The Case for an Engineer of Record cilitate this design customization and op-

timization. This is also why the industry


for a Metal Building System is moving away from the outdated termi-

Structural Forum
discussion on topics of current importance to structural engineers
nology, “pre-engineered metal buildings”,
By W. Lee Shoemaker, P.E., Ph.D. in lieu of the more accurate identification
Metal building systems may not be What is a Metal of “metal building systems.”
popular with some structural engineers Metal building systems have evolved
because this construction alternative
Building System? over the years into assemblages of struc- ®
competes with traditional engineering op- Many engineers (or design professionals) tural elements that work together as a

E
portunities for “conventionally” designed believe that a metal building is selected very efficient structural system. The ba-
and constructed facilities. Structural en- from a catalog of standard designs, based sic elements of the metal building system

R
gineers who realize that the metal builing on the required size of the building. Un- are: primary rigid frames, secondary

rg
segment of the low-rise construction mar- fortunately, national ad campaigns by members composed of wall girts and
ket offers an opportunity, not a threat, will “brokers” of metal building systems con- roof purlins, cladding, and bracing

U
ultimately benefit as metal building sys- tribute to this misconception, and are (Figure 1). Metal building system design
tems continue to build solid market share not representative of the common indus- may seem trivial at first, but experience

.o
t
righ a transaction
try practice that involves

T
in every low-rise marketplace — from shows that the complex interaction of
p y
strip centers to car dealerships to office Co
between a metal building manufacturer these elements into a stable system is a
complexes and call centers. and a builder. challenging engineering task. MBMA

C
Most metal building manufacturers cus- member companies have demonstrated

ag
tom design a building after the order is this expertise and are on the leading edge
“...involvement of an EOR in a project placed, based on the applicable building of systems design.

e
U
that involves a metal building system.” code, loading conditions and serviceabil-

n
ity requirements. Metal buildings are
governed by the same building codes and

i
R m
z
It is not uncommon for a building material standards as other forms of con-
owner to forego the services of an engi- struction. MBMA member companies

T a
neer of record (EOR) on a metal building have registered professional engineers
project. However, the Metal Building on staff who are highly skilled and ap-
RE
g
S
Manufacturers Association (MBMA) en- ply sound engineering principles toward

a
courages the involvement of an EOR in the optimal design of metal building
a project that involves a metal building systems. In fact, MBMA members are re-

m
system. This article provides information quired to be certified, as discussed later Typical metal building framing, but with
about the metal building industry, iden- in this article, which includes a very a clerestory.
tifies some problem areas, and discusses thorough independent audit of their
U

why the involvement of an EOR is a key engineering design practices. Advanced Roles and Responsibilities
component to a project’s success. computer methods are used to help fa- – What is the EOR Role?
When a project calls for a metal building
CT

system, design responsibilities are usually


divided between the manufacturer and the
design professional or EOR. Therefore, a
clear understanding of their respective
roles, as well as coordination and commu-
nication are crucial for success.
RU

The manufacturer is responsible only


for the structural design of the metal
building system it sells to the builder.
The manufacturer is not the design
professional or the EOR for the con-
struction project. The manufacturer is
not responsible for the design of any
ST

components or materials not sold by


them. Nor are they responsible for
the interface and connection of other
components with the metal building
system, unless such design responsibi-
Figure 1 Anatomy of a Metal Building – Showing the primary framing, secondary framing,
lity is specifically required by the order
roof/wall cladding, and bracing. documents.
continued on next page

Structural Forum is intended to stimulate thoughtful dialogue and debate among structural engineers and other participants in the
design and construction process. Any opinions expressed in Structural Forum are those of the author(s) and do not necessarily reflect the
®
views of NCSEA, CASE, SEI, C 3 Ink, or the STRUCTURE magazine Editorial Board.

STRUCTURE magazine 9 March 2007


It is the responsibility of the metal build- turer typically reviews the order documents, deflection, and vibration. This is a critical need
ing manufacturer to design a metal building while the EOR often evaluates the contract in the project’s specification phase, as service-
system to conform to the specifications, in- documents to ensure the specifications and ability decisions address an owner’s needs and
cluding the design criteria and design loads drawings have been properly interpreted. preferences that may not be spelled out in the
incorporated by the builder into the order doc- The owner may retain an EOR to create building code.
uments. The manufacturer is not responsible Metal building systems, clad in flexible
for making an independent determination metal siding and roofing, can tolerate size-
of any local codes or any other requirements able amounts of movement. However, ®
not mandated within the order documents.

E
masonry, concrete and other more brittle
When specified by the order documents, the wall materials are increasingly being incor-
manufacturer is responsible for supplying porated into metal building systems because

rg
adequate evidence of compliance with the of owner or architectural preferences. This
specifications, design criteria, design loads, is especially true for many retail and insti-
and other specified information necessary tutional applications.

U
for the EOR to incorporate the metal building Since drift limits are not covered in the
system into the construction project.

.o
ht
Depending on theigapplication and architectural building codes, it is important they are proper-

T
yr building system can look no
treatments,oapmetal ly specified, depending on the flexibility of the
“An EOR is in a better position to evaluate C
different than other construction. wall materials. MBMA recommends using

C
the owner’s needs and recommend the American Institute of Steel Construction

ag
the contract documents. The EOR may also
appropriate serviceability limits...” (AISC) Design Guide No. 3, Serviceability
review the shop drawings prepared by the con-
Design Considerations for Low-Rise Buildings
tractor (or subcontractor or manufacturer).

e
U
(recently revised and renamed, Serviceability
MBMA highly recommends that the end In some cases, construction contracts require
Design Considerations for Steel Buildings).
customer hire an EOR to be responsible for the contractor to provide delegated design

i n
R
engineering to a licensed professional. The

m
specifying the design criteria for the metal

z
building system. These design criteria, to be engineering is based upon the manufacturer’s “...a proper specification ensures the

T
used by the builder and manufacturer, should specific component properties and may be building performs satisfactorily and meets
include the geometric requirements, all ap-
a
performed by the manufacturer or by an the owner’s requirements.”
RE
g
plicable codes and/or design loads, site and experienced independent structural engineer.

S
construction conditions that affect design
While it is important to specify appropriate

a
criteria, and serviceability criteria. As with any “The owner does not always understand drift limits, giving consideration to the deflec-
building, clear and accurate specifications the need for an engineer of record...” tion tolerances of any brittle wall elements, it

m
ensure the builders/manufacturers bidding on
should also be understood that limits that are
the project understand and interpret the re-
overly restrictive influence the cost of a build-
quirements in a similar and accurate manner. The metal building system is just one ele-
U

ing. An EOR is in a better position to evaluate


Just as importantly, a proper specification en- ment of the total construction project. For the owner’s needs and recommend appropriate
sures the building performs satisfactorily and example, the metal building manufacturer serviceability limits, such as given in the
meets the owner’s requirements. rarely provides site preparation, mechanical-
CT

reference cited above, that do not lead to


In the sale of most metal building systems, work, electrical design, and certain building unnecessary building costs.
there are at least two independent written envelope components/accessories. Similarly,
agreements – the building order documents he or she is not responsible for the founda-
and the contract documents. The order docu- tion’s design. The EOR is typically responsible Inspection Services
ments are normally required to process the for these important elements of the project as One of the most common problems that
order for the metal building system, while the well as floor slabs, interior/exterior concrete can occur with metal building systems is
RU

contract documents (including the drawings masonry and/or tilt-up walls, and the con- quality control during the erection process.
and specifications) define the material and nection of these walls to the metal building Flange braces that are left out may not show
work to be provided by the contractor for framing. With regard to the foundation de- up until a major snowstorm. The metal
the total construction project. The manufac- sign, the manufacturer does prepare the anchor building manufacturer is not responsible for
bolt plans showing the location, inspection of a construction project unless this
diameter, and projection of the is incorporated into the order documents.
bolts required to attach the Typically, a manufacturer is limited because of
ST

metal building system to the logistical constraints as well as not having the
foundation. expertise in inspection services. Furthermore,
a manufacturer is not in the best position to
Serviceability inspect the work of the builder who is the
An EOR can provide the own- manufacturer’s customer.
er with essential advice on the Ideally, an end customer should utilize
serviceability requirements for a the inspection services of the EOR for the
project, especially with regard to project to provide this important function.
the building’s functional perfor- The EOR can ensure that the project is
For longer spans, bar joists are used instead of cold-formed purlins.
mance requirements under ser- constructed according to the manufacturer’s
vice loads, including lateral drift, erection drawings.
continued on page 12

STRUCTURE magazine 10 March 2007


Certification of ponents not supplied by the metal building
manufacturer and their interface with the met-
the Manufacturer al building, and providing inspection services
An EOR should also be aware of the rig- as needed or required by the building code.
orous certification program that is available MBMA is trying to be more proactive in
to metal building manufacturers through working with the engineering community
AISC. This can be an advantageous addition to educate EOR’s about the metal ® building
to the specification of a metal building sys- industry and to find ways to improve the co-

E
tem by requiring that the manufacturer be ordination and understanding of the shared
AISC-MB certified. Manufacturer certifica- design responsibility in metal building proj-
tion should be included in the specification,

R
ects. It is hoped that this article will help in

rg
because it ensures the building is being provid- A metal building system with a steep roof
this important effort.▪
ed by a manufacturer that has demonstrated and masonry wall cladding.

U
a high level of competency in all aspects More information is available in
of engineering design and fabrication. turer can have a higher level of confidence
the newly updated Metal Building

.o
In fact, the metal building industry is the that they are working
t with a thoroughly
igh A current list of certi- Systems Manual, as well as other

T
r
qualified company.
y
only industry that has a certification program
incorporating design engineering. The pro-
Cop
fied manufacturers is available on the AISC publications on the MBMA
website (www.aisc.org). website (www.mbma.com).

C
gram also examines policies and procedures

ag
at each of the manufacturer’s facilities, and
verifies the application of those policies and Summary W. Lee Shoemaker is the Director of Research

e
U
procedures within randomly selected projects. Metal building systems are widely used in and Engineering for the Metal Building

n
Inspection and evaluation teams from an in- all types of building applications. The owner Manufacturers Association, Cleveland, OH.

i
dependent engineering auditing firm annu- does not always understand the need for an

R
He serves on the ASCE 7 Committee, the

m
ally observe and evaluate the manufacturer

z
engineer of record and his/her role in a proj- AISC Steel Specification Committee and
in almost every aspect of professional design ect. MBMA highly recommends that the end

T
the AISI Cold-Formed Steel Specification

a
and manufacturing. customer hire an EOR to be responsible for
Committee. He can be reached via e-mail at
Therefore, an EOR working on a metal specifying the design criteria for the metal
RE
g
shoemaker@mbma.com.

S
building project with a certified manufac- building system, designing the building com-

a
m ADVERTISEMENT – For Advertiser Information, visit www.STRUCTUREmag.org
U
CT
STEEL TO STEEL

STEEL CAVITY

STEEL FLOOR
RU
ST

www.lindapterna.com
(888) 724-2323
Email inquiries to: gen-s@lindapter.com

STRUCTURE magazine 12 March 2007