1 Scope............................................................ 2
2 Conflicts and Deviations................................ 2
3 Applicable Documents................................... 2
4 Definitions and Abbreviations….................... 4
5 Qualification Procedures............................... 4
6 Field Trials………………………………...…… 5
7 Adding Material Master…………………...….. 5
Attachments
I. Flowchart #1…………………….……….…. 7
II. Flowchart #2.............................................. 8
III. Form-A……………………….....…….…….. 9
1 Scope
This procedure describes the process for qualifying and approving industrial coating
and abrasive blasting products. The procedure does not cover the qualification and
approval of decorative paints.
2.1 Any conflict between this procedure and other applicable Saudi Aramco
Engineering Procedures (SAEPs), Saudi Aramco Engineering Standards
(SAESs), Saudi Aramco Materials System Specifications (SAMSSs), Saudi
Aramco Standard Drawings (SASDs), or industry standards, codes, and forms
shall be resolved in writing through the Manager, Consulting Services
Department of Saudi Aramco, Dhahran.
2.2 Direct all requests to deviate from this procedure in writing in accordance with
SAEP-302 to the Manager, Consulting Services Department of Saudi Aramco,
Dhahran.
2.3 Direct all requests for interpretation of this procedure in writing to the chairman,
Paints and Coatings Standards Committee.
3 Applicable Documents
The requirements contained in the following documents apply to the extent specified in
this procedure.
Page 2 of 9
Document Responsibility: Paints and Coatings Standards Committee SAEP-1200
Issue Date: 4 September 2011 Process Flow Requirements for Qualification Procedures
Next Planned Update: 4 September 2016 of Industrial Coating and Abrasive Blasting Products
Page 3 of 9
Document Responsibility: Paints and Coatings Standards Committee SAEP-1200
Issue Date: 4 September 2011 Process Flow Requirements for Qualification Procedures
Next Planned Update: 4 September 2016 of Industrial Coating and Abrasive Blasting Products
5 Qualification Process
5.1 Prior to starting the qualification process for any industrial coating and abrasive
blasting products, Form-A in Attachment III shall be filled by CSD coating
engineer and shall be reviewed and approved by the Nonmetallic & Protective
Coating Unit Supervisor of Consulting Services Department.
CSD coating engineer shall conduct lab verification tests in the R&DC.
Field trial shall be conducted after successful completion of both the
third party and the R&DC tests.
Page 4 of 9
Document Responsibility: Paints and Coatings Standards Committee SAEP-1200
Issue Date: 4 September 2011 Process Flow Requirements for Qualification Procedures
Next Planned Update: 4 September 2016 of Industrial Coating and Abrasive Blasting Products
6 Field Trials
Field trial is mandatory as a final step for all qualification of new industrial coating and
abrasive blasting products. The minimum field trial duration is one year for coating.
Field trial shall be conducted in coordination with a field partner through an ESA. Any
exception shall be approved by the Manager of Consulting Services Department.
Upon the completion of the qualification process, CSD coating engineer shall
prepare and address a letter to the Mechanical Materials Standardization Unit.
The letter shall be signed by the Nonmetallic & Protective Coating Unit
Supervisor of Consulting Services Department and should include the
followings:
a) Form A (Attachment III)
b) Material Specification Data Sheet
c) Material Safety Data Sheet
d) Third Party Tests Report
e) R&DC Lab Tests Report
f) Field Trial Report
Upon the completion of the qualification process, CSD coating engineer shall
prepare and address a letter to the Mechanical Materials Standardization Unit.
Page 5 of 9
Document Responsibility: Paints and Coatings Standards Committee SAEP-1200
Issue Date: 4 September 2011 Process Flow Requirements for Qualification Procedures
Next Planned Update: 4 September 2016 of Industrial Coating and Abrasive Blasting Products
The letter shall be signed by the Nonmetallic & Protective Coating Unit
Supervisor of Consulting Services Department and should include the
followings:
a) Form A (Attachment III)
b) Form 1149
c) Material Specification Data Sheet
d) Material Safety Data Sheet
e) Third Party Tests Report
f) R&DC Lab Tests Report
g) Field Trial Report
Revision Summary
4 September 2011 New Saudi Aramco Engineering Procedure.
Page 6 of 9
Document Responsibility: Paints and Coatings Standards Committee SAEP-1200
Issue Date: 4 September 2011 Process Flow Requirements for Qualification Procedures
Next Planned Update: 4 September 2016 of Industrial Coating and Abrasive Blasting Products
Attachment I
Flowchart #1
Qualification of Industrial Coating Products
Pass
Pass
Develop SAMSS
Page 7 of 9
Document Responsibility: Paints and Coatings Standards Committee SAEP-1200
Issue Date: 4 September 2011 Process Flow Requirements for Qualification Procedures
Next Planned Update: 4 September 2016 of Industrial Coating and Abrasive Blasting Products
Attachment II
Flowchart#2
Qualification of Abrasive Blasting Products
Pass Reject
Reject
Pass
Conduct Field Trial
Pass
Develop SAMSS
Page 8 of 9
Document Responsibility: Paints and Coatings Standards Committee SAEP-1200
Issue Date: 4 September 2011 Process Flow Requirements for Qualification Procedures
Next Planned Update: 4 September 2016 of Industrial Coating and Abrasive Blasting Products
Attachment III
Form-A: Industrial Coating and Abrasive Blasting Products Qualification Request Form
Request Number
Date
Lead Engineer
Supporting Engineer (1) Supporting Engineer (2)
Product Information
Product Name
Vendor Name
Contact Details
Available Documents
1 Material Specification Data Sheet □ Yes □ No
2 Material Safety Data Sheet (MSDS) □ Yes □ No
3 References of Applications □ Yes □ No
4 3rd Party Lab Tests Report □ Yes □ No
5 Relevant SAMSS
Request Justifications:
Is field trial required? □ Yes □ No (justification and approval of CSD Manager is required)
Justifications
Approval
Did the product pass R&DC lab tests? □ Yes □ No
Did the product pass field trial? □ Yes □ No
Note: The below section shall be completed after the successful completion of the R&DC lab tests & field trial
Do you need to add product to existing 9CAT? □ Yes □ No
Do you need to create new 9CAT? □ Yes □ No
Lead Engineer Signature Support Engineer (1) Signature Support Engineer (2) Signature
Note: For electronic copy of Form-A, please contact the supervisor of NM&PCU or the Paints and Coatings Standards
Committee Chairman.
Page 9 of 9