STQ / FCO No.: PIP/L-205/003


SITE TECHNICAL QUERY ( STQ )
Dated: 19/04/2010
FIELD CHANGE ORDER (FCO )
Origin Ref. : Project Name : Haven Clarification
Discipline : Job No. : L-205 Cost Impact
Department : PIPING / QA Design Proposal
Drawing No. : Sht. No. Rev. No. Structure / Line No. / Item referred to: Other Discipline Affected:
All Piping System
N/A 1 of 1

STQ/FCO TITLE:
All the test package has general Punch List for Valve Tag No. & Color Code. This job should be done
after the Painting complete. That is why at present cannot clear the those Punch list which is related
with Valve Tag & Color Code. As a result Test Package Punch list open Status is very high. Above Issue
DDW like propose to MM, Give One General Punch List for all system and Can be Close all the Test
Package Punch list based on General Punch List.

Please Review & Revert Acceptance.

No. of Documents attached : ( 1 Sheets )


Specs. No. referred to: Prepared by: Checked by: Approved by:
Signature
Schematic Drawing No. Date
General

Recommended action:

FO-QAC-GEN-010 Rev0
Drydocks World Graha

Please attach additional sheets if space not enough.


REPLIED BY APPROVED BY
NAME/SIGNATURE NAME / SIGNATURE
DATE DATE