IMSI Signaling Real-Time Trace

4.1.1.3.1 ZTE EPC

IMSI Signaling: In the System Tools->Unified Data Tracing->Task

Managementwindow, selectIMSI Signalingand double click or click button,


the task setting dialog will appear,see the figure below.

Figure 4-13Create IMSI task

In the tracing scope window, enter task name, core network IP address and

IMSI code to be traced. , clickto add IMSI to Selected Items.

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第1页
秘密▲

Figure 4-14Tracing scope setting

ClickNextbutton, and select the items you want to trace.

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第2页
秘密▲

Figure 4-15Observation object

Click Nextbutton and one new setting dialog appears.

Just set the End dateyou want to stop trace.The other parameters use default
setting.

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第3页
秘密▲

Figure 4-16Tracing parameter setting

Click Finishbutton,the task setting is finished.Then click to synchronize the


task.Now,you can trace the IMSI level signalings.

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第4页
秘密▲

Figure 4-17Synchronizing the IMSI task

Figure 4-18Synchronizing the IMSI task 2

4.1.1.3.2 EPC from other Vendors

1. The core network of other vender deliver IMSI task

2. ZTE stuff obtains IMSI No and TraceReferenceID from the core network of
other vendors.

Note:
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第5页
秘密▲

TraceReferenceID can be otained from S1 standard signaling: S1 Tracestart

Enabling a UE-Level signaling task in a Cell which the UE is attached, in this way
can the S1 standard Signaling be obtained. As the EPC enabling the IMSI task,
the S1 standard Signaling is created when UE attach the Cell.

IMSI Signaling: In the System Tools->Unified Data Tracing->Task Management

window, select IMSI Signaling and double click or click button, the task
setting dialog will appear, see the figure below.

Figure 4-19Create IMSI task

First, enter task name; second, write the IMSI code and the Trace reference code,

click to add IMSI to Selected Items.

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第6页
秘密▲

Figure 4-20Tracing scope setting

ClickNextbutton, and select the items you want to trace.

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第7页
秘密▲

Figure 4-21Observation object

Click Nextbutton and one new setting dialog will appear.

Just set the End dateyou want to stop trace. The other parameters use default
setting.

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第8页
秘密▲

Figure 4-22Tracing parameter setting

Click Finishbutton,the task setting is finished.Then click to synchronize the


task.Now,you can trace the IMSI level signalings.