HAZARD AND OPERABILITY STUDY FOR

VIZAG-SECUNDERABAD LPG PIPELINE


(VSPL)

For

GAIL (INDIA) LIMITED


VISAKHAPATNAM (A.P), INDIA
Prepared By

(Consultancy Division of)


BELL ENGINEERING SOFTWARE TECHNOLOGISTS LTD
PUNE, INDIA
Project No. BEST/ IND / CON / 1380 GAIL Vizag/ ORD 15-16 / 002- 01
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

PROJECT:
HAZOP for Vizag-
Secunderabad
Pipeline-VSPL

COMPANY:
HAZOP Study for
GAIL (INDIA)
Vizag-Secunderabad Pipeline-VSPL of LIMITED
GAIL (INDIA)LIMITED,VISAKHAPATNAM (A.P) VISAKHAPATNAM
(A.P)
CONSULTANT:
Unit :
BELL ENGINEERING
Vizag-Secunderabad Pipeline
SOFTWARE
TECHNOLOGISTS
LIMITED

Prepared By:
Mr. Anwar P. Shaikh REPORT:
HAZOP REPORT No.
BEST/ IND / CON /
1380 GAIL Vizag /
Reviewed By: ORD 15-16 / 002- 01
Mr. Mallikarjun Malgatte

Approved By: © 2008 Bell Engineering


Software Technologists
Mr. C.G.Kulkarni Ltd., Pune, India

This document is the


property of Bell. It shall
not be reproduced in
whole or in part, nor
disclosed to a third party,
without the written
permission of concerned
parties.

Page 2 of 28
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Disclaimer

Bell Engineering Software Technologists Ltd completed this document on the basis of a defined
program of work and terms and conditions agreed with the CLIENT. We confirm that in preparing
this document, we have exercised all reasonable skill and care, taking into account the project
objectives, the agreed scope of work, prevailing site conditions and the degree of manpower and
resources allocated to the project.
Bell Engineering Software Technologists Ltd or any of its subsidiaries / group companies accepts
no responsibility to any parties whatsoever, following the issue of the document, for any matters
arising outside the agreed scope of the work.
This document is issued in confidence to the CLIENT and Bell Engineering Software
Technologists Ltd and has no responsibility to any third parties to whom this document may be
circulated, in part or in full, and any such parties that rely on the contents of the report solely at
their own risk.
GAIL reserves the right to make reference, reproduce and circulate in part or in full; solely at their
own risk. Unless specifically assigned or transferred within the terms of the agreement, Bell
Engineering Software Technologists Ltd asserts and retains all Copyright, and other Intellectual
Property Rights, in and over the Report and its contents.
Any questions or matters arising from this Report should be addressed in the first instance to the
Project Manager.

2
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

CONTENTS
1  EXECUTIVE SUMMARY...........................................................................................4 
1.1  Preamble 4 
1.2  HAZOP Objective 4 
1.3  HAZOP Session 4 
1.4  Recommendations 5 
1.5  INTRODUCTION 8 
1.6  Project Overview 8 
1.7  Objectives 9 
1.8  Scope 9 
1.9  Project Team 10 
2  HAZOP METHODOLOGY.......................................................................................11 
2.1  Overview 11 
2.2  Methodology 11 
2.2.1  Document Review .................................................................................... 11 
2.2.2  HAZOP Worksheet ................................................................................... 13 
3  HAZOP WORKSHOP .............................................................................................15 
3.1  Hazop Nodes 16 
3.2  Hazop Worksheet 17 
4  REFERENCES ......................................................................................................18 
APPENDICES
Appendix A HAZOP Worksheets
Appendix B Abbreviations
Appendix C Node Marked-Up P&IDs
Appendix D Attendance Sheet
LIST OF TABLES
Table 1 – HAZOP Nodes ....................................................................................................... 4 
Table 2 – Units in Scope of Work ......................................................................................... 10 
Table 3 - HAZOP Team Members ........................................................................................ 10 
Table 4 – List of HAZOP team member present for Cherlapalli, Vizag & G Konduru respectively
.................................................................................................................................. 15 
Table 5 - HAZOP Nodes..................................................................................................... 16 
LIST OF FIGURES
Figure 2-1  HAZOP Methodology Schematic........................................................... 13 

3
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

1 EXECUTIVE SUMMARY
1.1 Preamble
GAIL (India) Limited laid approximately 577.9 km long pipeline from Vizag to
Secunderabad for the purpose of transmission of LPG and this pipeline is called Vizag
– Secunderabad LPG Pipeline or VSPL. The pipeline system is designed for a normal
throughput of 1.164 MMTPA and maximum throughput of 1.33 MMTPA with design
pressure of 98 kg/cm².

1.2 HAZOP Objective


a) Intention – The intention defines how the facility under study is expected to operate.
b) Deviation – These are departure from the intention which is discovered by
systematically applying the guide words.
c) Cause – These are the reasons for which deviations might occur.
d) Consequence – These are the results of the deviation should they occur.
e) Safeguard – These are the protections provided and operating instruction or design
review requirement for smooth operation of the system.
f) Recommendation – These are hardware and software changes required for
protecting and smooth operating of the system.

1.3 HAZOP Session


Hazop worksheets were presented and discussed with the team comprising of GAIL
engineers/managers listed here below with respective dates.
Table 1 – HAZOP Nodes represents the nodes which were identified and were discussed in the
HAZOP workshop:
Table 1 – HAZOP Nodes

Node No Node Description


Node: 1 LPG supply from GAIL terminal at HPCL Refinery
Node: 2 LPG hook up from outer Harbor storage facilities
Node: 3 LPG supply from EIPL facility
Node: 4 HPCL feed booster pumps 10-PA-CF-101 A/B operation at Vizag Exim park
EIPL feed booster pump 10-PA-CF-103A/B operation and filtration in basket
Node: 5
filter 10-GN-BK-103 A/B
Node: 6 Booster pump discharge to Main line pump suction at Vizag DT
LPG feed from cavern source filtration at Vizag DT in Basket filter 10-GN-BK-
Node: 7
00-102 A/B
LPG Main line Pumps operation at DT Vizag 10-PA-CF-102 A/B/C to feed to
Node: 8
LPG main line.
Node: 9 Flare system at DT Vizag
Node:10 Diesel storage in 10-TT-CR-102 A/B and usage
Node:11 Intermediate pigging station -1(IP-1) Rajahmundry
Node:12 LPG Supply to HPCL Bottling plant Veeralankapalli
Node:13 Booster Pump operation 30-P-0101 A/B at G Konduru

4
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Node No Node Description


Node 14: LPG supply to HPCL receiving Terminal (TOT/Booster Station, G Konduru)
Node 15: LPG supply to HPCL Receiving Terminal, Kondapalli
Node 16: LPG supply to IOCL Receiving Terminal (TOT/Booster Station, G Konduru)
Node 17: LPG supply to IOCL Receiving Terminal, Kondapalli
Node 18: LPG supply to BPCL Receiving Terminal from IOCL tapping
Node 19: LPG transfer from G-Konduru to Cherlapalli RT
Node 20: LPG supply to HPCL bottling plant from Cherlapalli RT
Node 21: LPG supply to BPCL bottling plant from Cherlapalli RT
Node 22: LPG Supply to IOCL from Cherlapalli RT
Node 23: Fire Hydrant System- Cherlapalli
Pigging Operation
Node 24: Cavern Feeder Line scrapping from HPCL old bottling plant to Vizag DT
Node 25: Main Line scrapping From Vizag to Rajahmundry
Node 26: Main Line scrapping from Rajahmundry to G Konduru
Node 27: Spur Line scrapping from G. Konduru to HPCL Bottling plant
Node 28: Spur Line scrapping from G. Konduru to IOCL Bottling plant
Node 29: Main Line scrapping from G. Konduru to Suryapet
Node 30: Main Line scrapping from Suryapet to Cherlapalli

1.4 Recommendations

Node : 02 LPG hook up from outer Harbor storage facilities

1.1.1.1 P&ID-1128 to be updated

Node : 05 EIPL feed booster pump 10-PA-CF-103A/B operation and filtration in basket filter 10-
GN-BK-103 A/B

1.1.1.1 Gas Detector Adequacy to be checked

Node : 08 LPG Main line Pumps operation at DT Vizag 10-PA-CF-102 A/B/C to feed to LPG main
line

1.1.1.1 Stand by pumps MOV should be closed during normal operation

Node : 09 Flare system at DT Vizag

1.1.1.1 P&ID 5329 to be updated

5
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Node : 10 Diesel storage in 10-TT-CR-102 A/B and usage

1.1.1.1 LI/LG to be provided to diesel storage tank


1.1.1.2 Adequate lights in diesel yard, road to be provided specially keeping in
view of statutory requirement of putting high mast off on Tuesday and
Thursday

Node : 17 LPG supply to IOCL Receiving Terminal, Kondapalli

1.1.1.1 P&ID to be updated for cause & effect ( 1.1.2 PSHH 1501 actually it is
PSHH 1502 ), reducer's standard symbols to be used

Node : 19 LPG transfer from G-Konduru to Cherlapalli RT

1.1.1.1 PG, PT to be provided to the basket filters.

Node : 23 Fire Hydrant System- Cherlapalli

1.1.1.1 P & ID to be updated for PT, TSV

PIGGING OPERATION

Node : 24 Cavern Feeder Line scrapping from HPCL old bottling plant to Vizag DT

1.1.1.1 Provide PG and drain points at appropriate location to depressurize  the   scraper 


receiver and launcher  
1.1.1.2 Provide positive isolation system for scraper receiver and launcher

Node: 25 Main Line scrapping From Vizag to Rajahmundry

1.1.1.1 Provide  PG  and  drain  points  at  appropriate  location  to  depressurize  the  
scraper     receiver and launcher  
1.1.1.2 Provide positive isolation system for scraper receiver and launcher
 
Node :26 Main Line scrapping from Rajahmundry to G Konduru

1.1.1.1 Provide  PG  and  drain  points  at  appropriate  location  to  depressurize  the  
scraper     receiver and launcher  
1.1.1.2 Provide positive isolation system for scraper receiver and launcher  
Node 27: Spur Line scrapping from G. Konduru to HPCL Bottling plant

1.1.1.1 Provide  PG  and  drain  points  at  appropriate  location  to  depressurize  the  
scraper receiver and launcher  
1.1.1.2 Provide positive isolation system for scraper receiver and launcher 

Node 28: Spur Line scrapping from G. Konduru to IOCL Bottling plant

6
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

1.1.1.1 Provide  PG  and  drain  points  at  appropriate  location  to  depressurize  the  
scraper receiver and launcher  
1.1.1.2 Provide positive isolation system for scraper receiver and launcher 

Node 29: Main Line scrapping from G. Konduru to Suryapet


1.1.1.1 Provide  PG  and  drain  points  at  appropriate  location  to  depressurize  the  
scraper receiver and launcher 
1.1.1.2 Provide positive isolation system for scraper receiver and launcher 

Node 30: Main Line scrapping from Suryapet to Cherlapalli


1.1.1.1 Provide  PG  and  drain  points  at  appropriate  location  to  depressurize  the  
scraper receiver and launcher  
1.1.1.2 Provide positive isolation system for scraper receiver and launcher 
 

7
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

ISSUE RECORD

ISSUE DATE REVISION HISTORY

Final 19th February 2016 Final Report

DISTRIBUTION

1. Mr. L.S. Rao – GAIL Vizag.


2. Dr. S. Ramesh– GAIL Vizag.
3. Mr. A. W. Kurhekar – GAIL Cherlapalli.
4. Mr. Pravin Kshirsagar – GAIL G Konduru
1.5 INTRODUCTION
1.6 Project Overview
The entire Vizag Secunderabad LPG Pipeline (VSPL) with an approximate length of
578km is considered as a single system consisting of 3 base stations namely Vizag
(Despatch Terminal), Booster pumping & Pigging Station at G. Konduru (Vijayawada-
TOT) and Cherlapalli (Secunderabad Receiving Terminal). VSPL is equipped with
intermediate pigging stations at Rajahmundry(IP-1) and Suryapet(IP-2) whereas 37
numbers of sectionalizing valve stations are provided on the pipeline, out of which SV-
2, 4, 6, 8, 9, 10, 12, 13, 14, 15, 17, 19, 20, 22, 23, 25, 26, 27, 29, 30, 32, 33, 35 & 36
are provided with remote operated valves and SV-1, 3, 5, 7, 11, 16, 18, 21, 24, 28, 31,
34& 37 are manually operated.
The pipeline system is designed for a normal throughput of 1.164 MMTPA and
maximum throughput of 1.33 MMTPA at a design pressure of 98 kg/cm².
Vizag Despatch terminal is the major coordination centre and master control station for
entire VSPL. However, ROV’s can be operated from other stations i.e. G Konduru and
Cherlapalli also.
LPG is received at Vizag Despatch Terminal from one of the three sources. (1) HPCL’s
Petro-park Terminal, (2) SALPG’s outer harbour storage facility (Cavern) and (3) EIPL’s
storage facility. LPG is delivered to Rajahmundry (HPCL Bottling Plant), Vijayawada
(HPCL, IOCL & BPCL LPG bottling Plants) and Secunderabad (HPCL, IOCL & BPCL
LPG bottling Plants) from the respective receipt/tap-off terminals.
Feeder Sources:
There are 3 feeder sources.(1) HPCL’s Petro park Terminal, (2) SALPG’s outer harbor
storage facility (Cavern) and (3) EIPL’s storage facility.
1. HPCL Petro park terminal: This pipeline extends from HPCL Petro park
terminal to Exim Park (around 5.3 km length). Pipeline is having 12” nominal
bore and MOC is CS. The pipeline is designed for a pressure of 25 kg/cm².
2. EIPL Storage Terminal: This pipeline extends from EIPL Storage terminal to
Exim Park (around 5.0 km length). Pipeline is having 12” nominal bore and
MOC is CS. The pipeline is designed for a pressure of 25 kg/cm².
3. SALPG Outer Harbor (Cavern) Storage facility: This pipeline extends from
SALPG Outer Harbor (Cavern) Storage facility to Exim Park (around 8.0 km
length). Pipeline is having 12” nominal bore and MOC is CS. The pipeline is
designed for a pressure of 49 kg/cm²

8
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Vizag Despatch Terminal: There are 04 numbers of Booster Pumps and 03 mainline
pumps for boosting up the pressure received from the feeder sources and supplied to
the VSPL main pipeline. The major equipment in the terminal include basket filters,
mass flow meters, booster and mainline pumps, Scraper receiver and launchers, PLC,
SCADA system, etc. The operating discharge flow with a single mainline pump is 100
MTPH and with dual pumps is 165 MTPH.

Rajahmundry (IP-01) &Suryapet (IP-02) Intermediate Pigging Stations: In addition


to the main maintenance bases, PIG launching & receiving facilities are provided in
Rajahmundry IPS which is 176.4 km from Vizag and Suryapet IPS which is 112.2 km
from G Konduru.
Rajahmundry HPCL Receiving Terminal: This is located 3.2 km from the
Rajahmundry IP-01 and connected with HPCL LPG Bottling plant. This line is of 4”
common bore diameter from the tapping point at Rajahmundry IPS. The operating flow
is 15-25 MTPH.

G Konduru Booster pumping and Tap off Terminal: This is located 176.6 km from
the Rajahmundry IP-01 and connected with HPCL, IOCL and BPCL LPG bottling
plants. HPCL and BPCL bottling plants are 6.5 km and 7 km away from Vijayawada
receipt terminal. There are two booster pumps of which one is standby. The booster
pump can deliver a maximum flow of 176 m³/hr. The discharge header of the pipeline
from Vijayawada till Cherlapalli is of 10” common bore diameter.

Cherlapalli Receiving Terminal: This is located 122.5 km from the Suryapet IPS and
has HPCL, IOCL & BPCL Bottling Plants connected which receives LPG. HPCL bottling
plant is 0.7 km, IOCL bottling plant is 2.5 km, and BPCL bottling plant is 2.5 km from
the Secunderabad Receipt terminal. All the pipelines going to the bottling plants are of
6” nominal bore and the MOC is CS. The pipeline is designed for a pressure of 98
kg/cm².
1.7 Objectives
The objectives of the HAZOP are to achieve the following:
a) Intention – The intention define how the facility under study is expected to operate.
b) Deviation – These are departure from the intention which is discovered by
systematically applying the guide words.
c) Cause – These are the reasons for which deviations might occur.
d) Consequence – These are the results of the deviation should they occur.
e) Safeguard – These are the protections provided and operating instruction or design
review requirement for smooth operation of the system.
f) Recommendation – These are hardware and software changes required for
protecting and smooth operating of the system.

1.8 Scope
This HAZOP study has been conducted for Vizag, G-Konduru, Cherlapalli Regions pipelines & its
associated facilities. The list of these facilities is as given below.

9
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Table 2 – Units in Scope of Work

Unit No. Unit Name


1. Vizag DT
2. GAIL Terminal: HPCL’s old bottling plant
3. GAIL Terminal: EIPL Storage
4. IP-1

5. G Konduru Booster Station

6. G Konduru - IOCL RT Station

7. G Konduru - BPCL RT Station

8. G Konduru - HPCL RT Station

9. IP-2

10. Cherlapalli RT

11. Cherlapalli - GAIL RT & HPCL

12. Cherlapalli - Receiving Terminal-IOCL

13. Cherlapalli - Receiving Terminal-BPCL

14. Cherlapalli- Fire Water Storage Tanks

1.9 Project Team


Table 3 - HAZOP Team Members lists, the team members who were involved in preparation,
review and quality control of this HAZOP study report
Table 3 - HAZOP Team Members

Sr.No. Name Organization


1. Mr. C.G. Kulkarni Bell Engineering Software Technologists Ltd
2. Mr. M.A. Mujawar Bell Engineering Software Technologists Ltd
3. Mr. Anwar Shaikh Bell Engineering Software Technologists Ltd
4. Mr. Mallikarjun Malgatte Bell Engineering Software Technologists Ltd
5. Mr. Pratap Narayan Bell Engineering Software Technologists Ltd
6. Mr. Bipeen Gadhe Bell Engineering Software Technologists Ltd
7. Mr. Prathamesh Pillay Bell Engineering Software Technologists Ltd

10
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

2 HAZOP METHODOLOGY
2.1 Overview
This section outlines the methodology adopted for the HAZOP study conducted for the project
2.2 Methodology
Being an existing refinery that too one of the oldest refineries the methodology followed was as
under. The methodology so adopted was from the point of view of benefiting from the vast
experience of operating personnel gained over years of running of refinery on one hand and on
the other hand operating constraints.
Therefore the Hazop methodology considered these aspects by detailed briefing from all the
concerned engineers along with conventional HAZOP methodology which is a formal systematic
procedure used to review the design and operation of a potentially hazardous process facility. It
is used to identify deviations from normal safe operation, which could lead, to hazards or
operability problems, and to define any actions necessary to deal with these.
The study is performed by a team of people who are familiar with the plant design and operation,
working under the guidance of a leader who is experienced in use of the HAZOP method.
The method involves several repetitive steps
• Identify a section of plant on the P&I diagram.
• Define the design intent and normal operation conditions of the section.
• Identify a deviation from design intent or operating conditions by applying a system of
guidewords.
• Identify possible causes for, and consequences of, the deviation. A deviation can be
considered meaningful if it has credible cause and can result in harmful consequences.
• For a meaningful deviation, decide what action, if any is necessary.
• Record the discussion and action.
Step 3 to 6 is repeated until all the guidewords have been exhausted and the team is satisfied
that all meaningful deviations have been considered. The team then goes back to step 1 and
repeats the procedure for the next section of the plant.
In the HAZOP method, the guidewords are systematically applied to a segment of process
equipment in order to promote discussion on possible deviations from the design intention. The
guidewords represent deviations to the design intent and their use leads to systematic
highlighting of hazards and operability problems.
2.2.1 Document Review
Before commencement of the HAZOP, the HAZOP Chairman reviewed the project scope and
developed the HAZOP checklist applicable to the project. Document Review is considered an
important part of the HAZOP workshop as it makes the facilitator aware of the various risks
inherent within the activities involved in the project.
Figure 2.1 presents the HAZOP methodology adopted for the study.
The method identifies the causes of a deviation from the design intent by application of the
guidewords. The ultimate consequences are then identified and recorded without reference to
the safeguards, which are in place (examples of safeguards are plant design, control systems,
and procedures). The consequences are then compared with the safeguards and the HAZOP
team then decides whether the current safeguards are adequate. If the team considers them
inadequate, then a recommendation is made to consider or add further safeguards.

11
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

The HAZOP study was based on a set of P&I diagrams for the sections to be covered by study.
The following documents were also referred to during the HAZOP sessions:
• Shut down & trip logic.
• Process description.
• Process Flow Diagrams
• Piping and Instrumentation Diagrams

12
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Describe Design
intention, Operating
Conditions etc.

Consider first or next


guideword or deviation

Identify all causes and


record

Identify all
consequences and
Record

Identify all Safeguards


& record

Agree any action &


record

No
Last
guideword

Yes
Take Next Section

Figure 2-1 HAZOP Methodology Schematic


2.2.2 HAZOP Worksheet
The HAZOP worksheet that was discussed during the HAZOP sessions included the following
details:
• Guideword
• Parameter
• Deviation

13
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

• Causes
• Consequences
• Safeguards
• Recommendations
• Remarks
Guideword
A guideword provides the team with a starting point to identify issues. Using a comprehensive list
of guideword is important to achieve maximum benefit from the HAZOP study. A HAZOP
checklist shall be used to act as an ad-memoir to identify any hazards that may have been over-
looked during the brainstorming session. For each hazard, the root cause, the consequence, any
safeguards already implemented in the design will be identified.
Parameter
Parameter is an aspect of the process that describes it physically, chemically or in terms of what
is happening.
Deviation
Deviation is defined as unreasonable / undesired change in the parameter. Deviation is formed
by a combination of the parameter and guideword.
Cause
For each hazard, the root cause is determined, such that the appropriate safeguards for the
causal events are determined.
Consequence
In assigning a level of consequence to the hazards, the HAZOP team took into consideration the
following factors:
• The present design status of the safeguards and controls
• Physical and working environment conditions
• Levels of training, experience, skills, education etc of the facilities personnel
Safeguards
The study identified the existing design safeguards for each hazard. The types of safeguards
commonly include:
• Preventive safeguards, which aim to prevent the event cause from occurring
• Detective safeguards, which aim to improve the response time to an event
• Protective safeguards, which aim to protect from the escalation consequences and are
always used regardless of whether the event has occurred
• Mitigation safeguards, which aim to reduce the severity of the escalation consequences
and are activated once the event cause and escalation consequences have occurred.
Actions / Recommendations
Where the associated safeguards are not adequate, further recommendations are proposed.

14
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

3 HAZOP WORKSHOP
Hazop worksheets were presented and discussed with the team comprising of GAIL
engineers/managers listed here below alongwith respective dates.
Table 4 – List of HAZOP team member present for Cherlapalli, Vizag & G Konduru respectively

A. List of HAZOP team members for Vizag

Sr.No. Name Designation Dates


1 Mr. Anwar P. Shaikh Chairman, Bell Engineering 15-16/12/15
2 Mr. Prathamesh Pillay Scribe, Bell Engineering 15-16/12/15

3 Mr. Amit Das DGM (LPG P/L O&M) 16/12/15

4 Mr. L S Rao CM (LPG P/L O&M) 15-16/12/15

5 Dr. Ramesh Sambana Sr. Manager (LPG P/L O&M) 15-16/12/15

6 Mr. A Prasada Rao Sr. Manager (LPG P/L O&M) 15-16/12/15

7 Mr. Moulinath Bhattacharyya Sr. Manager ( F&S) 15-16/12/15

8 Mr. Peri Vasu Sr. Manager (LPG P/L O&M) 15-16/12/15

9 Mr. A. S. Reddy Sr. Manager (LPG P/L O&M) 15-16/12/15

10 Mrs. S. Vijaya Lakshmi Dy. Manager(LPG P/L O&M) 15/12/15

11 Mr. G S Rao Sr. Engineer (LPGP/L O&M) 15-16/12/15

B. List of HAZOP team members for G Konduru

Sr.No. Name Designation Dates


1 Mr. Anwar P. Shaikh Chairman, Bell Engineering 17/12/15
2 Mr. Prathamesh Pillay Scribe, Bell Engineering 17/12/15

3 Mr. Kishor Singhal CM (LPG-P/L O&M) 17/12/15

4 Mr. Ratnaji Rao Sr. Manager, (LPG P/L O&M) 17/12/15

5 Mr. A Suresh Babu Sr. Manager (LPG P/L O&M) 17/12/15

6 Mr. Madhusudan T L Sr. Manager (LPGP/L O&M) 17/12/15

7 Mr. Pravin Kshirsagar Manager (F&S) 17/12/15

8 Mr. V Ravindranath Manager (LPGP/L O&M) 17/12/15

9 Mr. Srinivasulu M Manager (LPGP/L O&M) 17/12/15

10 Mr. V Madhusudan Manager (LPGP/L O&M) 17/12/15

11 Mr. P Raj kumar Singh Dy. Manager (LPGP/L O&M) 17/12/15

12 Mr. K S Ramachandran Dy. Manager (LPG P/L O&M) 17/12/15

13 Mr. Phani Kumar Dy. Manager (LPG P/L O&M) 17/12/15

14 Mr. V Sandeep Sr. Engineer (LPG P/L O&M) 17/12/15

15
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

C. List of HAZOP team members for Cherlapalli

Sr.No. Name Designation Dates


1 Mr. Anwar P. Shaikh Chairman, Bell Engineering 14/12/15
2 Mr. Prathamesh Pillay Scribe, Bell Engineering 14/12/15

3 Mr. A Mujumdar CM (LPG P/L O&M) 14/12/15

4 Mr. R Vasanth Kumar CM (LPG P/L O&M) 14/12/15

5 Mr. PBV Prasad Sr. Manager (LPG P/L O&M) 14/12/15

6 Mr. A. W. Kurhekar Sr. Manager (F&S) 14/12/15

7 Mr. Mohsin Jamal Aiyubi Manager (GAILTEL-TC) 14/12/15

8 Mr. V. Vengal Rao Manager (LPG P/L O&M) 14/12/15

9 Mr. P. Giribabu Manager (LPG P/L O&M) 14/12/15

10 Mr. Mallesh C Manager (LPG P/L O&M) 14/12/15

11 Mr. J. Srinivasa Rao Dy. Manager (LPG P/L O&M) 14/12/15

12 Mrs. G Manasa Dy. Manager (LPG P/L O&M) 14/12/15

13 Mr. R Srinivas Tech. (LPG P/L O&M) 14/12/15

3.1 Hazop Nodes


The following nodes presented in Table 5 were identified and discussed during the HAZOP
workshop:
Table 5 - HAZOP Nodes

Node No Node Description


Node: 1 LPG supply from GAIL terminal at HPCL Refinery
LPG supply from Outer Harbour/ Cavern Facility to GAIL terminal at HPCL
Node: 2
refinery
Node: 3 LPG supply from EIPL facility
Node 4: HPCL feed booster pumps 10-PA-CF-101 A/B operation at Vizag Exim park
EIPL feed booster pump 10-PA-CF-103A/B operation and filtration in basket
Node 5:
filter 10-GN-BK-103 A/B
Node 6: Booster pump discharge to Main line pump suction at Vizag DT
LPG feed from cavern source filtration at Vizag DT in Basket filter 10-GN-BK-
Node 7:
00-102 A/B
LPG Main line Pumps operation at DT Vizag 10-PA-CF-102 A/B/C to feed to
Node 8:
LPG main line.
Node 9: Flare system at DT Vizag
Node 10: Diesel storage in 10-TT-CR-102 A/B and usage
Node 11: Intermediate pigging station -1(IP-1) Rajahmundry

16
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Node No Node Description


Node 12: LPG Supply to HPCL Bottling plant Veeralankapalli
Node 13: Booster Pump operation 30-P-0101 A/B at G Konduru
Node 14: LPG supply to HPCL receiving Terminal (TOT/Booster Station, G Konduru)
Node 15: LPG supply to HPCL Receiving Terminal, Kondapalli
Node 16: LPG supply to IOCL Receiving Terminal (TOT/Booster Station, G Konduru)
Node 17: LPG supply to IOCL Receiving Terminal, Kondapalli
Node 18: LPG supply to BPCL Receiving Terminal from IOCL tapping
Node 19: LPG transfer from G-Konduru to Cherlapalli RT
Node 20: LPG supply to HPCL bottling plant from Cherlapalli RT
Node 21: LPG supply to BPCL bottling plant from Cherlapalli RT
Node 22: LPG Supply to IOCL from Cherlapalli RT
Node 23: Fire Hydrant System- Cherlapalli

3.2 Hazop Worksheet


The HAZOP worksheets are presented in Appendix A

17
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

4 REFERENCES
Following Documents were referred for conducting HAZOP proposed for the VSPL-
Pipeline.

PIPING & INSTRUMENTATION DIAGRAMS

SR NO P&ID NO DESCRIPTION REV.NO.

1. 1110 VIZAG DESPATCH TERMINAL AT EXIM PARK 02

2. 1111 VIZAG DESPATCH TERMINAL AT EXIM PARK 02

3. 1112 VIZAG DESPATCH TERMINAL AT EXIM PARK 03

4. 1113 RAJAHMUNDRY-INTERMEDIATE PIGGING STATION 03

5. 1118 TYPICAL SECTIONALZING VALVE STATION 03

6. 1120 VIZAG DESPATCH TERMINAL AT EXIM PARK 02

VIZAG DESPATCH TERMINAL (AT EXIM PARK) 02


7. 1121
DIESEL ENGINE GENERATOR SYSTEM
HOOK UP TERMINAL AT HPCL LPG BOTTLING
8. 1127 01
PLANT AT VIZAG
HOOK UP FOR LPG FROM EXISTING PIPELINE
9. 1128 02
FROM OUTER HARBOUR STORAGE FACILITES

10. 1129 HOOK UP TERMINAL AT EIPL STORAGE AREA 01

11. 1130 ANALYZERS DETAILS 01


STATIONARY METERING PROVING-
12. 1131 02
ARRANGEMENT AT VIZAG

5329-A2- FLARE SYSTEM -


13.
001A

PIPING & INSTRUMENTATION DIAGRAMS

SR NO P&ID NO DESCRIPTION REV.NO.

1 - P&ID-VIJAYWADA PUMPING /PIGGING STATION -

P&ID-VIJAYWADA RECIPT TERMINAL & SPURLINE FOR -


2 -
IOCL

- P&ID-VIJAYWADA RECIPT TERMINAL & SPURLINE FOR -


3
BPCL
P&ID-VIJAYWADA RECIPT TERMINAL & SPURLINE FOR -
4 -
HPCL

18
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

PIPING & INSTRUMENTATION DIAGRAMS

SR NO P&ID NO DESCRIPTION REV.NO.

P&ID-SURYAPET-INTERMEDIATE 04
1 1116
PIGGING STATION(IP-2)
P&ID-SECUNDERABAD RT-FOR 07
2 1117
HPCL

1125 P&ID- SECUNDERABAD RT-FOR 07


3
IOCL
P&ID- SECUNDERABAD RT-FOR 04
4 1126
BPCL
P&ID- SECUNDERABAD RT-FOR 07
5 1075
FIRE WATER NETWORK

PROCESS FLOW DIAGRAMS


PF
SR.N REV.N
D DESCRIPTION
O O
NO
1 - OVER ALL VSPL PIPELINE NETWORK -

2 - VIZAG TO IP-1(RAJAHMUNDRY) SECTION -


HPCL BOTTLING PLANT & HPCL PETRO PARK TO VIZAG DT
3 - -
SECTION

4 - VIZAG TO IP-1(RAJAHMUNDRY) SECTION -

5 - IP-1 (RAJAHMUNDRY) TO HPCL RAJAHMUNDRY SECTION -

6 - IP-1 (RAJAHMUNDRY) TO VIJAYWADA SECTION -

7 - VIJAYWADA TOT TO VIJAYWADA CUSTOMERS -

8 - VIJAYWADA TOT TO SECUNDERABAD SECTION -

9 - SECUNDERABAD RECEIVING TERMINAL -

10 - VIZAG TO RAJAHMUNDRY SECTION -

11 - RAJAHMUNDRY TO VIJAYWADA SECTION -

12 - VIJAYWADA TO SURAPET SECTION -

13 - SURYAPET TO SECUNDERABAD SECTION -

PROCESS DOCUMENTS
SN DOCUMENT NAME DOCUMENT/ DRAWING NO. REV NO.
1 Design Philosophy 2139 0

2 ESD philosophy and Isolation philosophy 2139 0

3 Pump operation & control philosophy 2139 0

4 BRIEF PROCESS DESCRIPTION-VSLP - 03

19
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

20
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad LPG Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Final Rev. C
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

APPENDIX A – HAZOP Worksheets

21
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Vizag Region

Page 1 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 1 HPCL pump at LPG bottling plant


 
Node Description: LPG supply from GAIL terminal at HPCL Refinery

P&ID No: 1127

Type : MOV, Piping and piping components

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More flow from HPCL  1.1 More LPG will flow  1.1.1 PT 2701/02 is provided         
1.1.2 TSV 2702/03 is provided 
1.1.3 SCADA System is provided 
1.1.4 FT 2701 is provided 
 
 
 
 
 
 
 
 
 

Page 2 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 MOV 2703 stuck  1.1 Less LPG will supply  1.1.1 PT 2701/02 is provided         
close  1.1.2 SCADA system is Provided 
• No LPG supply   1.1.3 FT 2701 is provided  
• Pipe line leak   1.1.4 GA 2701 is provided 
 
 
Guideword : Reverse Parameter : Pressure

Deviation : Reverse Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to More  1.1 LPG will flow in reverse  1.1.1 SCADA System is Provided       
downstream  direction  1.1.2 NRV is provided on supply pump 
pressure,  discharge 
• LPG supply pump 
trips 
 
 
 
 
 
 
 
 
 

Page 3 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to More  1.1 HSE hazard  1.1.1 Round the clock person available       
pressure,  1.1.2 SCADA System is Provided 
• Corrosion  1.1.3 Fire extinguishers are provided 
• Gasket leak  1.1.4 Thickness testing carried out at 
• Vibration   defined frequency 
1.1.5 External painting at defined 
frequency 
This report is generated using HAZOP‐Pro software  

Page 4 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 02 Outer Harbor Storage Facilities


 
Node Description: LPG hook up from outer Harbor storage facilities

P&ID No: 1128

Type : MOV, piping and piping components

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More flow from source   1.1 More LPG will flow  1.1.1 PI 2802/04 are provided  1.1.1.1 P&ID‐1128 to be    
1.1.2 PT 2801/02 are  provided  updated 
1.1.3 SCADA system 
1.1.4 TSV 2802/03 are  provided 
 
 
 
 
 
 
 
 
 
 

Page 5 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less flow of LPG  1.1 Less pressure LPG  1.1.1 PI 2802/04 are provided       
from upstream  supply, Fire  1.1.2 PT 2801/02 are  provided 
• MOV 2801 stuck  1.1.3 SCADA system 
close  1.1.4 Round the clock monitoring 
• No LPG supply  
• Pipe line leak  

Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 If feed pump trips   1.1 LPG will flow in reverse  1.1.1 NRV is provided on pump         
direction  discharge 
1.1.2 PT 2801/02 are  provided 
1.1.3 SCADA system is provided  
This report is generated using HAZOP‐Pro software  

Page 6 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 03 EIPL Pump PU-203/04


 
Node Description: LPG supply from EIPL facility

P&ID No: 1129

Type : MOV, Piping and piping components

Guideword : More Parameter : Flow

Deviation : More Flow


       
Causes Consequences Safeguards Recommendations Remarks
• More flow from  More LPG will flow  1.1.1 PT 2901 is Provided 
upstream  1.1.2 PI 2901 is provided 
• MOV 2901 stuck  1.1.3 TI 2901 is provided 
open  1.1.4  TT 2901 is provided       
         
 
 
 
 
 
 
 
 

Page 7 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Flow

Deviation : Less Flow

Causes Consequences Safeguards Recommendations Remarks


• Less flow of LPG  1.1 Less pressure LPG will  1.1.1 PT 2901 is provided 
from upstream   flow  1.1.2 PI 2901 is provided 
• MOV 2901 stuck  1.1.3  SCADA System is provided 
close       

Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 If feed pressure  1.1 LPG will flow in reverse  1.1.1 NRV is provided on pump       
decreases  direction  discharge 
1.1.2 PT 2901 is provided 

This report is generated using HAZOP‐Pro software  

Page 8 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 4 Vizag Despatch Terminal at Exim Park


 
Node Description: HPCL feed booster pumps 10-PA-CF-101 A/B operation at Vizag Exim park

P&ID No: 1120

Type : Piping and piping components, MOV, Flow Metering ,Booster pump

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More flow of LPG  1.1 More LPG will flow,  1.1.1 PT 2002 is provided         
from upstream   Pump will trip on over load  1.1.2 FT 2001 is provided with an alarm 
• Two or more  current; process upset  1.1.3TSV 2002/05 is provided 
pumps running at a  1.1.4 PI 2003 PAH is Provided 
time   
1.1.5 SCADA System is Provided 
• VSD Mal function 
1.1.6 Pump reset provision is provided 
 
 
 
 
 
 
 

Page 9 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less/ No flow LPG  1.1 Less  LPG will flow‐ 1.1.1 PT 2002 is provided         
from upstream  process upset, Pump dry  1.1.2 FT 2001 is provided 
•  PV 2001 stuck  run   1.1.3 Pump running indicators are 
close  provided 
• Filter choke   1.1.4 PI 1562/63  Provided 
• Booster pump trip  1.1.5 SCADA System is Provided 
•  No LPG supply 
1.1.6 PSLL will trip pumps  
1.1.7  Low flow alarm provided in 
control room 

Guideword : Reverse Parameter : Flow

Deviation : flow Reverse


 
Causes Consequences Safeguards Recommendations Remarks
1 IF booster pump trips,  1.1 LPG will flow in reverse  1.1.1 NRV is provided         
NRV fail  direction, LPG will flow  1.1.2 Isolation valves is provided 
towards other source,  1.1.3 SCADA System is Provided 
Booster pump rotates in 
1.1.4 Pump tripping alarm is provided 
reverse direction 

         
 
 

Page 10 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Parameter : Leak

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to more  1.1 HSE Hazard  1.1.1 SCADA System is Provided       
pressure  1.1.2 Round the clock persons are 
• Corrosion  available 
• Gasket failure   1.1.3 GA 2001 to 04 are provided 
• Mechanical   1.1.4 Fire fighting system is provided 
• Vibration  1.1.5 Deluge system provided 
• Pump seal failure  1.1.6 Low pressure will trip MOVs and 
pumps  
1.1.7 Corrosion coupons are provided  
1.1.8 Periodic thickness testing carried 
out at defined frequency 

Deviation : More Temperature


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to  1.1 LPG leak  1.1.1 TE 2001/02/05 are provided       
atmospheric  1.1.2 TSV 2001 to 06 are provided 
condition  1.1.3 GA 2001 to 04 are provided 
• Heat source  1.1.4 Fire fighting system is provided 
1.1.5 Round the clock vigilance 
1.1.6 CCTV is provided  

Page 11 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 05 EIPL Storage to Vizag


 
Node Description: EIPL feed booster pump 10-PA-CF-103A/B operation and filtration in basket filter 10-GN-BK-103 A/B

P&ID No: 1110

Type : Piping and piping components, MOV, Pump, Filter

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 MOV‐1003 stuck  1.1 More LPG will flow to  1.1.1 FT‐1002 is provided       
open will lead to  Vizag  1.1.2 PSH‐1001 will stop booster pump 
Booster Pump  & close MOV‐1001 
Malfunctioning,   1.1.3 PT‐1002/03/05/06 are provided 
• VSD not working 
1.1.4 TSV 1003/04 are provided 
         
 
 
 
 
 
 
 

Page 12 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1  MOV‐1002 stuck  1.1 Less LPG will flow to  1.1.1 PAL‐1001 A/B will stop Booster         
close   Vizag  Pump  
• Strainer choke  1.1.2 PI‐1011 is provided 
• VSD mal  1.1.3 Pump running indicators are 
functioning and  provided 
pump trips  1.1.4 PT‐1002/03/05/06 are provided 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1 More pressure  1.1 HSE Hazard  1.1.1 SCADA System is Provided  1.1.1.1 Gas Detector    
from upstream  1.1.2 Gas Detector is Provided  adequacy to be checked 
• Gasket leak 
1.1.3 Fire fighting system is Provided 
• Pump seal leak 

Deviation : More Temperature


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to  1.1 LPG Leak  1.1.1 SCADA System Monitoring         
atmospheric heat,   1.1.2 TE‐1001/03 are provided 
• Hot LPG received  1.1.3 GA is provided 
from EIPL Storage  

This report is generated using HAZOP‐Pro software  

Page 13 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 06 LPG receipt at Main pump station


 
Node Description: Booster pump discharge to Main line pump suction at Vizag DT

P&ID No: 1120,1131

Type : Piping and piping components, HOV, stationary metering assembly

Guideword : More Parameter : Flow


Deviation : More Flow
 
Causes Consequences Safeguards Recommendations Remarks
1 PV 2001 mal functioning  1.1 More LPG will flow ,  1.1.1  PAH 2006 is provided       
Main line Pump will trip on  1.1.2 SCADA System is provided 
high pressure  1.1.3 FT 2001/02 is provided    
1.1.4 PT 2006 is provided 

 
 
 
 
 
 
 
 
 
 

Page 14 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less/ No LPG flow  1.1 Less LPG will flow to the  1.1.1 PT 2006 is provided         
from upstream   station  1.1.2 PV 2001 is cascaded with PT 2006 
• PV 2001 stuck  1.1.3 If Booster pump trips it will trip 
close,   main line pumps  
• Booster pump 
1.1.4 FT 2001/02 is provided    
trips,  
1.1.5 PSLL will trip pumps  
• No LPG supply 
from source  1.1.6  Low flow alarm provided in 
control room 
1.1.7 GA 2001 to 04 are provided 

Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to low  1.1 LPG will flow in reverse  1.1.1 NRV is provided on booster pump         
pressure in header,   direction  1.1.2 PT 2006 is provided 
• Booster pump trips  1.1.3 Pump running indicators are 
provided 

This report is generated using HAZOP‐Pro software  

Page 15 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 07 Vizag DT at Exim Park


 
Node Description: LPG feed from cavern source filtration at Vizag DT in Basket filter 10-GN-BK-00-102 A/B

P&ID No: 1111


       
Type : Piping and piping components, MOV, Filter

Guideword : More Parameter : Pressure

Deviation : More Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 More pressure from  1.1 More pressure LPG will  1.1.1 FT 1101/02 are provided         
source ( CAVERN )  be delivered to DT‐Vizag  1.1.2 PT 1102/05 are provided 
1.1.3 SCADA system is provided  
1.1.4 TSV 1101 to 06 are provided 

 
 
 
 
 
 
 
 

Page 16 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Pressure

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less LPG supply  1.1 Less pressure of LPG  1.1.1 PSLL 1201 will trip both main line         
from source (  supply  pumps, booster pumps and suction 
CAVERN)   discharge MOV of all pumps will be 
• Filter choke  close 
• Leak   1.1.2  PT 1102/05 are provided 
1.1.3 FT 1101/02 are provided 
1.1.4 Gas detector 1101/02 are 
provided 

Guideword : Reverse Parameter : Pressure

Deviation : Reverse Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 High pressure at  1.1 LPG will flow in reverse  1.1.1 SCADA system is provided         
downstream  direction  1.1.2 NRV provided on main pump 
• Main  pump trips  discharge line  
1.1.3 PT 1102/05 are provided 

 
 
 
 
 
Deviation : Leak

Page 17 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to pressure,  1.1 HSE hazard  1.1.1 SCADA system is provided         
gasket failure  1.1.2 Round the clock monitoring  
• Mechanical  1.1.3 Communication system available 
vibration 

This report is generated using HAZOP‐Pro software  

Page 18 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 08 Vizag DT Main Pump


 
Node Description: LPG Main line Pumps operation at DT Vizag 10-PA-CF-102 A/B/C to feed to LPG main line.

P&ID No: 1112

Type : Piping and piping components, MOV, Pump

Guideword : More Parameter : Pressure

Deviation : More Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More pressure  1.1 More LPG Flow ,  1.1.1 PSHH Main line pump trips 102‐      
from upstream   process upset  A/B/C  
• MOV 1202 stuck  1.1.2 PSHH 1202 will close MOV 
open  1201/02 
• Two pumps  1.1.3 PI 1201/04/05/06 are provided 
running,    1.1.4 SCADA system is Provided 
1.1.5 FT 1201 is provided 
1.1.6 TSV 1201/02/05 are provided 
         
 
 
 
 

Page 19 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Pressure

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More pressure  1.1 Less LPG Flow ; process  1.1.1 PSLL 1201 A/B  will trip the main         
from upstream   upset  line pump 
• MOV 1202 stuck  1.1.2 PSLL 1201 A/B will close MOV 
close  0201/02 
• Filter choke  1.1.3 PI 1201/04/05/06 are provided 
• Less supply from  1.1.4 SCADA system is Provided 
source  
1.1.5 FT 1201 is provided 
1.1.6 DPT 1202 is provided and 
generates an alarms 
1.1.7 Minimum suction pressure 
tripping provided 
         
Guideword : Reverse Parameter : Flow

Deviation : Reverse Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• No LPG Supply   1.1 LPG will flow in Reverse  1.1.1 SCADA system is Provided  1.1.1.1 Stand by pumps    
• Feed pump trips   direction, NRV of stand by  1.1.2 NRV provided on main pump  MOV should be closed 
pump fails   discharge pipe line  during normal operation 
1.1.3 PI 1201/04/05/06 are provided 
1.1.4 Pump running indicators are 
provided 

Page 20 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Leak due to more  1.1 EHS hazard  1.1.1 Deluge system is provided       
pressure,   1.1.2 Round the clock monitoring 
• Flange leak,   1.1.3 Gas detectors are provided 
• Mechanical  1.1.4 Fire fighting system is provided 
vibration,  
1.1.5 SCADA System is provided 
• Pump seal leak 
1.1.6 Emergency push button is 
provided 

Deviation : More Temperature


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to  1.1 HSE Hazard; leak  1.1.1 TSV 1201 /03/06/09/10/11 are       
atmospheric  provided 
changes  1.1.2 SCADA system is Provided 
• Heat source  1.1.3 TE 1201/02 is provided 

This report is generated using HAZOP‐Pro software  

Page 21 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 09 Flare system


 
Node Description: Flare system at DT Vizag

P&ID No: 5329

Type : Piping and piping components, PRV, David Assembly, flare system

Guideword : More Parameter : Flow of LPG

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More Flow of LPG  1.1 More LPG at the tip of  1.1.1 PG is provided  1.1.1.1 P&ID 5329 to be    
from upstream   burner and more heat  1.1.2 TG is Provided  updated  
• More LPG vented  radiation  1.1.3 CCTV is provided  
from TSV   1.1.4 Round the clock vigilance  
• Line venting, 
1.1.5 Flame arrestor is provided  
blowdown  
• Process line/  1.1.6 NRV provided on 4" line  
equipment  1.1.7 Restricted orifice after the block 
emergency  valve & before the globe valve  
evacuation    1.1.8 Fire fighting, Water monitor are 
provided  
         

Page 22 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Leak from  pipe  1.1 EHS hazard  1.1.1 Physical check         
• Fittings,    1.1.2 Round the clock monitoring 
• Pipe lines,   1.1.3 Fire fighting system is provided 
• Flange 
         

Deviation : More Temperature around flare system


 
Causes Consequences Safeguards Recommendations Remarks
 1 Due to flare   1.1 Hot atmospheric  1.1.1 Fire fighting system is Provided       
condition and HSE hazard 
         
Deviation : Ignition system failure
       
Causes Consequences Safeguards Recommendations Remarks
Due to technical reason  LPG cloud will form‐HSE  1.1.1 Manual ignition system is       
ignition system fails  hazard  provided 
 
This report is generated using HAZOP‐Pro software  

Page 23 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report 

Node : 10 Vizag Diesel storage 

Node Description: Diesel storage in 10‐TT‐CR‐102 A/B and usage 

P&ID No: 1121 

Type : Tank, Pump

Guideword : More Parameter : Flow


Deviation : More Flow
 
Causes Consequences Safeguards Recommendations Remarks
1 Mal Functioning of diesel  1.1 More diesel transfer  1.1.1 LT 2102 is provided  1.1.1.1 LI/LG to be provided    
transfer pump  from storage tank to day  to diesel storage tank 
tank  1.1.2 SCADA System is Provided  1.1.1.2 Adequate  lights   in 
1.1.3 LAL 2102 is provided  diesel yard, road to be 
1.1.4 Physical stock checking  provided  specially keeping 
in view of statutory 
requirement of putting 
high mast off on Tuesday 
and Thursday 

Page 24 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Low/No diesel in  1.1 Low diesel in day tank  1.1.1 Physical stock taken on regular       
tank  basis 
• Pipe line choke  1.1.2 LT 2102 is provided 
• Pump trips 
• Valve close 

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 Diesel transfer pump trips  1.1 Diesel will flow in  1.1.1 LT 2102 is provided         
reverse direction  1.1.2 NRV is provided 

Page 25 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Deviation : Spillage
 
Causes Consequences Safeguards Recommendations Remarks
• Diesel tank  1.1 Diesel spillage, leak  1.1.1 LT 2102 is provided       
overflow   1.1.2 Dyke wall is provided 
• Drain valve open  
• LT line leak 
• LT mal functioning  
• Flange leak 

This report is generated using HAZOP‐Pro software  

Page 26 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 11 LPG Transfer from Vizag to G Konduru


 
Node Description: Intermediate pigging station -1(IP-1) Rajahmundry

P&ID No: 1113

Type : Piping and piping components, MOV, Flow Metering , Filter

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More flow of LPG   1.1 More LPG will flow;  1.1.1 TSV 1302/1308 is provided          
from upstream   process upset   1.1.2 FT 1301 is cascaded with PT 1303 
•  MOV 1303  stuck  1.1.3 PT 1303 is Provided 
open  1.1.4 FT 1301 is provided  
• Booster pump mal 
1.1.5 High flow alarm is provided 
functioning 
• Downstream  1.1.6 High current trip is Provided 
pressure  low 
• VSD Mal function 
 
 
 
 

Page 27 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
 
 
 
Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less/no flow of  1.1 Less LPG will flow‐ 1.1.1 FT 1301 is cascaded with PT 1303         
LPG  from  process upset  1.1.2 PT 1303 is Provided 
upstream   1.1.3 SCADA System is provided 
• MOV 1303   stuck  1.1.4 PI 1306 is provided 
close  
1.1.5 GA 1303 is provided 
• Leakage in pipe 
line,   1.1.6 DPT 1301/02 is provided 
• No supply from 
source 
•  filter choke 
         
Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 If supply pressure is low  1.1 LPG will flow in reverse  1.1.1 PT 1303 is Provided       
direction   1.1.2 SCADA System is Provided 

Page 28 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 12 HPCL Receiving terminal


 
Node Description: LPG Supply to HPCL Bottling plant Veeralankapalli

P&ID No: 1001

Type : Piping and piping components, Filter, FT, MOV, ROV

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More Flow of LPG  1.1 More LPG flow   1.1.1 PT 0201/04/05/06 are provided       
from upstream    1.1.2 TSV 0201/03/05/06/08/09/10/11 
• PCV 0204 stuck  are provided 
open,   1.1.3 SCADA system is Provided 
• More pressure LPG 
1.1.4 FT 0201 provided is Provided 
supply from DT‐
Vizag ,   
         
         
 
 
 
 
 

Page 29 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less Flow of LPG  1.1 Less/No  LPG supply to  1.1.1 PT 0201/04/05/06 is provided       
from upstream   the system   1.1.2 FT 0201 is provided 
• PCV 0204 stuck  1.1.3 SCADA system is Provided 
close,  
• Less pressure LPG 
supply from DT‐
Vizag ,   

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, fittings  1.1 EHS hazard  1.1.1 Gas detectors are provided         
, drain points ,   1.1.2 Round the clock monitoring 
1.1.3 Fire fighting system is provided 
1.1.4 Deluge system is provided  
 
 
 
 
 
 
 
 

Page 30 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Deviation : More Temperature
 
Causes Consequences Safeguards Recommendations Remarks
 1 Due to atmospheric  1.1 HSE Hazard  1.1.1 TSV 0201/03/05/06/08/09/10/11         
condition; heat source   are provided 
1.1.2 Gas detectors are provided 
1.1.3 Fire fighting system is provided 
1.1.4 TE 0201 to 04 are provided 
 

Page 31 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

G Konduru Region

Page 32 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 13 Booster Pump 30-P-0101 A/B


 
Node Description: Booster Pump operation 30-P-0101 A/B at G Konduru

P&ID No: 03122009-Booster pump

Type : MOV, Filter, Piping and piping components, Gas Detector

Guideword : More Parameter : Pressure

Deviation : More Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 More Pressure from Vizag  1.1 More pressure LPG will  1.1.1 FT 1401 is provided         
leading to  VSD  & Pump  flow towards Suryapet,  1.1.2  PT 1407 is provided 
control mal function  Pump will trip on high  1.1.3  PSH 0101/02 will trip P‐0101 A/B, 
towards high speed  current   close MOV 0101/02 & 03/04 
respectively  
1.1.4  PAH 0103 will stop Booster pump 
1.1.5 PAHH 0101/02/03, 2 out of 3 
logic will trip 0101 A/B  
 
 
 
 

Page 33 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1. Less pressure  of  1.1 Less/No LPG  supply to  1.1.1 FT 1401 is provided         
LPG from upstream   Suryapet due to P 0101 A/B  1.1.2 PSL 0101/02 will trip P‐0101 A/B, 
• 30‐GN‐BK‐101 A/B  will trip on low pressure    close MOV 0101/02 & 03/04 
choke, less   respectively  
• LPG supply from  1.1.3 Minimum flow line from pump is 
Vizag   provided ( Balancing line ) 
• Pump control mal 
1.1.4 PT 0101/03/04 ,1401/02/07  are 
function towards 
provided 
low  speed 
1.1.5 DPT 1401/02 is provided  
         

Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 Booster pump trips  1.1 LPG will flow in reverse  1.1.1 NRV is provided on P‐0101 A/B         
direction  pump discharge line  
1.1.2 FT 1401 is provided 
1.1.3 PT 0101/03/04 ,1401/02/07  are 
provided 
 
 
 
 
 

Page 34 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1. More pressure  1.1 Fire, HSE issues  1.1.1 GA 1402 is provided       
from upstream  1.1.2 Thickness testing at defined 
• Mechanical  frequency  
vibration  1.1.3 External painting , poly ethylene 
• Pump seal and  coating done  
valves leak  
1.1.4 Corrosion coupon are provided 
1.1.5 ER Probe is Provided 
1.1.6 Gas element is provided  
1.1.7 Deluge system, fire hydrant 
system are Provided 
 
This report is generated using HAZOP‐Pro software  

Page 35 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 14 HPCL LPG system


 
Node Description: LPG supply to HPCL bottling plant from G Konduru Pumping Station

P&ID No: HPCL

Type : Piping and piping components, MOV

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1. More Flow of LPG from  1.1 More LPG will flow  1.1.1 FT 1902 is Provided         
Vizag  leading to more pressure of  1.1.2 TSV 1901/02/03/05  are Provided  
LPG to HPCL Process upset  
1.1.3 PT 1901/02/03/04  are Provided 
1.1.4 PSHH 1901 will close MOV 
1901/02/04/06  & ROV 1901   
1.1.5 SCADA system is provided 
 
 
 
 
 
 
 

Page 36 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Pressure

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Low pressure LPG from  1.1 Low LPG pressure will  1.1.2 FT 1902 is Provided         
Vizag  lead to dual phase, FT will  1.1.2 SCADA system is provided 
mal function, Process upset 
1.1.3 PSLL 1901   will close MOV 
1901/02/04 ROV 1901 
1.1.4 PSLL will close PV 1901 
 
This report is generated using HAZOP‐Pro software  

Page 37 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 15 HPCL LPG Bottling plant


 
Node Description: LPG supply to HPCL bottling plant after filtration in Basket filter 31-GN-BK-101

P&ID No: HPCL

Type : Piping and piping components, MOV

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow from Tap off  1.1 More LPG will flow‐  1.1.1 FT 1903 is provided          
station  Process upset  1.1.2 PSHH 1901 will close MOV 
1901/02/04/06 & ROV 1901 
1.1.3 PT 1905 is provided 
1.1.4 SCADA system is Provided 
1.1.5 TSV 1906/09/11 are provided 
 
 
 
 
 
 
 

Page 38 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less/no Flow of  1.1 Less LPG will flow;  1.1.1 FT 1903 is provided          
LPG from upstream  Process upset  1.1.2 SCADA system is Provided 
• ROV 1901  stuck  1.1.3 PT 1905 is provided 
close  1.1.4 SCADA system is provided 
•  Filter choke  
1.1.5 DPG is provided for filter 
• Leak  
 
This report is generated using HAZOP‐Pro software  

Page 39 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 16 SPUR Line IOCL

Node Description: LPG supply to IOCL bottling plant from G Konduru Pumping Station

P&ID No: IOCL Spur line

Type : Piping and piping components, MOV, PCV ,FCV

Guideword : More Parameter : Flow

Deviation : More Flow


  
Causes Consequences Safeguards Recommendations Remarks
• 1 More Flow of LPG  1.1 More LPG will flow  1.1.1 FT 1502 is Provided 
from upstream   leading to more pressure of  1.1.2 TSV 1501/02/03/04/05 are 
• FV 1501 stuck open   LPG to IOCL Process upset   Provided  
1.1.3 PT 1501/02/04/06  are Provided 
1.1.4 PSHH will close MOV 1501/02,PV  
1501 will close 
1.1.5 SCADA system is provided         
 
 
 
 
 
 

Page 40 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Guideword : Low Parameter : Pressure

Deviation : Low Pressure


  
Causes Consequences Safeguards Recommendations Remarks
• 1 Low  Pressure of  1.1 Low LPG pressure will  1.1.1 FT 1502 is Provided 
LPG  from  lead to dual phase, FT will  1.1.2 SCADA system is Provided 
upstream  mal function‐ Process upset 
1.1.3 PSLL  will close MOV 1501/02 
• 1501 stuck close  
• No/Low LPG supply 
from Vizag  1.1.4 PSLL will close PV 1501         

Guideword : Leak Parameter : Leak

Deviation : Leak
  
Causes Consequences Safeguards Recommendations Remarks
• 1 Corrosion   1.1 HSE Hazard ,Fire    1.1.1 Thickness testing at defined         
• Mechanical   frequency  
Vibration   1.1.2 External painting , coating done 
• Gasket leak  
1.1.3 Corrosion coupon is provided 
• Pipeline leak   
1.1.4 ER Probe is provided 
1.1.5 Gas element provided  
1.1.6 Deluge system, fire hydrant 
system are provided 
1.1.7 QBD detection system is provided 
1.1.8 Earthing &  bonding provided  

Page 41 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 17 LPG SPUR Line IOCL


 
Node Description: LPG supply to IOCL bottling plant from G Konduru Pumping Station

P&ID No: IOCL Spur line

Type : Piping and piping components, MOV

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow from Tap off  1.1 More LPG will flow,  1.1.1 FT 1503  is Provided  1.1.1.1 P&ID to be updated    
station  Process upset  1.1.2 PSHH 1502 will close MOV 1505 &  for cause & effect ( 1.1.2  
ROV 1506  PSHH 1501 actually it is  
PSHH 1502   ), reducer's  
1.1.3 SCADA system is Provided 
standard symbols to be 
1.1.4 PT 1505/07/08  is Provided  used 
1.1.5 PI 1505/07/08 is provided 
 
 
 
 
 
 
 

Page 42 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Guideword : Less Parameter : Flow

Deviation : Less Flow        


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less/no Flow of  1.1 Less LPG will flow;  1.1.1 FT 1503  is Provided       
LPG from upstream   Process upset  1.1.2 SCADA system is Provided 
• ROV 1506  stuck  1.1.3 ZLL 1506 is Provided 
close   1.1.4   DPG is provided for filter 
• Filter choke  
• Leak  
         
Guideword : Leak Parameter : Leak

Deviation : Leak

Causes Consequences Safeguards Recommendations Remarks


• 1 Corrosion   1.1 HSE Hazard, Fire    1.1.1 Thickness testing at defined    
• Mechanical  frequency  
vibration ,  
1.1.2 External painting and coating is 
• Gasket leak   done 
• Pipeline leak   
1.1.3 Corrosion coupons are provided 
1.1.4 ER Probe is provided 
1.1.5 GA 1503  is provided  
1.1.6 Deluge system, fire hydrant 
system are provided 
1.1.7 QBD detection system provided 
1.1.8 Earthing &  bonding provided       

Page 43 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 18 BPCL LPG bottling plant


 
Node Description: LPG supply to BPCL bottling plant from G Konduru Pumping Station

P&ID No: BPCL drawing

Type : Piping and piping components, MOV

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More flow of LPG  1.1 More LPG will supply to  1.1.2 PSHH 1801 will close MOV         
from IOCL tap off   BPCL bottling plant‐Process  1804,ROV 1801 
• ROV 1801  stuck  upset    1.1.3 PT 1801/02 is provided 
open  1.1.4 SCADA system is provided 
1.1.5 TSV 1801/02 is Provided 
         
 
 
 
 
 
 

Page 44 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Deviation : More Temperature
 
Causes Consequences Safeguards Recommendations Remarks
1 Due to atmospheric Heat  1.1 HOT LPG in pipe line;  1.1.1 SCADA System is provided       
source change  Leak  1.1.2 TSV 1906/09/11 are provided    
1.1.3 TE 1903/06 are provided    
1.1.4 GA 1801 is provided     
1.1.5 Fire fighting system is provided     

Guideword : Leak Parameter : Leak

Deviation : Leak

Causes Consequences Safeguards Recommendations Remarks


• 1 Corrosion   1.1 HSE Hazard, Fire    1.1.1 Thickness testing at defined 
• Mechanical  frequency  
vibration  
1.1.2 External painting , coating (PE ) 
• Gasket leak   done 
• Pipeline leak   
1.1.3 GA 1801  is provided  
1.1.4  fire hydrant system is provided 
1.1.5 Earthing &  bonding provided          

This report is generated using HAZOP‐Pro software

Page 45 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Cherlapalli Region

Page 46 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 19 LPG Transfer From G-Konduru to Cherlapalli RT


 
Node Description: LPG transfer from G-Konduru to Cherlapalli RT

P&ID No: 1116,1117

Type : Piping and piping components, Filter

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More LPG will  1.1 More LPG will Flow‐ 1.1.1 TSV‐1602,05/06/07 are provided   1.1.1.1 PG, PT to be    
Flow through  Process Upset  1.1.2 PT‐1601/03/04 are  provided  provided around basket 
Pipeline from  1.1.3 PG‐1606,10 are provided  filter. 
upstream  
• MOV‐1602 stuck 
open 
• Booster Pump 
malfunctioning 
 
 
 
 
 
 

Page 47 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
 
 
 
Guideword : Less Parameter : Flow

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less LPG will flow  1.1 Less pressure LPG  will  1.1.1 PI‐1601/03/04 are  provided      
from upstream   supply‐Process Upset  1.1.2 Minimum Flow Line is Provided 
• MOV‐1603 stuck  1.1.3 PT‐1601/03/04,  1701, 1706 are 
close   provided 
• Filter choke,   1.1.4 PSLL‐1701 will close MOV 1703 
• LPG pipe line leak  1.1.5 SCADA System is provided 
1.1.6 Low pressure aunnuciator audible  
alarms provided 

Page 48 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
 
Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less supply  1.1 LPG will flow in Reverse  1.1.1 NRV is provided on Booster Pump         
pressure   direction  1.1.2 PT‐1601/03/04, PT 1701, PT 1706 
• More downstream  are provided 
pressure   1.1.3 MOV 1703 will close 
1.1.4 SCADA System is provided 
1.1.5 Low pressure aunnuciator audible  
alarms provided 

Page 49 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
 
 
 
Guideword : More Parameter : More Pressure

Deviation : More Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 More pressure due to  1.1 More pressure LPG  1.1.1 TSV 1602/05/06/1703/10 are         
ambient condition, process  delivered to Secundrabad,  provided 
upset  LPG may leak  1.1.2 PG 1606/10 is provided 
1.1.3 Persons taking the round 
1.1.4 TT 1603/04 are provided 
1.1.5 Gas alarm(GA) 
1601/02/1701/02/03 are provided 
1.1.5 PT‐
1601/02/05/06/07,1701/02/03/04 /05 
are provided 

Page 50 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Leakage Parameter : Leakage

Deviation : Leakage
 
Causes Consequences Safeguards Recommendations Remarks
1 Leakage from flange,  1.1 LPG leakage, Fire, HSE  1.1.1 Gas alarm(GA)         
filter.  hazard  1601/02/1701/02/03 are provided 
1.1.2 SCADA system is provided 
1.1.3Persons taking the round 
1.1.4 PT‐
1601/02/05/06/07,1701/02/03/04 /05 
are provided 

Page 51 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 20 Secundrabad RT for HPCL


 
Node Description: LPG supply to HPCL bottling plant from Cherlapalli RT

P&ID No: 1117

Type : Piping and piping components, MOV,FIC

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More Flow due to  1.1 More flow LPG supply  1.1.1 PT 1702/11 are provided       
booster pump  to HPCL Leakage  1.1.2 PT 1702/10 are cascaded with 
malfunctioning  PCV 1701 
(Variable Speed)   1.1.3 FT 1702/03 are provided 
• PCV 1701 stuck  1.1.4 PT 1703,04 are cascaded with FIC 
open  1701 
1.1.5 PCV 1702 is provided 
 
 
 
 
 
 
Parameter : Flow

Page 52 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Less

Deviation : Less Flow


 
Causes Consequences Safeguards Recommendations Remarks
• 1 PCV 1701 stuck  1.1 Less LPG supply to HPCL  1.1.1 ZLL 1703 is Provided         
close   1.1.2 FIC 1701 is Provided 
• Filter choke  1.1.3 PT 1701/02/06 are provided 
• Less pressure LPG  1.1.4 PIC 1702 will close PCV 1702 
from pipe line  when pressure falls below 9 kg/cm2 
1.1.5 SCADA System is Provided 
1.1.6 PSLL 1701 close MOV 1703 

Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More pressure from  1.1 LPG will flow in reverse  1.1.1 FIC 1701 is provided         
downstream  direction  1.1.2 SCADA system is provided 
1.1.3Low pressure aunnuciator audible  
alarms provided 
1.1.4 NRV is provided on booster pump 
discharge 
 
   
   
   

Page 53 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Parameter : Corrosion / Erosion

Deviation : Corrosion / Erosion


 
Causes Consequences Safeguards Recommendations Remarks
1 Due to moisture;  1.1 Pipe line may leak, HSE  1.1.1 Cathodic protection and, external         
corrosion   problems  coating to the underground pipe line 
1.1.2 Regular thickness checking as per 
defined frequency 
1.1.3 Corrosion coupons fitted into the 
pipe line 
1.1.4 Electrical probe provided 

Guideword : Parameter : Leak

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Due to more pressure,  1.1 HSE problem, Fire  1.1.1 Gas detectors are provided       
gasket weakens,  1.1.2 SCADA system monitoring 
Mechanical vibrations  1.1.3 Fire fighting, Sprinkler system are 
provided 

 
 
 

Page 54 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
 
 
 
Guideword : Parameter : Corrosion

Deviation : Corrosion
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to moisture   1.1 Pipe line corrosion ,  1.1.1 Cathodic protection is provided         
• MIC   internal , external and leak  1.1.2 Pipe line cleaning and thickness 
• AC interference  checking at defined frequency 
1.1.3 Proper coating to the pipe line 
1.1.4 Leak detection system is provided 
1.1.5 Grounding of AC interference 
1.1.6 corrosion coupons are provided 
1.1.7 Electrical resistance is probe 
provided 

This report is generated using HAZOP‐Pro software  

Page 55 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 21 Secundrabad RT for BPCL at Cherlapalli


 
Node Description: LPG supply to BPCL bottling plant from Cherlapalli RT

P&ID No: 1126

Type : Piping and piping components, MOV,FIC

Deviation : More Pressure


       
Guideword : More Parameter : Pressure
Causes Consequences Safeguards Recommendations Remarks
• 1 More Flow  1.1 More flow of LPG  1.1.2 PT 2601/02/04/06 is provided         
from upstream  supply to BPCL,  1.1.1 PSHH 2601 will close MOV 2601, ROV 2601 
•  PCV 2601 stuck  Leakage 
open  1.1.3 TSV 2603 2601/03/05/06 is provided 
• Booster pump 
1.1.4 PT 2604 is cascaded with FT 2602 
mal 
functioning(Vari
able Speed) 

 
 
 
 
 

Page 56 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
 
Guideword : Less Parameter : Pressure

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 PCV 2601  1.1 Less Pressure LPG  1.1.1 FIC 2601 is Provided         
stuck close  supply to BPCL  1.1.2 PSLL 2601 will close MOV 2601 
• Less pressure in  1.1.3 PIC 2601 is cascaded with PCV 2601 
pipe line  1.1.4 PT 2601/02/04/06 are provided 
1.1.5 SCADA System is Provided 

Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More downstream  1.1 LPG will flow in  1.1.1 FIC 2601 is provided       
pressure   reverse direction  1.1.2 SCADA system monitoring 
1.1.3 NRV is provided on booster pump discharge 
line 
1.1.4 PT 2601/02/04/06 are provided 
1.1.5 Low pressure aunnuciator audible  alarms 
provided 
   
 
 
 

Page 57 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Guideword : Parameter : Corrosion

Deviation : Corrosion
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to  1.1 Pipe line corrosion  1.1.1 Cathodic protection is provided         
moisture   , internal , external and  1.1.2 Pipe line thickness checking at defined 
• MIC   leak  frequency 
• AC interference  1.1.3 Proper coating to the pipe line 
1.1.4 Leak detection system is provided 
1.1.5 Grounding of AC interference 

Guideword : Parameter : Leak

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1. Due to more  1.1 LPG leakage, HSE  1.1.1 Patrolling in three shifts( Once in a shift)         
pressure,   hazard  1.1.2 SCADA system monitoring for pressure drop 
• Gasket leaks   and shut down accordingly 
• Mechanical 
vibration 
 
 
 
 

Page 58 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : More Parameter : Temperature

Deviation : More Temperature


 
Causes Consequences Safeguards Recommendations Remarks
1 Due to atmospheric  1.1 Hot LPG supply to  1.1.1 SCADA monitoring is Provided      
condition; Heat source  BPCL  1.1.2 TE 2602/03/04 are provided 
1.1.3 PT 1.1.3  PT 2602, 2603,2604,2606,2607 is 
provided 
1.1.4  TSV 
2601.2602,2603,2604,2605,2606,2607,  2608  are 
provided 

This report is generated using HAZOP‐Pro software

Page 59 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Worksheet Report

Node : 22 Secundrabad RT For IOCL


 
Node Description: LPG Supply to IOCL from Cherlapalli RT

P&ID No: 1125

Type : Piping and piping components, MOV

Guideword : More Parameter : Pressure

Deviation : More Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 More pressure  1.1 High pressure LPG will  1.1.1 PT‐2502/04/06 are provided         
from upstream   flow from Secunderabad RT  1.1.2 PSHH‐2501 will close MOV 2501 
• PCV‐2501 stuck  for IOCL  1.1.3 TSV‐2501/02/03/06 are provided 
open  1.1.4 FT 2602 is provided 
         
 
 
 
 
 
 
 
 

Page 60 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Guideword : Less Parameter : Pressure

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
• 1 Less Pressure LPG  1.1 Less Pressurized LPG  1.1.1 PT‐2502/04/06 are provided         
will flow from  transferred to IOCL  1.1.2 PSLL‐2501 will close MOV 2501 
upstream   1.1.3  FT 2502 is provided 
• PCV‐2501 stuck  1.1.4 Low pressure aunnuciator audible  
close  alarms are provided 
         
Guideword : Reverse Parameter : Flow

Deviation : Reverse Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 Due to more downstream  1.1 LPG will flow in reverse  1.1.1 FT 2502 is provided         
pressure  direction  1.1.2 PSLL 2501 will close MOV 2501 
1.1.3 NRV is provided on Booster pump 
discharge line 
 
 
 
 
 
 
 
 

Page 61 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Guideword : Parameter : Corrosion

Deviation : Corrosion
 
Causes Consequences Safeguards Recommendations Remarks
1 Due to moisture;  1.1 Pipe will get corroded  1.1.1 Cathodic protection is provided         
corrosion  and may leak  1.1.2 Pipeline thickness checking at 
defined frequency 
1.1.3 Corrosion coupons provided 

Guideword : Parameter : Leak

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to more  1.1 LPG will leak leading to  1.1.1 Gas detectors are provided         
pressure,   HSE hazard, Fire   1.1.2 SACADA system is Provided 
• Gasket leaks   1.1.3 Public awareness 
• Mechanical  1.1.4 Wind socks are provided 
vibration 
1.1.5 Fire fighting system is Provided 
 
 
 
 
 
 
 
 
 

Page 62 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
 
Guideword : More Parameter : Temperature

Deviation : More Temperature


 
Causes Consequences Safeguards Recommendations Remarks
1 Due to atmospheric  1.1 Hot LPG will supply to  1.1.1 TSV 2501/002/04/05 are      
condition; hot atmosphere  IOCL , leak  provided 
1.1.2 TE 2502/04 are provided 
1.1.3 SCADA monitoring is Provided 
1.1.4 Gas detectors is provided 

Guideword : Parameter : Corrosion

Deviation : Corrosion
 
Causes Consequences Safeguards Recommendations Remarks
• 1 Due to moisture   1.1 Pipe line corrosion ,  1.1.1 Cathodic protection is provided         
• MIC   internal , external and leak  1.1.2 Pipeline thickness checking at 
• AC interference   defined frequency 
1.1.3 Proper coating to the pipe line 
1.1.4 Leak detection system provided 
1.1.5 Grounding of AC interference 
1.1.6 corrosion coupons are provided 
1.1.6 Electrical resistance probe is 
provided 

This report is generated using HAZOP‐Pro software

Page 63 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

 
Worksheet Report 

Node : 23 Fire Hydrant System 
 
Node Description: Fire Hydrant System‐ Cherlapalli 

P&ID No: 1075 

Type : Piping and piping components, Fired Equipment, Filter, Pump, Design Problems, Diesel Operated Fire hydrant pump, Heat Transfer Equipment, 
Centrifugal Pump, Jockey pump 

Guideword : More  Parameter : Flow 

Deviation : More Flow 
 
Causes  Consequences  Safeguards  Recommendations  Remarks 
1  Both diesel operated  1.1 Fire hydrant line  1.1.1 Pump running indicator provided  1.1.1.1 P & ID to be updated    
pump run  may leak  local panel  for PT, TSV 
1.2 HSE issue  1.1.2 Firemen’s vigilance 
1.1.3 PG 503/04 are provided 
1.1.4 PSV provided in the field 
1.1.5 PT is provided 
1.1.6 Circulation line is provided 

   
   
   
   

Page 64 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

   
  Parameter : Flow 
 
 
Guideword : Less 

Deviation : Less Flow 
 
Causes  Consequences  Safeguards  Recommendations  Remarks 
• 1 Diesel operated  1.1 Emergency may  1.1.1 LT 506/08 are provided         
pump not operated  take more time to   1.1.2 PG 503/04 are provided 
at low pressure  mitigate it  1.1.3 PAL 503 provided to start main 
• No water in fire  diesel pump at 7.5 Kg/cm2g 
hydrant  tank 
1.1.4 Regular battery check up 
• Strainer choke  
1.1.5 PT is provided 
• Discharge batteries 

Guideword : Reverse  Parameter : Flow 

Deviation : Reverse Flow 
 
Causes  Consequences  Safeguards  Recommendations  Remarks 
1 NRV stuck open  1.1 Diesel pump will   1.1.1 PT provided         
rotate in reverse   1.1.2 Regular maintenance 
direction and less  1.1.3 PG 503/04 are provided 
hydrant pressure 
1.1.4 Manned pump house 

 
 
 

Page 65 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Deviation : Leak 
 
Causes  Consequences  Safeguards  Recommendations  Remarks 
1 Due to atmospheric  1.1 MS pipe line will  1.1.1 Pipe lines are coated with suitable      
condition like acidic  corrode and leak,  material 
atmosphere, gasket will  less pressure  1.1.2 Fire hydrant tank levels monitored 
leak  hydrant water for 
1.1.3 Frequent pump running 
emergency 
1.1.4 Regular flushing 
 
This report is generated using HAZOP‐Pro software  

Page 66 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Pigging Operation

Page 67 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 24 Cavern Feeder Line


 
Node Description: Cavern Feeder Line scrapping from HPCL old bottling plant to Vizag DT

P&ID No: 1111, 1128

Type : Piping and piping components ,Filter, scraper Launcher, scraper receiver

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow of LPG from  1.1 More LPG will flow ,  1.1.1 PT 1101,2802 are provided  1.1.1.1 Provide PG and    
source  for pigging process.   line leak,   drain points at appropriate 
location to depressurize 
the  scraper receiver and 
launcher 
1.1.2 TSV 1102,03,  2801,03 are  1.1.1.2 Provide positive 
provided  isolation system for scraper 
receiver and launcher  
1.1.3 XXI 1102, 2801 are provided  
1.1.4  Pig tracker is used 
1.1.5 SCADA system 

Page 68 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

         
         
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Less flow of LPG from  1.1 Pigging will take more  1.1.1 PT 1101,2802 are provided       
source  time,   1.1.2 XXI 1102, 2801 are provided  
1.1.3 Pig tracker is used 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, pig  1.1 EHS hazard  1.1.1 Gas detectors are provided      
receiver door , drain points    1.1.2 Fire fighting system is provided 

Page 69 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 25 Main Line (VIZAG TO RAJAHMUNDRY)


 
Node Description: Main Line scrapping From Vizag to Rajahmundry

P&ID No: 1112,1113

Type : Piping and piping components, Filter, scraper Launcher, scraper receiver

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow of LPG from  1.1 More LPG will flow ,  1.1.1 PT 1204/1301 are provided  1.1.1.1 Provide PG and    
source  for pigging process.   line leak,   drain points at appropriate 
location to depressurize 
the  scraper receiver and 
launcher 
1.1.2 TSV 1203/04/1301/02 are  1.1.1.2 Provide positive 
provided  isolation system for scraper 
1.1.3 SCADA System  receiver and launcher  
1.1.4 XXI 1201, 1301/02  are provided  
1.1.5 Pig tracker is used 

Page 70 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

         
         
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Less flow of LPG from  1.1 Pigging will take more  1.1.1  PT 1204/1301 are provided       
source  time,   1.1.2 XXI 1201, 1301/02  are provided  
1.1.3 Pig tracker is used 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, pig  1.1 EHS hazard  1.1.1 Gas detectors are provided       
receiver door , drain points    1.1.2 Fire fighting system is provided 

Page 71 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 26 Main Line ( Rajahmundry to G Konduru)


 
Node Description: Main Line scrapping from Rajahmundry to G Konduru

P&ID No: 1113, Vijayawada pumping/Pigging Station

Type : Piping and piping components, Filter, scraper Launcher, scraper receiver

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow of LPG from  1.1 More LPG will flow ,  1.1.1 PT 1302, 1401/10 are provided  1.1.1.1  Provide  PG  and    
source  for pigging process.   line leak,   drain  points  at  appropriate 
location  to  depressurize 
the    scraper  receiver  and 
launcher  
1.1.2 TSV 1303/05/1401/06 are  1.1.1.2  Provide  positive 
provided  isolation system for scraper 
1.1.3 XXI 1303/1401/02  are provided   receiver and launcher  
1.1.4 Pig tracker is used 
1.1.5 SCADA System 

Page 72 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

         
         
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Less flow of LPG from  1.1 Pigging will take more  1.1.1  PT 1302, 1401/10 are provided       
source  time,   1.1.2 XXI 1303/1401/02  are provided  
1.1.3 Pig tracker is used 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, pig  1.1 EHS hazard  1.1.1 Gas detectors are provided       
receiver door , drain points    1.1.2 Fire fighting system is provided 

Page 73 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 27 SPUR LINE (G KONDURU TO HPCL BOTTLING PLANT)


 
Node Description: Spur Line scrapping from G. Konduru to HPCL Bottling plant

P&ID No: SPUR LINE HPCL, VIJAYAWADA RT

Type : Piping and piping components, Filter, scraper Launcher, scraper receiver

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow of LPG from  1.1 More LPG will flow ,  1.1.1 PT 1905 is provided  1.1.1.1  Provide  PG  and    
source  for pigging process.   line leak,   drain  points  at  appropriate 
location  to  depressurize 
the    scraper  receiver  and 
launcher  
1.1.2 TSV 1909/10/11/12 are provided  1.1.1.2  Provide  positive 
1.1.3 XXI 11901/02/03  are provided   isolation system for scraper 
receiver and launcher  
1.1.4 Pig tracker is used 
1.1.5 SCADA System 
         

Page 74 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

         
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Less flow of LPG from  1.1 Pigging will take more  1.1.1 PT 1905 is provided       
source  time,   1.1.2 XXI 11901/02/03  are provided  
1.1.3 Pig tracker is used 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, pig  1.1 EHS hazard  1.1.1 Gas detectors are provided       
receiver door , drain points    1.1.2 Fire fighting system is provided 

Page 75 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 28 SPUR LINE (G KONDURU TO IOCL BOTTLING PLANT)


 
Node Description: Spur Line scrapping from G. Konduru to IOCL Bottling plant

P&ID No: SPUR LINE IOCL, VIJAYAWADA RT

Type : Piping and piping components, Filter, scraper Launcher, scraper receiver

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow of LPG from  1.1 More LPG will flow ,  1.1.1 PT 1505/07 are provided  1.1.1.1  Provide  PG  and    
source  for pigging process.   line leak,   drain  points  at  appropriate 
location  to  depressurize 
the    scraper  receiver  and 
launcher  
1.1.2 TSV 1509/10/11/12  are provided  1.1.1.2  Provide  positive 
1.1.3 XXI 1501/02/03  are provided   isolation system for scraper 
receiver and launcher  
1.1.4 Pig tracker is used 
1.1.5 SCADA System 
         

Page 76 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

         
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Less flow of LPG from  1.1 Pigging will take more  1.1.1 PT 1505/07 are provided       
source  time,   1.1.2 XXI 1501/02/03  are provided  
1.1.3 Pig tracker is used 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, pig  1.1 EHS hazard  1.1.1 Gas detectors are provided       
receiver door , drain points    1.1.2 Fire fighting system is provided 

Page 77 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 29 MAIN LINE (G KONDURU TO SURYAPET)


 
Node Description: Main Line scrapping from G. Konduru to Suryapet

P&ID No: VIJAYAWADA PUMPING STATION, 1116

Type : Piping and piping components, Filter, scraper Launcher, scraper receiver

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow of LPG from  1.1 More LPG will flow ,  1.1.1 PT 1407/1601/07  are provided  1.1.1.1  Provide  PG  and    
source  for pigging process.   line leak,   drain  points  at  appropriate 
location  to  depressurize 
the    scraper  receiver  and 
launcher  
1.1.2 TSV 1403/05/14/1601/02  are  1.1.1.2  Provide  positive 
provided  isolation system for scraper 
1.1.3 XXI 1403/1601/02 are provided   receiver and launcher  
1.1.4 Pig tracker is used 
1.1.5 SCADA System 

Page 78 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

         
         
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Less flow of LPG from  1.1 Pigging will take more  1.1.1 PT 1407/1601/07  are provided       
source  time,   1.1.2 XXI 1403/1601/02 are provided  
1.1.3 Pig tracker is used 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, pig  1.1 EHS hazard  1.1.1 Gas detectors are provided       
receiver door , drain points    1.1.2 Fire fighting system is provided 

Page 79 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

Worksheet Report

Node : 30 MAIN LINE (SURYAPET TO CHERLAPALLI)


 
Node Description: Main Line scrapping from Suryapet to Cherlapalli

P&ID No: 1116, 1117

Type : Piping and piping components, scraper Launcher, scraper receiver

Guideword : More Parameter : Flow

Deviation : More Flow


 
Causes Consequences Safeguards Recommendations Remarks
1 More Flow of LPG from  1.1 More LPG will flow ,  1.1.1 PT 1706 is provided  1.1.1.1  Provide  PG  and    
source  for pigging process.   line leak,   drain  points  at  appropriate 
location  to  depressurize 
the    scraper  receiver  and 
launcher  
1.1.2 TSV 1603/05/1707/1710 are  1.1.1.2  Provide  positive 
provided  isolation system for scraper 
1.1.3 XXI 1603/1701/1702 are provided  receiver and launcher  
1.1.4 Pig tracker is used 
1.1.5 SCADA System 
         

Page 80 of 81
HAZOP Study of VSPL pipeline network and its associate facilities
GAIL (India) Limited

         
Guideword : Less Parameter : Flow

Deviation : Less Pressure


 
Causes Consequences Safeguards Recommendations Remarks
1 Less flow of LPG from  1.1 Pigging will take more  1.1.1 PT 1706 is provided       
source  time,   1.1.2 XXI 1603/1701/1702 are provided 
1.1.3 Pig tracker is used 

Deviation : Leak
 
Causes Consequences Safeguards Recommendations Remarks
1 Leak from Flange, pig  1.1 EHS hazard  1.1.1 Gas detectors are provided       
receiver door , drain points    1.1.2 Fire fighting system is provided 

Page 81 of 81
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Draft Rev. B
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

APPENDIX B
ABBREVATION

22
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Draft Rev. B
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Abbreviation Full Form


2oo2 2 out of 2
2oo3 2 out of 3
BL Battery limit
C&E Cause and Effect
DM Demineralised
DMW Demineralised Water
F&G Fire and Gas
FAL Flow Alarm Low
FCV Flow Control Valve
FI Flow Indicator
FIC Flow Indicator Control
FS-AL Flow Sensor Alarm High
FT Flow Transmitter
FT Flow transmitter
HAZOP Hazard and Operability Study
HC Hydrocarbon
HCV Hand Control Valve
HIC Hand indicating Controller
HP High Pressure
HV Handle Valve
IOCL Indian Oil Corporation Ltd.
LAH Level Alarm High
LAL Level Alarm Low
LALL Level Alarm Low-Low
LCV Level Control Valve
LCV Level Control Valve
LG Level Gauge
LIC Level Indicator Controller
LP Low Pressure
LSHH Level Switch High-High
LSLL Level Switch Low-Low
NDT Non Destructive Testing
NRV Non Return Valve

23
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Draft Rev. B
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

Abbreviation Full Form


OH Overhead
P & ID Piping and Instrumentation Diagram
PAL Pressure Alarm High
PALL Pressure Alarm High-High
PDAH Pressure Differential Alarm High
PDCV Pressure Differential Control Valve
PDI Pressure Differential Indicator
PFD Process Flow Diagram
PI Pressure Indicator
PI-AH Pressure Indicator Alarm high
PIC Pressure Indicator Control
PSLL Pressure Switch Low Low
PSV Pressure Safety Valve
ROT Riser Outlet Temperature
SDV Shutdown Valve
SDV Shut Down valve
SOP Safe Operating Procedure
TAH Temperature Alarm High
TAL Temperature Alarm Low
TI Temperature Indicator
TIAH Temperature Indicator Alarm High

24
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Draft Rev. B
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

UNITS USED

SR. NO. PARAMETERS SYMBOLS UNITS


1 Length “ Inch
M Meter
3
2 Volume m Meter cube
3
cm Centimetre Cube
o
3 Temperature C Degree Celsius
2
4 Pressure kg/cm Kilogram per sq. centimetre
5 Weight Kg Kilogram
MMTPA Metric Million Tonne Per Annum
MT Metric Tonne
6 Concentration ppm Parts per million
ppb Parts per billion
7 Percentage % Percentage

25
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Draft Rev. B
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

APPENDIX C – Node Marked-Up P&IDs

26
GAIL (INDIA)LIMITED
Visakhapatnam (A.P)
HAZOP for Vizag-Secunderabad Pipeline-VSPL
BEST/ IND / CON / 1380 GAIL Issue: Draft Rev. B
Vizag / ORD 15-16 / 002- 01 Date : 19-02-16

APPENDIX D – Attendance Sheet

27