Sie sind auf Seite 1von 2

Autodesk customer success story

COMPANY Innovative healthcare design


BECA
LOCATION Increased collaboration and coordination
Tauranga, New Zealand
INDUSTRY SECTOR:
with BIM
Building
SOFTWARE
Autodesk® BIM 360™ Field
Autodesk® BIM 360™ Glue®
Autodesk® Navisworks®
Autodesk® Revit®
Autodesk® ReCap®

“Beca has strived over the last few years


to try and manage our BIM
environment. Autodesk Consulting
has helped us in actually producing
solutions that work for us and our
clients. Through the tools and processes
we have set up on our projects, we are
not only increasing communication and
transparency to all stakeholders but we Revit visualisation of coordinated services and structure design solution
are enabling greater collaboration and
understanding between all
parties involved.” Project overview Complexity in design and time
Beca was commissioned as the project constraints
Philip Smith manager and lead consultant for the Building There have been a number of challenges to
CAD Systems Manager Services and Seismic Structural design for a address on the project. Firstly, the requirements
Beca new Cathlab Facility at Tauranga Hospital. The changed from wards to a Cathlab Facility,
building was built in 2011 and had several constraining the design process. There was
vacant levels, waiting to be fitted out. Originally limited space within the ceiling void for the
intended to be a series of wards, the decision number of services required. This meant
was made to develop Level 2 into a collaboration between all of the design
Cathlab Facility. stakeholders was incredibly important.
Introduction
Beca is one of the largest employee-owned As one of the largest hospitals in the Bay of Additional seismic support was also required for
professional services consultancies in the Asia Plenty area, it was important that a range of the services due to potential earthquakes. This
Pacific. Established in 1918 in New Zealand cardiology services could be offered to the is a requirement for buildings in New Zealand
with just three employees, Beca today has a communities it serves. The hospital previously so that they can remain functional in the event
substantial Asia Pacific footprint, approaching had distributed services across different floors of an earthquake. Walls, ceilings and services
3,000 employees in 19 offices across the world. and buildings, creating patient and workflow have to be seismically braced to prevent injury
Beca delivers a variety of consultancy services inefficiencies. The new Cathlab Facility or death, further reducing the available space in
across the Buildings, Government, Industrial, however, will enable all cardiology services to the facility. There were a number of small rooms
Power, Transport and Water market segments. be consolidated in one area and provide within the facility to be braced (creating
It operates from three main “hubs” – Australia, additional capacity for patients and improved potential for bracing clashes), adding to the
New Zealand and Asia – offering everything work practices. design and construction complexity.
from engineering, architecture and planning
services, to project and cost management, At the completion of the project, the client Finally, there were also various time constraints
software technology and valuation services.  will require a schedule of critical maintainable to contend with. The project is due for
assets. This will enable improved asset and completion in mid 2016 and has a strict eight
Healthcare is one of Beca’s largest market facilities management for future development month timeline, meaning there was no room for
segments. It’s built over 300,000 square metres of the space. Having accurate equipment data error from working with potentially incomplete
of hospital facilities in New Zealand alone. The can not only lower the cost of ownership of the or inaccurate information. This meant it was
Bay of Plenty District Health Board is one of facility but also improve the level of service by crucial that information on the existing structure
Beca’s key clients, and it has been working with reducing the potential for downtime. and services was entirely accurate. Therefore,
the team for over a decade. coordination was critical not just between the
Autodesk customer success story

proposed designs, but also within the existing round the particular facility and recapturing all Autodesk Consulting has also been engaged
environment. of the information that’s already been created to work with Beca to establish the workflows
through the design and construction process. and methods for the application of BIM 360
Increased accuracy and close By working with Autodesk, we’ve been able to and to help train both the Beca team, its project
collaboration capture this critical data from day one, ensuring partners and the client.
the client can effectively maintain and operate
Initially, Beca recommended that a point cloud the facility.” Philip Smith, CAD Systems Manager, Beca,
laser scan was used to capture the existing concluded: “Autodesk Consulting really has
environment, concrete structure and services helped us to further our investment in
that were already occupying the space. This BIM-based technologies by firstly getting to
generated an accurate understanding of the know our business, how we work, what are
current structure and parameters that the our drivers and most importantly, how we look
design team had to work to. A ‘capture it once to deliver successful outcomes for our clients.”
and use many times’ mentality was deployed.
This has enabled the team to work within the
tight construction timeline because they could
be confident that the information captured was “Autodesk and its technology has been
entirely accurate and up to date. the perfect solution for this project.
Point cloud scan of the existing environment shown in Autodesk’s tools work together so that
The point cloud information could then be Autodesk ReCap
information flows freely from the
imported into Revit to inform the design process
modelling suite to the field. That
from the outset of the project and ensure
accurate 3D models of the existing conditions reduces risk, saves costs and provides
were created. Proposals were then designed certainty in project outcomes.”
and documented by the Building Services and
Vaughan Robertson
Structure design teams.
Group Manager of Technology
The Revit models were then imported into Strategy
Navisworks, along with the point cloud data Beca
for coordination purposes. The team also
undertook clash detection, not just on the new Revit model of existing environment created from point
designs, but also on the existing models to cloud scan
provide an accurate comparison. “Autodesk is important to Beca
BIM 360 Glue was used to enable all design because we’ve always sought to build
teams to communicate and rapidly publish strategic relationships with our clients,
design iterations to the cloud. This was design partners and vendors. The
beneficial as the teams were not all in the same relationship we’ve built with Autodesk
place at one time, and so it brought far greater has allowed us to deliver world class
visibility to the project.
designs throughout all our regions and
This also meant that Beca has been able to deliver cost effective and very efficient
engage more easily with all the stakeholders projects for our clients.”
involved, facilitating sign off on the project,
allowing them to rapidly progress with the Jon Williams
Autodesk BIM 360 Glue and Field being used during
designs. Finally, BIM 360 Field is being used Business Director of Practice
construction
to capture data during the construction stage. Development
This will allow the required asset list to be Beca
incorporated into the hospital’s existing asset Strengthened relationship
management solution, as BIM 360 Field allows Autodesk provided Beca with its own
for a neutral data drop. Customer Success Manager who was dedicated
to supporting the project and driving the right
Reduced timeframes solutions across the business. The CSM has
been able to quickly respond to Beca’s business
By deploying a range of Autodesk tools, Beca needs and then channel the support needed
has enabled a significant reduction in time throughout the project.
taken to capture, create and distribute
information. Brett added: “Our Customer Success Manager
has not only ensured we had a very happy
Brett Naylor, Technical Director and BIM client, they have also provided us with the right
Delivery Leader, Beca, comments: knowledge and skills needed to help us win
“In the past, our clients have often had to more projects and deliver better services right
spend anything between 6 to 18 months going across the business in the future.”

Autodesk, Autodesk Inventor and Revit are registered trademarks or trademarks of Autodesk, inc. in the USA and/or other countries. All
other brand names, product names or trademarks belong to their respective holders. Autodesk reserves the right to alter product and
services offerings and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that
may appear in this document. © Autodesk, inc. All rights reserved.

Das könnte Ihnen auch gefallen