Sie sind auf Seite 1von 1
(De SENSOR LOCATIONS: ARIFER TO CHILLED WATER AND HEATING WATER FLOW DIAGRAMS STE LocATE WITH CONSULTANT REMOTE. OFFERENTAL PRESSURE SENSOR 1. LONG WATER PUWPNG SYSTEMS USTED AS RUBLE LON WL HAE OUY/S™AY OR EBntenion SOMES ‘DUTY/DUTY/STANDBY PUMP OPERATION WITH VSD CONTROL. eg, CONROUER wa 2. PROVIDE PUMP START/STOP AND FAULT STATUS POINTS. PROMDE RUN/STANDBY, LEAD/LAG CONTROL. oh BOF THe STO ToL BE : : ea i 5. PROMCE TEMPERATE SENSORS AT THE SUPPLY AND REM OF ACH SYST i Ts 4. ARMM AO UNA OFPENTAL PRESSURE SET FONTS WL BE ESTABLISHED W_CONANCTON =H | WITH THE WATER BALANCING CONTRACTOR. ( H 5. ODUATE LAD PUUPSFEED To MAKTAN DFTERENTAL PRESSURE SEPONT AT THE SELECTED we |. SENSOR. (PROVIDE AN INTERFACE WITH THE PUMP VSD TO ALLOW THE BMS TO SET THE PUMP SPE. We INEXPAE SHALL ALSO PRONE ME ISD SPD FEEDBACK TO THE 8S) r 6. HEUTE LAD PUMP OPERATING AT THE LONESTACCEPTHELEORVE SPEED THE OFEREMTL i Shas Ve Conta. Wl Be SCINATED S40 WL MEOUATE To MANN PRESSURE STROM. i ‘APPLICABLE OR SUPPLY WATER. TEMPERATURE RESET TO AFFECT AND INCREASE IN FLOW. -THS 1S A i DoporH Sco tae of >ESSUTE CNEL HO MLL ALSO NOR AS'A HFEF THE VARABLE” PEED | site SYSTON i NOT FESPONONG ' EY 2. WHEY LE PUMP OBEATNG AT So LOW, REDUCE TO 45% FLON AD START AG PUMP AT 45 Lee BS yoyrome FLOM, MODULATE GOTH PUMPS IN PARALLEL TO MANTAN OP. SETPONT. IF BOTH PUUPS FALL BELOW ‘30% FLOM. STOP LAG PUP AND MODULATE LEAD PUMP SPEED TO MANTAN DP. SETPONT. 8. ALTERNATE LEAD/LaG PUMPS. 9. PROVIDE EQUNALENT STAGING/ALTERNATING FOR TRPLE PUMP (DUTY/DUTY/STANDEY) CONTROL. () LEAD/LAG PUMPING W/ VARIABLE SPEED CONTROL

Das könnte Ihnen auch gefallen