Sie sind auf Seite 1von 1

Department of Education

Region X
Division of Cagayan de Oro City
Southwest II District
MAN-AI ELEMENTARY SCHOOL
Sitio Man-ai Tignapoloan, Cagayan de Oro City

SIMFLIFIED SUSTAINABILTY PLAN


ASPECTS DISCRIPTION
WHAT IS THE NATURE OF THE PROJECT? THE NATURE OF THE PROJECT IS TO SUSTAIN THE CONDITION AND
FUNCTION OF THE T2T GADGETS/EQUIPMENTS.
 Repair and maintenance of equipment/s or gadgets
 Avail internet connection for updates and reports regarding the
use of t2t.
 Replacement of broken/lost or cannot be repaired equipment.
WHO IS THE PROPONENT? SCHOOL /teachers/pupils
WHY IS THE PROJECT NEEDED? THE PROJECT IS NEEDED FOR THE BETTERMENT AND EFFECTIVENESS OF THE
T2T PROGRAM
WHAT DO YOU PROPOSE TO DO? Allocate a budget from MOOE for the repairs needed.
Tap the stakeholders for help for the expenses needed for the repair
and maintenance of t2t equipment/s.
Seek authorized service center to do the repair.
HOW MUCH FUNDING DO YOU REQUIRE AND WHEN DO YOU  Depending on the nature of the problem or status:
NEED IT? Services=1500-2000 pesos
Replacement=
HOW WILL FUNDING MAKE A DIFFERENCE?
SUPPORTING DATA/EXAMPLE: The t2t program will help improved our pupils literacy needed to
 HOW T2T IMPROVED PERFORMANCE OF STUDENTS achieve.
 HOW LONG HAS THE PROBLEM EXISTED? The problem existed when the netgear and miracast were both lost and
 TESTIMONIALS OF THE STUDENTS AND T2T TEACHERS was not properly declared lost or turn over from the previous teacher/s
of the program.
PREPARED BY:
ERNIE F RATUNIL JR.
TEACHER 1

NOTED:
FE V MORALES
SCHOOL PRINCIPAL

Das könnte Ihnen auch gefallen