UNIT TAG
STATION RIFFA
Basement Corridor Grid 2-3
LOCATION
L1-14
MANUFACTURER MAICO-DYNAIR
MODEL NO CC-HT 1004-T 6-12°
SERIAL NO 1CY1206
CHECK LIST
2 Pre-Commissioning Checks
2.01 Check motor & fan name plate and compare with approved submittal
Fan casing free of debris and transit bolts removed. Check the
2.02
connection of fan inlet & outlet are done with proper alignment
2.03 Fan rotates freely
2.04 Varity all respective electrical components before starting the fan.
2.05 Direction of Rotation of fan
2.12 Flexible connections are properly installed and are in good condition
2.15 Check pulley alignment and check belt tension. (If Applicable)
2.16 Check fan and motor bearings for lubrication. (If Applicable)
2.17 Check Electrical isolaor for access and varify circuits & operation.
2.18 Check Electrical isolaor for access and varify circuits & operation.
Comments
Name
Position
Signature
Date
1- All relevant Drawings and Document must be attached with it
2- * If Applicable
Form No M009-REI-QMS-FRM-00134
MPS Meter Per Second SQM Square Meter
PSAT/ PRE-COMMISSIONING CHECKLIST FOR
PRESSURIZATION FAN
IRE REF NO
DATE _______/ ________/ _________________
M009-SPH-MHV-DWG-GWST080-L1-11001
DWG REF Nos.
M009-SPH-MHV-DWG-GWST080-AA-17005
PRO/ITP M009-SPH-MEP-ITP-00067
TEST BASIS REPORTS M009-SPH-MEP-CLN-00001
VARIFIED BY
Specialist/ Supervision
SPH T&C Date REMARKS
Vendor* Engineer
Supervision Engineer SPH T&C PMC (Witness)
Revision 2
Pa Pascals LPS Liter Per Second ESP Ext. Static Pressure
UNIT TAG PF-01 - Duty IRE REF NO
STATION RIFFA DATE
Basement Corridor Grid 2-3
LOCATION
L1-14 DWG REF Nos.
MANUFACTURER MAICO-DYNAIR
MODEL NO CC-HT 1004-T 6-12° PRO/ITP
SERIAL NO 1CY1206 TEST BASIS RE
Article DESIGN DATA TEST DATA
Fan Flow (LPS) 6,801 6,186
L1 Closed 51 52 AG
CL Closed 50 45
A2. TEST DESIGN CONDITION 2 - "Analysis with Opened Doors - Veloctiy & Pressure" (Area
Velocity Min. Req.
Test LOCATION DOOR LOCATION DOOR
@ Door Velocity
STATUS STATUS
Scenarios FLOOR MPS MPS FLOOR
1 L1 Open 2.22 1.00 AG Open
Name
Position
Signature
Date
1- All relevant Drawings and Document must be attached with it
* Where Applicable
Form No M009-REI-QMS-FRM-00135
MPS Meter Per Second SQM Square Meter Pa Pascals
B. Fan & System Performance Tests
B1. Main Duct Traverse Test Data
Design
Duct Size MM Duct Area Measured Aver
Velocity
Duct Traverse W H SQM MP
MPS
Measurements & Details
1000 950 0.95 7.16 6.5
Readings 1 2 3 4 5 6
i 5.14 5.56 6.10 6.53 6.53 6.63
ii 5.78 5.99 6.42 6.96 6.63 6.85
iii 6.85 7.17 7.60 7.28 6.74 7.06
iv 5.78 7.60 7.17 7.28 6.74 7.28
v 5.14 8.03 7.70 6.74 6.63 7.17
vi 5.03 6.96 7.28 6.31 6.21 6.85
vii 4.92 5.67 6.21 6.10 6.10 6.27
viii
B2. Terminals Test Data - TEST DESIGN CONDITION 3 - "Analysis With Exterior Door
Total Measured Flow Total Required Flow % Measured/
Terminal Velocity LPS LPS Required
Measurements & Details
6,042 6,801 88.8%
Position
Signature
Date
1- All relevant Drawings and Document must be attached with it
* Where Applicable
Form No M009-REI-QMS-FRM-00135
MPS Meter Per Second SQM Square Meter Pa Pascals
STANDALONE TEST (SAT)
COMMISSIONING CHECK LIST FOR
PRESSURIZATION FAN
IRE REF NO M009-SPH-TCH-IRE-23172
DATE 21/Nov/18
M009-SPH-MHV-DWG-GWST080-L1-11001
DWG REF Nos.
M009-SPH-MHV-DWG-GWST080-AA-17005
PRO/ITP M009-SPH-MEP-ITP-00067
TEST BASIS REPORTS M009-SPH-MEP-CLN-00001
TEST DATA COMMENTS
6,186 91.0% of Design @ Traverse
396
415/3/50
5.9
10.23
LOCAL ISOLATOR
L1-14
L1 Closed 20
Revision 4/21/2018
LPS Liter Per Second ESP Ext. Static Pressure
Measured
Measured Average Velocity
% Design Flow % Design
MPS
LPS
97.7%
7 8 9 10
4.14 4.25 4.68
3.70 3.38 4.68
3.81 3.43 4.57
3.38 3.92 4.79
3.05 3.70 5.55
2.94 3.59 5.34
2.83 3.27 3.48
7 8 9 10
6.28 6.06 3.97
5.75 6.01 4.70
5.24 5.17 3.86
4.02 3.57 3.66
4.83 5.03 3.44
3.18 3.06 3.24
2.53 2.46 2.93
7 8 9 10
5.70 5.99 5.13
5.51 5.70 4.94
5.04 5.13 4.39
4.66 4.66 4.18
3.57 3.90 3.33
1.59 1.33 3.33
0.88 1.24 2.72
Revision 4/21/2018
LPS Liter Per Second ESP Ext. Static Pressure