** ON A/C ALL
TASK 21-26-00-710-001-A
Operational Check of the Avionics Equipment Ventilation-System via MCDU
B. Referenced Information
REFERENCE DESIGNATION
(Ref. 21-26-00-040-002-A). Deactivation of the Skin Air Outlet Valve in the Closed Position with the
Internal Flap in the Open Position
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External Power
(Ref. 24-41-00-861-002-A-01). Energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-861-002-A-02). Energize the Aircraft Electrical Circuits from Engine 1(2)
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from the External
Power
(Ref. 24-41-00-862-002-A-01). De-energize the Aircraft Electrical Circuits Supplied from the APU
(Ref. 24-41-00-862-002-A-02). De-energize the Aircraft Electrical Circuits Supplied from the Engine
1(2)
(Ref. 31-32-00-860-002-A). Procedure to Get Access to the SYSTEM REPORT/TEST/AIR COND
Page
(Ref. 31-60-00-860-001-A). EIS Start Procedure
(Ref. 31-60-00-860-002-A). EIS Stop Procedure
3. Job Set-up
Subtask 21-26-00-865-050-A
A. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-26-00-861-050-A
C. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) .
NOTE: The energization of the aircraft electrical circuits starts a full test of the ventilation system. The test
continues for 2 minutes approximately.
NOTE: If the outside air temperature is less than 9 deg.C (48.20 deg.F), the skin air-inlet and skin air-
outlet valves are closed.
** ON A/C ALL
4. Procedure
NOTE: If you used the MMEL 21-26-04A, refer to the results related to the deactivation of the skin air-out-
let valve (22HQ) and the skin exchanger isolation-valve (24HQ) (Ref. AMM TASK 21-26-00-040-
002) .
NOTE: If you do this procedure after you apply a MMEL task, make sure that the ECAM alert "VENT
AVNCS SYS FAULT" is cleared.
ACTION RESULT
1.On circuit breaker panels 49VU and 122VU: On the CAPT and F/O glareshield panels 131VU and
· Open circuit breakers 3HQ, 5HQ and 6HQ. 130VU:
· The MASTER CAUT lights come on and you can
hear the single chime.
After approximately 30 seconds:
· You can hear the mechanical call horn in the nose
landing-gear well.
ACTION RESULT
· If the mechanical call horn does not operate, refer
to the related external ground-horn item in the
MMEL.
2.On panel 108VU, push the RESET pushbutton · The mechanical call horn stops.
switch.
3.On circuit breaker panels 49VU and 122VU:
· Close circuit breakers 3HQ, 5HQ and 6HQ. NOTE: The energization of the aircraft electrical cir-
cuits starts a full self-test of the ventilation
system. The test continues for approximately
two minutes.
7.Approximately 20 seconds after the start of the On the PRESS page of the lower ECAM DU:
test, do a check of the positions of the skin air-inlet · The skin air-inlet and skin air-outlet valves are
and skin air-outlet valves. shown as closed.
ACTION RESULT
- The skin-exchanger outlet bypass-valve and
the conditioned-air inlet valve close.
8.Approximately 40 seconds after the start of the On the PRESS page of the lower ECAM DU:
test, do a check of the positions of the skin air-inlet · The skin air-inlet valve is shown as closed.
and skin air-outlet valves. · The skin air-outlet valve is shown as not fully open.
9.More than one minute after the start of the test, do On the PRESS page of the lower ECAM DU:
a check of the positions of the skin air-inlet and skin · The positions of the skin-air inlet and skin air-outlet
air-outlet valves. valves are the same as before the start of the test:
. Closed when the temperature is less than 9
deg.C (48.20 deg.F).
. Open when the temperature is more than or
equal to 12 deg.C (53.60 deg.F).
** ON A/C ALL
5. Close-up
Subtask 21-26-00-860-051-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002) .
Subtask 21-26-00-862-050-A
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .
End of document