PERI (Pty.) Ltd. PERI (India) Pvt Ltd PERI Qatar LLC
www.peri.com.ar www.peri.co.mz www.peri.in www.peri.qa
BR
Brazil NA
Namibia IR
Iran SA
Saudi Arabia
PERI Formas e Escoramentos Ltda. PERI (Pty.) Ltd. PERI Persa. Ltd. PERI Saudi Arabia Ltd.
www.peribrasil.com.br www.peri.na www.peri.ir www.peri.com.sa
CL
Chile NG
Nigeria JO
Jordan SG
Singapore
PERI Chile Ltda. PERI Nigeria Ltd. PERI GmbH – Jordan PERI Asia Pte Ltd
www.peri.cl www.peri.ng www.peri.com www.periasia.com
CO
Colombia TN
Tunesia JP
Japan TM
Turkmenistan
PERI S.A.S. PERI S.A.U. PERI Japan K.K. PERI Sanayi
www.peri.com.co www.peri.es www.perijapan.jp www.peri.com.tr
PE
Peru TZ
Tanzania KR
Korea TH
Thailand
PERI Peruana S.A.C. PERI Formwork and Scaffolding Ltd PERI (Korea) Ltd. Peri (Thailand) Co., Ltd.
www.peri.com.pe www.peritanzania.com www.perikorea.com www.peri.co.th
ZA South Africa KW
Kuwait VN
Vietnam
PERI Formwork Scaffolding (Pty) Ltd PERI Kuwait W.L.L. PERI ASIA PTE LTD
www.peri.co.za www.peri.com.kw www.peri.com.vn
134
IS
FI
NO
SE EE RU
LV
IR DK
LT
GB
BY
NL
PL
BE DE
LU
CZ UA
PERI GmbH SK
FR
Formwork Scaffolding Engineering CH AT
HU
Rudolf-Diesel-Strasse 19
SI
89264 Weissenhorn RO
IT
Germany
HR BA
Tel. +49 (0)7309.950-0 PT RS
ES
Fax +49 (0)7309.951-0 BG
info@peri.com
www.peri.com
AL
GR TR
Oceania
AU
Australia DE
Germany IS
Iceland RU
Russia
PERI Australia Pty. Ltd. PERI GmbH Armar ehf. OOO PERI
www.periaus.com.au www.peri.de www.armar.is www.peri.ru
NZ
New Zealand DK
Denmark IT
Italy SE
Sweden
PERI Australia Pty. Limited PERI Danmark A/S PERI S.r.l. PERI Sverige AB
www.peri.co.nz www.peri.dk www.peri.it www.periform.se
EE
Estonia LT
Lithuania SI
Slovania
PERI AS PERI UAB PERI oplate i skele d.o.o
Europe www.peri.ee www.peri.lt www.peri.com.hr
AL
Albania ES
Spain LU
Luxembourg SK
Slovakia
PERI Kalıp ve İskeleleri PERI S.A.U. N.V. PERI S.A. PERI spol. s. r.o.
www.peri.com.tr www.peri.es www.peri.lu www.peri.sk
AT
Austria FI
Finland LV
Latvia TR
Turkey
PERI Ges.mbH PERI Suomi Ltd. Oy PERI SIA PERI Sanayi ve Ticaret Ltd.
www.peri.at www.perisuomi.fi www.peri-latvija.lv www.peri.com.tr
BE
Belgium GB United Kingdom NO
Norway
N.V. PERI S.A. PERI Ltd. PERI Norge AS
www.peri.be www.peri.ltd.uk www.peri.no
BG
Bulgaria GR
Greece PL
Poland
PERI Bulgaria EOOD PERI Hellas Ltd. PERI Polska Sp. z o.o.
www.peri.bg www.perihellas.gr www.peri.com.pl
BY
Belorussia HR
Croatia PT
Portugal
IOOO PERI PERI oplate i skele d.o.o. Pericofragens Lda.
www.peri.by www.peri.com.hr www.peri.pt
CH
Switzerland HU
Hungary RO
Romania
PERI AG PERI Kft. PERI România SRL
www.peri.ch www.peri.hu www.peri.ro
CZ Czech Republic IR
Ireland RS
Serbia
PERI spol. S r.o. Siteserv Access & Formwork PERI oplate d.o.o.
www.peri.cz www.siteservaccess.ie www.peri.rs
135
Formwork
Scaffolding
Engineering
www.peri.com
Scaffolding Technology
Scaffolding Technology