Level 2 Location Risk Assessment Sheet

Production Title Sci-fi short Location for Scene No(s). Home scene

Location Westbury Activity filming

PART B – Risk Assessment


Hazards Who exposed Risk Control measures Risk
List what could cause harm from this List who might be harmed from this activity e.g. Decide the level of risk as For each hazard, list the measures you will be taking to minimise the risk identified Now decide level of risk
activity e.g. working at height, trip staff, contractors, contributors, public, etc. if you were to do the e.g. appointing competent persons, training received, planning, use of personal once all your controls are
hazard, fire, etc. activity without your protective equipment, provision of first aid, etc. in place
controls
Tripping hazard by chairs Cast and crew VERY LOW Ensure all chairs are all tucked in and away from the filming VERY LOW
LOW LOW
scene so the filming session can be made safe and ok
MEDIUM MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH

Lifting hazards Cast and crew VERY LOW To ensure that no one harms themselves lifting objects, we VERY LOW
LOW LOW
can make sure we use equipment that is light and is a priority
MEDIUM MEDIUM
HIGH
to be carried carefully HIGH
EXTREMELY HIGH EXTREMELY HIGH
Water damage to the Cast and crew VERY LOW Ensure that the equipment is kept away from water to VERY LOW

equipment LOW prevent water damage occurring during the production LOW
MEDIUM MEDIUM
process
HIGH HIGH

EXTREMELY HIGH EXTREMELY HIGH

The camera equipment Cast and crew VERY LOW To shoot not as many precarious shots to prevent the risk of VERY LOW
LOW LOW
being dropped or the camera equipment being put at risk
MEDIUM MEDIUM
damaged HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH
VERY LOW VERY LOW
LOW LOW
MEDIUM MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH

Director/Production Manager Signature Erin Goble Date of Location Recce 20/11/18