Implementation of

National Building
Code in the AFP

27 April 2016

4/23/2018 AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism 1


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
SCOPE OF PRESENTATION

❖ References
❖ Objectives
❖ Process of Implementation
❖ Application Forms Necessary for Building Permit
❖ Certificate of Occupancy
❖ Organizational Structure
❖ Duties & Responsibilities of Building Official Division

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
REFERENCES:

Secretary
DPWH Letter
PD 1096 – The Authority:
Designation of SOP 34 dtd Staff Memo
National 10 Sep 2009 –
Building Code TCE, AFP as No. 21 GHQ
Implementatio AFP
of the AFP Building n of PD 1096
Philippines and Official in the AFP (Revised)
its IRR Pursuant to
SO No. 08 dtd
07 Jan 2016
(PD 1096 – The National Building Code of the Philippines and its IRR)

The National Building Code of the Philippines (Presidential


Decree No. 1096) was enacted to "provide for all buildings and
structures, a framework of minimum standards and
requirements to regulate and control their location, site, design
quality of materials, construction, use, occupancy, and
maintenance."
OBJECTIVES (SOP Nr. 34)

❖ To construct structures that conform to the minimum


standard of quality and safety.

❖ To enhance AFP’s operational efficiency and


effectiveness through sound and doable structures and
facilities
OBJECTIVES (SOP Nr. 34)

❖ To avoid irregular and unauthorized conduct of


construction and repair inside military camps, bases,
installations and reservations inconsistent to quality and
structures, sound design and base development planning.

❖ To complement the effort of the Department of Public


Works and Highways in the implementation of the Code
inside military camps, bases, installations and
reservations.
Process of Application of Building Permit
Base Cmdr will apply for OBO will process the clearances and
Clearance (see Sec. 302, Gov’t Agencies permits
Par 12 of revised IRR permits to be issued
2 4
Process (Plans and Specs)
submit a Clearance Certificate to
the BO
9 Issue bldg. permit if PL
Non Compliant to & SP is NBC
Base Cmdr will apply the NBC Provisions compliant
for Bldg. Permit to BO BO performs
5
1 3 BO, MSE’s Final Inspection
16
8
6
Base
Cmdr
Application of
Resubmit the permit 14
7
bldg form
Bldg Permit
15
CSE Insp/Supv is tasked full-time
supervision of project Bldg.
10
12
12
It Engage services of
contractor Flowchart Permit
issued to
Base
Cmdr

13 Clear to
Construct
Constructor
Constructor Design Engr conducts
14
13 periodic inspection

11
Construct 17
Project
TO BE FILLED BY OBO STAFF
BGEN VICENTE M YORDAN
RENOVATION OF PN LIAISON OFFICE
GHQ & HSC, AFP CGEA 143-44-44
P. SANTOS AVE., CGEA, QUEZON CITY

X
Pylon Construction & Consultancy
Engr. Julius A. Magno Jr. 10 Jul 2015 Engr. Daniel Cristobal 17 Mar 2016

X Mangaldan, Pangasinan Quezon City


67751 10 Jul 2016 15776 10 Jul 2017
5525315 9 Jan 2015 99102235 8 Jan 2016
LIAISON
Pangasinan 133-050-987-000 Quezon City 1,000,000
295-634-131-000

Engr. Carlos A. Reyes (CE) LTC ALLAN A GEGARE (CE) PA

20 April 2016 20 Apr 2016


GHQ & HSC, AFP, CGEA, Quezon City GHQ & HSC, AFP, CGEA,
88270 10 Mar 2018 Quezon City

22910972 8 Jan 2016 290182830 10 Jan 2016 Quezon City


16020003 02 2 4 - 2 0 1 6
BGEN VICENTE M YORDAN, AFP
Construction of PN Liaison Office D (Instiutional)
P. Santos Ave. CGEA
Quezon City
TO BE FILLED BY OBO STAFF
BGEN VICENTE M YORDAN
RENOVATION OF PN LIAISON OFFICE
GHQ & HSC, AFP CGEA 143-44-44
P. SANTOS AVE., CGEA, QUEZON CITY

X NCEBDe
COMMO FO GABUDAO JR AFP 10 Jul 2015 LT LO MAGUDANG PN 17 Mar 2016

LIAISON 1,000,000
NSJF, FORT BONIFACIO, TAGUIG CITY NSJF, FORT BONIFACIO, TAGUIG CITY
67751 10 Jul 2016 15776 10 Jul 2017
5525315 9 Jan 2015 99102235 8 Jan 2016
TAGUIG CITY 133-050-987-000 TAGUIG CITY 295-634-131-000

Engr. Carlos A. Reyes (CE) LTC ALLAN A GEGARE (CE) PA

20 April 2016 20 Apr 2016


GHQ & HSC, AFP, CGEA, Quezon City GHQ & HSC, AFP, CGEA,
88270 10 Mar 2018 Quezon City

22910972 8 Jan 2016 290182830 10 Jan 2016 Quezon City


16020003 02 2 4 - 2 0 1 6
BGEN VICENTE M YORDAN, AFP
Construction of PN Liaison Office D (Instiutional)
P. Santos Ave. CGEA
Quezon City
GENERAL HEADQUARTERS TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION
ARMED FORCES OF THE PHILIPPINES
BOX 6
OFFICE OF THE CHIEF ENGINEER
Camp General Emilio Aguinaldo, Quezon City RECEIVED BY DATE

ARCHITECTURAL PERMIT FIVE (5) SETS OF ARCHITECTURAL DOCUMENTS


APPLICATION NO. AP NO BUILDING PERMIT NO. 1. VICINITY MAP/LOCATION PLAN WITHIN A TWO- 8. DETAILS OF RAMPS, PARKING FOR THE DISABLED, STAIRS,
KILOMETER RADIUS FIRE ESCAPES, CABINETS AND PARTITIONS
2. SITE DEVELOPMENT PLAN 9. SCHEDULE OF DOORS AND WINDOWS
BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT) 3. PERSPECTIVE 10. SCHEDULE OF FINISHES FOR FLOORS, CEILINGS AND WALLS
4. FLOOR PLANS 11. ARCHITECTURAL INTERIOR
APPLICANT / BASE COMMANDER) FIRST NAME M.I. LAST NAME 5. ELEVATIONS, AT LEAST FOUR (4) 12. SPECIFICATIONS
6. SECTIONS, AT LEAST TWO (2) 13. COST ESTIMATE
PROJECT 7. CEILING PLANS SHOWING LIGHTING FIXTURES AND 14. OTHERS (Specify)
FORM OF DIFFUSERS _______________________________________________________
OWNERSHIP
ADDRESS: TELEPHONE NO
_______________________________________________________
USE OR
CHARACTER OF OCCUPANCY
BOX 7
LOCATION OF CONSTRUCTION (CONFORME TO APPROVED CAMP DEVELOPMENT PLAN) :
PROGRESS FLOW
SCOPE OF WORK IN OUT
PROCESSED BY:
NEW CONSTRUCTION RENOVATION ________________________ RAISING _______________________________________
DATE TIME DATE TIME
ERECTION CONVERSION ________________________ ACCESSORY BUILDING/STRUCTURE________________
ADDITION REPAIR _____________________________ OTHERS (Specify) ________________________________ ARCHITECTURAL DRAWINGS
ALTERATION MOVING _____________________________ ________________________________________________
SPECIFICATIONS
BOX 2 (TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL)
OTHERS (Specify)
1. ARCHITECTURAL FACILITIES AND OTHER FEATURES PURSUANT TO BATAS PAMBANSA BILANG 344, REQUIRING CERTAIN BUILDINGS, INSTITUTIONS,
ESTABLISHMENTS AND PUBLIC UTILITIES TO INSTALL FACILITIES AND OTHER DEVICES.
STAIRS WASH ROOMS AND TOILETS SWITCHES, CONTROLS, BUZZERS DRINKING FOUNTAINS
WALKWAYS LIFTS/ELEVATORS HANDRAILS PUBLIC TELEPHONES BOX 8
CORRIDORS RAMPS THRESHOLDS SEATING ACCOMMODATIONS ACTION TAKEN:
DOORS, ENTRANCES & THRESHOLDS PARKING AREAS FLOOR FINISHES OTHERS (Specify) __________
PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:
2. PERCENTAGE OF SITE OCCUPANCY 3. CONFORMANCE TO FIRE CODE OF THE PHILIPPINES (P.D. 1185)

PERCENTAGE OF BUILDING FOOTPRINT ______________% NUMBER AND WIDTH OF EXIT DOORS FIRE WALLS OTHERS (Specify) ___________ 1. That under Article 1723 of the Civil Code of the Philippines, the architect (and engineer) who drew up the plans and
PERCENTAGE OF IMPERVIOUS SURFACE AREA _______% WIDTH OF CORRIDORS FIRE FIGHTING AND SAFETY FACILITIES specifications for the building/structure is responsible for damages if within fifteen (15) years from the completion of the
PERCENTAGE OF UNPAVED SURFACE AREA __________% DISTANCE TO FIRE EXITS SMOKE DETECTORS building/structure, the same should collapse due to defect in the plans or specifications or defects in the ground. The
OTHERS (Specify) __________________________________ ACCESS TO PUBLIC STREET EMERGENCY LIGHTS
engineer or architect who supervises the construction shall be solidarily liable with the contractor should the edifice collapse
due to defect in the construction or the use of inferior materials.
BOX 3 BOX 4
DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS FULL-TI ME PROJECT INSPECTOR / PROJECT ENGINEER 2. That the proposed architectural works shall be in accordance with the architectural plans filed with this Office and in
conformity with the latest Architectural Code of the Philippines, the National Building Code and its IRR.
Date____________ Date____________
ARCHITECT PROJECT ENGINEER 3. For implementation of construction by contract the “Notice to Proceed” shall be submitted to the Office of the Building
(Signed and Sealed Over Printed Name) (Signed and Sealed Over Printed Name ) Official together with the Building Permit.
Address Address
IAPOA No. Validity IAPOA No. Validity 4. That upon completion of the construction, as part of TIAC documents, the licensed full-time project inspector / project
PRC No. Validity PRC No. Validity architect of construction works shall submit the entry to the “official project logbook” duly signed and sealed to the Building
PTR. No Date Issued PTR. No Date Issued Official including as-built plans and other documents including, site reports, revision/variation order, minutes of the meetings,
Issued at TIN Issued at TIN etc. and shall also submit a certificate of completion stating that the Architectural Works conform to the provisions of the
BOX 5 National Building Code of the Philippines.
BASE COMMAND STAFF ENGINEER:
RECOMMENDED BY: PERMIT ISSUED BY
(Signature Over Printed Name) :
Date__________________
Address

C.T.C. No. Date Issued Place Issued


______________________________ ___________________________________________
CDR JULIUS A MAGNO JR PN MGEN ARNOLD RAFAEL Y DEPAKAKIBO AFP
Chief, Building Official Division The Building Official, AFP
Date: __________________ Date: _____________________
_______________________
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION
BOX 6

RECEIVED BY: DATE:

FIVE (5) SETS OF CIVIL/STRUCTURAL DOCUMENTS

CIVIL/STRUCTURAL DESIGNS COMPUTATIONS, PLANS AND SPECIFICATIONS COST ESTIMATES

BILL OF MATERIALS OTHERS (Specify) __________________________________

BOX 7

PROGRESS FLOW
IN OUT
PROCESSED BY:
DATE TIME DATE TIME

CIVIL/STRUCTURAL

OTHERS (Specify)

BOX 8
ACTION TAKEN:

PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:

1. That under Article 1723 of the Civil Code of the Philippines, the engineer (or architect) who drew up the plans and
specifications for the building/structure is responsible for damages if within fifteen (15) years from the completion of the
building/structure, the same should collapse due to defect in the plans or specifications or defect sin the ground. The
engineer or architect who supervises the construction shall be solidarily liable with the contractor should the edifice collapse
due to defect in the construction or the use of inferior materials.

2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in
conformity with the latest National Structural Code of the Philippines, the National Building Code and its IRR.

3. For implementation of construction by contract the “Notice to Proceed” shall be submitted to the Office of the Building
Official together with the Building Permit.

4. That upon completion of the construction, as part of TIAC documents, the licensed full-time project inspector / project civil
engineer of construction works shall submit the entry to the “official project logbook” duly signed and sealed to the Building
Official including as-built plans and other documents including tests results (concrete compression test, reinforcing bars
tensile test), weather condition, concrete pouring request, revision/variation order, minutes of the meetings, site reports, etc
and shall also submit a certificate of completion stating that the civil/structural works conform to the provisions of the National
Structural Code of the Philippines and National Building Code of the Philippines.

RECOMMENDED BY: PERMIT ISSUED BY

____________________________ _____________________________________
CDR JULIUS A MAGNO JR PN MGEN ARNOLD RAFAEL Y DEPAKAKIBO AFP
Chief, Building Official Division The Building Official , AFP
Date: __________________ Date: _____________________
TO BE ACCOMPLISHED BY THE PROCESSING & EVALUATION DIVISION

BOX 5
RECEIVED BY: DATE:

FIVE (5) SETS OF ELECTRICAL DOCUMENTS


ELECTRICAL PLANS AND SPECIFICATIONS
EXPECTED DATE OF COMPLETION/INSTALLATION/CONSTRUCTION
SPECIAL FIXTURES AND EQUIPMENT ___________________________________________________________
PROPOSED STARTING DATE OF INSTALLATION/CONSTRUCTION OTHERS (Specify)____________________________________________
___________________________________________________________ ___________________________________________________________

BOX 6

PROGRESS FLOW
IN OUT PROCESSED BY:

DATE TIME DATE TIME


ELECTRICAL ENGINEER
ELECTRICAL (Signature Over Printed name)

PRC Reg. No.:_________________


OTHERS (Specify) Validity:_______________________

BOX 7

ACTION TAKEN:

PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:

1. That the proposed electrical works shall be in accordance with the electrical plans filed with this Office and in conformity with
the provisions of the latest Philippine Electrical Codes, the National Building Code and its IRR.

2. For implementation of construction by contract the “Notice to Proceed” shall be submitted to the Office of the Building Official
together with the Building Permit.

3. That for installed electrical capacity of 200 amperes and above at 230 volts nominal and above, a specialty electrical contractor
duly licensed by the Philippine Contractors Accreditation Board (PCAB) shall be required.

4. That a duly licensed electrical practitioner shall be in-charge of the installation, and that upon completion of the electrical works,
, as part of TIAC documents, he shall submit the entry to the “official project logbook” duly signed and sealed to the OBO
including as-built plans and other documents including revision/variation order, minutes of the meetings, site reports, etc . He
shall also accomplish the Certificate of Completion stating that the electrical works conform to the provisions of the Philippine
Electrical Codes, the National Building Code and its IRR.

5. That a Certificate of Final Electrical Inspection (CFEI) shall be secured prior to the actual occupancy of the building.

6. That this permit shall be posted at the door or site of work.

RECOMMENDED BY:

PERMIT ISSUED BY:


______________________________________
CDR JULIUS A MAGNO JR PN
Chief, Building Official Division
Date: __________________ ________________________________________
MGEN ARNOLD RAFAEL Y DEPAKAKIBO AFP
The Building Official, AFP
Date: _____________________
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION
BOX 6

RECEIVED BY: DATE:

FIVE (5) SETS OF MECHANICAL DOCUMENTS

MECHANICAL PLANS AND SPECIFICATIONS COST ESTIMATES

BILL OF MATERIALS OTHERS (Specify) ____________________________________

BOX 7

PROGRESS FLOW
IN OUT
PROCESSED BY:
DATE TIME DATE TIME

MECHANICAL
OTHERS (Specify)

BOX 8
ACTION TAKEN:

PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:

1. That the proposed mechanical works shall be in accordance with the mechanical plans filed with this Office and in conformity
with the latest Philippine Mechanical Code, the National Building Code and its IRR.

2. For implementation of construction by contract the “Notice to Proceed” shall be submitted to the Office of the Building
Official together with the Building Permit.

3. That upon completion of the mechanical works, as part of TIAC documents, the licensed project mechanical engineer shall
submit the entry to the “official project logbook” duly signed and sealed to the building official including as-built plans and
other documents including revision/variation order, minutes of the meetings, site reports etc. and shall also accomplish the
certificate of completion stating that the mechanical works conform to the provision of the Philippine Mechanical Code, the
National Building Code and its IRR.

4. That a Certificate of Operation shall be issued for the continuous use of mechanical installations.

RECOMMENDED BY:

______________________________________
CDR JULIUS A MAGNO JR PN PERMIT ISSUED BY:
Chief, Building Official Division
Date: __________________ ___________________________________________
MGEN ARNOLD RAFAEL Y DEPAKAKIBO AFP
The Building Official, AFP
Date: _____________________
_______________________
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION

BOX 6

RECEIVED BY: DATE:

FIVE (5) SETS OF SANITARY/P DOCUMENTS

SANITARY PLANS AND SPECIFICATIONS COST ESTIMATES

BILL OF MATERIALS OTHERS (Specify) ______________________________

BOX 7

PROGRESS FLOW
IN OUT
PROCESSED BY
DATE TIME DATE TIME

SANITARY

OTHERS (Specify)

BOX 8
ACTION TAKEN:

PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:

1. That the proposed sanitary works shall be in accordance with the sanitary plans filed with this Office and in conformity
with the latest Code on Sanitation of the Philippines, the National Building Code and its IRR.

2. For implementation of construction by contract the “Notice to Proceed” shall be submitted to the Office of the Building
Official together with the Building Permit.

3. That upon completion of the sanitary works, as part of TIAC documents, the licensed project sanitary engineer shall
submit the entry to the “official project logbook” duly signed and sealed to the Building Official including as-built plans
and other documents including revision/variation order, minutes of the meetings, site reports, etc and shall also
accomplish the Certificate of Completion stating that the sanitary works conform to the provision of the Code on
Sanitation, the National Building Code and its IRR.

4. That this permit is null and void unless accompanied by the building permit.

RECOMMENDED BY: PERMIT ISSUED BY:

______________________________________ ___________________________________________
CDR JULIUS A MAGNO JR PN MGEN ARNOLD RAFAEL Y DEPAKAKIBO AFP
Chief, Building Official Division The Building Official, AFP
Date: __________________ Date: _____________________
_______________________
OBO will process the documents

4 Process

Issue certificate of
Base Cmdr will apply for Occupancy if docs are
3 NBC compliant
Certificate Of Occupancy

1 BO, MSE’s
Application of
Base Cmdr will conduct Final 2
Base
Cmdr CertificateCSE
project Inspection
of Occupancy
5

Flowchart
✓ As Built Plans & Specification (notarized)
Certificate
CONSTRUCTORS/IMPLEMENTING UNIT
of
✓ Construction Engineers Logbook
occupancy
CONSTRUCTORS/IMPLEMENTING UNIT
issued to
✓ Certificate of Final Inspection BCSE/CONSTRUCTORS/IMPLEMENTING
Base Cmdr
UNIT

✓ Chairman, TIAC for Infrastructure Projects Certificate of


BASE COMMND STAFF ENGR/TIAC
Occupancy shall be
✓ Project Completion & Acceptance Reports BCSE/CONSTRUCTORS/IMPLEMENTING posted at the building
UNIT
(discretionary)

✓ Fire Safety Inspection Certificate (if applicable ) MSE(OBO)


BGEN VICENTE M YORDAN
RENOVATION OF PN LIAISON OFFICE
INSTITUTIONAL D
P. SANTOS AVE., CGEA, QUEZON CITY

_____________________________ _______________________________________
CDR JULIUS A MAGNO JR PN MGEN ARNOLD RAFAEL Y DEPAKAKIBO AFP
Chief, Building Official Division The Building Official, AFP
Date: __________________ Date: ______________________________
ORGANIZATIONAL STRUCTURE
OTCE BUILDING
OFFICIAL DIVISION

PROCESSING & EVALUATION BR INSPECTION & ENFORCEMENT BR

LAND USE AND ZONING LAND USE AND ZONING

CIVIL / STRUCTURAL CIVIL / STRUCTURAL

ARCHITECTURAL ARCHITECTURAL

MECHANICAL MECHANICAL

ELECTRICAL ELECTRICAL

SANITARY SANITARY

4/23/2018 AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism 26


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
ORGANIZATIONAL STRUCTURE
OTCE BUILDING
OTCE FILL-UP
OFFICIAL DIVISION

PROCESSING & EVALUATION BR INSPECTION & ENFORCEMENT BR

ENGR. FREDERICK P. DIAZ* ENGR. FREDERICK P. DIAZ*


(Land Use and Zoning) (Land Use and Zoning)

ENGR. GEORGINA G. CABANEROS ENGR. RITO T MABBAGU


(Civil / Structural) (Civil / Structural)

ARCH.RONALD C VER ARCH. FELIMON G GAGALAC


(Architectural) (Architectural)

ENGR. LAURO AGCAOILI* ENGR. LAURO AGCAOILI*


(Mechanical) (Mechanical)

ENGR.CLARO T QUISIL* ENGR.CLARO T QUISIL*


(Electrical) (Electrical)

ENGR. SONIA B AUSTRIA* ENGR. SONIA B AUSTRIA*


(Sanitary) (Sanitary)

4/23/2018 AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism 27


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

Chief, Building Official Division (OTCE)

❖ Assists the TCE as Building Official of the AFP in


ensuring all facilities to be constructed inside military
camp, bases, installations and reservation to conform to
the minimum standard of quality and safety as mandated
by law.

❖ Guarantee AFP’s operational efficiency and


effectiveness through sound and doable structures and
facilities.

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

Chief, Building Official Division (OTCE)

❖ Prevent irregular and authorized conduct of


construction and repair inside military camps, bases,
installations and reservations inconsistent to qualify
structures, sound design and base development planning.

❖To complement the effort of the DPWH in the


implementation of the Code inside military camps, bases,
installations and reservations.

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

Chief, Building Official Division (OTCE)

❖ Shall recommended to TCE for Non-Issuance,


suspension, revocation and/or invalidation of a building
permit or certificate of occupancy; issuance or work
stoppage order, or and order for discontinuance of the use
of occupancy of the building/structure or portion thereof in
cases for non compliant to the National Building Code or a
building/structure is categorizes as hazardous or
dangerous.

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

Chief, Building Official Division (OTCE)

❖ The Building Official (BO) of Major Services and


GHQ shall provide regular status report of projects to the
AFP BO especially GHQ facilitated/ initiated projects. For
other projects initiated/facilitated by Major Service, regular
reporting to AFP BO on the project status shall continue for
purposes of monitoring and record-keeping.

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

CHIEF, Processing and Evaluation Branch (OTCE)

❖ Responsible for the enforcement of the provisions of


the National Building Code and its IRR, this SOP, as well
as Circular, Memoranda, opinions and decisions/orders
issued pursuant thereto, by reviewing and evaluating all
submitted plans that requires for a building permit from
MSE’s (Program 1 - 4)

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

CHIEF, Processing and Evaluation Branch (OTCE)

❖ Monitor and consolidate report of status of the


projects with permit issued by the Building Official of the
Major Services.

❖ Consolidate reports on the status of inventory of all


the existing, on-going, and proposed buildings/structure
activities of the AFP for the information of the CSAFP

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

CHIEF, Inspection and Enforcement Branch (OTCE)

❖ Have over-all administrative control and/or


supervision over all works pertinent to construction
buildings/structures or facilities that secures permit from
the Office of the Building Official.

❖ Ensure that all changes, modifications, and


alterations in the design, plans during the construction
phase shall not start until the modified design plan has
been evaluated and the necessary amendatory permit
issued by Office of the Building Official.

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
DUTIES AND RESPONSIBILITIES (SOP Nr. 34)

CHIEF, Inspection and Enforcement Branch (OTCE)

❖ Undertake annual inspections of all


buildings/structures in coordination with the Real Estate
Office and other stakeholders and keep an up-to-date
record of their status.

AFP CORE OF ENGINEERS: Integrity, Professionalism, Patriotism


AFP CORE OF ENGINEERS Focus Agenda: Building the Foundations for PROFESSIONALISM
THANK YOU!

MABUHAY!!
ORGANIZATIONAL STRUCTURE
O/TNCE BUILDING
OFFICIAL DIVISION

PROCESSING & EVALUATION BR INSPECTION & ENFORCEMENT BR

ENGR. JOEL T. PADUA* ENGR. JOEL T. PADUA*


(Land Use and Zoning) (Land Use and Zoning)

ENGR. NIMFA A. URLANDA ENGR. NIMFA A. URLANDA


(Civil / Structural) (Civil / Structural)

Ms. Maria Christina D. Fuentes* Ms. Maria Christina D. Fuentes *


(Architectural) (Architectural)

ENGR. JAYPEE L. VISPERAS* ENGR. JAYPEE L. VISPERAS*


(Mechanical) (Mechanical)

ENGR. JAYPEE L. VISPERAS* ENGR. JAYPEE L. VISPERAS*


(Electrical) (Electrical)

LT RUFINO B KHO JR PN LT RUFINO B KHO JR PN


(Sanitary) (Sanitary)