Sie sind auf Seite 1von 31

Model Curriculum

1. Supervisor Structure
SECTOR: Construction
SUB-SECTOR: Real Estate and Infrastructure Construction
OCCUPATION: MASONRY
REF ID: CON/Q0111, V1.0
NSQF LEVEL: 6

Supervisor Structure 1
Supervisor Structure
2
TABLE OF CONTENTS

1. Curriculum 01
2. Trainer Prerequisites 17
3. Annexure: Assessment Criteria 18

Supervisor Structure
2
Supervisor Structure
CURRICULUM / SYLLABUS

This program is aimed at training candidates for the job of a “Supervisor Structure”, in the “Construction”
Sector/Industry and aims at building the following key competencies amongst the learner

Program Name Supervisor Structure

Qualification Pack Name


CON/Q0111, v1.0
& Reference ID

Version No. 1.0 Version Update Date 23-08-2017

Preferably 12th standard with 15 years site experience in same


Pre-requisites to occupation for non-trained worker/ 5 years site experience as a certified
Training Foreman Concrete / Foreman Reinforcement / Foreman
Formwork/Foreman Scaffolding for trained worker.
Training Outcomes After completing this programme, participants will be able to:
 Read & interpret drawings, specifications and standards for
structural execution: - Read and interpret drawings, manufacturers’
specification, and work method statement for masonry, bar bending,
scaffolding, shuttering carpentry and concreting works.
 Allocate, monitor tools, equipment and resources for structural
execution work and procure approvals for relevant work:-
Allocating tools, equipment and resources for the execution of
structural works and monitoring them, along with procuring approvals
for the structural execution works.
 Supervise and monitor execution of System/shuttering
Carpentry works: - Supervising and monitoring the execution of
system/shuttering carpentry works on the construction site.
 Supervise and monitor execution of concreting works: -
Supervising and monitoring the execution of various concreting
works being carried out at the site.
 Supervise and monitor execution of bar bending works:-
Supervising and monitoring the execution of various bar bending
works at site
 Supervise and monitor execution of scaffolding works: -
Supervising and monitoring the execution of scaffolding works being
carried out at the site.
 Plan, arrange and manage resources for execution of relevant
work:- Planning, arranging and managing resources for execution of
relevant work
 Plan and organize work to meet expected outcomes:- Organised
working procedure within a team at site
 Supervise, monitor and evaluate performance of subordinates
at workplace: - Supervising, monitoring and evaluating subordinates
performance at site.
 Manage workplace for safe and healthy work environment: -
Importance of Health & Safety aspects, its management & measures
to be followed while working.

Supervisor Structure 1
This course encompasses 10 out of 10 National Occupational Standards (NOS) of “Supervisor Structure”
Qualification Pack issued by “Construction Skill Development Council of India”.
Sr. Equipment
Module Key Learning Outcomes
No. Required
1 Introduction  Introduction to QP/NOS of supervisor 1. Classroom
structure having seating
Theory Duration requirement for
 Role description/ functions of the job role
(hh:mm) 30 people.
08:00  Expected personal attributes from the job 2. Projector
Practical Duration role 3. Blackboard
(hh:mm)  Brief description about course content,
00:00 mode of learning and duration of course
 Future possible progression and career
development provisions on completion of
the course
 computer basics – MS Office, Internet, E-
mail
 Leadership development program
2 Read & interpret Theory:- 1. Classroom
drawings,  Different architectural drawing, structural having seating
specifications and detail drawing and specifications for requirement for
standards for structural masonry, bar bending, concreting, 30 people.
execution 2. Projector
scaffolding and shuttering carpentry
3. Blackboard
Theory Duration works. 4. pencil
(hh:mm)  Procedure to read plan, elevation and
60:00 sectional drawings
Practical Duration  principals involved in reading and
(hh:mm) interpreting various relevant drawings
60:00
 read and interpret drawing for masonry,
Corresponding NOS bar bending, concreting, scaffolding and
Code shuttering carpentry and convert them to
CON/N0132 simple hand sketch
 Simplified sketch preparation from the
architectural drawings
 Work schedule for masonry, bar
bending, concreting, scaffolding and
shuttering carpentry works
 Standards and specifications for
execution masonry, bar bending,
concreting, scaffolding and shuttering
carpentry works.
 Reading of manufacturer’s specification
and work method statement for
masonry, bar bending, concreting,
scaffolding and shuttering carpentry
works.
Demonstration/ Practical :-
 Demonstrate reading & understanding
details from relevant drawings
 Demonstrate reading & understanding
details from schedule of work

Supervisor Structure 2
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Demonstrate reading & understanding
specification and standards provided for
relevant works
 Demonstrate reading & understanding
of specification provided in the relevant
drawing
 Demonstrate reading & understanding
of schedule provided for completion of
work
 Demonstrate reading & understanding
of method statement for execution of
work
 Demonstrate reading & understanding
of manufactures specification for
operation of power tools
 Calculate quantity of materials, time
and resources required from relevant
schematic working drawings
 Demonstrate process to convey
structural changes to workman by
making a simplified sketch
3 Allocate, monitor tools, Theory:- **Since the
equipment and  Knowledge of company policies and demonstration/
resources for structural hierarchy for reporting any anomaly practical training is
execution work and  Knowledge of optimum utilization of being conducted
procure approvals for equipment based on usage and on-site to get the
relevant work availability required
 procedure to read relevant structural competencies the
Theory Duration drawings and extract technical tools required will
(hh:mm) specifications related to concreting, bar be acquirable at
44:00 bending, shuttering carpentry, site.
scaffolding works
Practical Duration  Procedure of writing reports for
(hh:mm) submission to concerned authority
00:00
 Details of the process of material
OJT
request and indent
(hh:mm)
 Procedure to determine work methods
44:00
based on best use of relevant
resources
Corresponding NOS
Code  Procedure of optimum utilization and
CON/N0133 allocation of tools, equipment and
resources as per requirement
 Procedure to carry out productivity
calculation
 Productivity norms for various activities
and equipment
 Process of providing status information
 Various types of documentations
required to resource management such
as preparation of indents, material and

Supervisor Structure 3
Sr. Equipment
Module Key Learning Outcomes
No. Required
manpower calculation, preparation of
daily labor reports etc.
 Procedure followed for filling of pre-
approval checklist and post completion
checklists
 Format and procedure for work permit
system
 Procedure followed for obtaining
clearance from various department prior
to commencement of work
 Procedure to prepare sketches on
relevant work from drawings
 Procedure to providing mobilization
order to sub-contractors
 how to maintain record and file for
relevant work
 Procedure for Attending Snag list
/rectifications in time before handing
over of work for other activities like
finishing, MEP etc.

Demonstration/ Practical :-
 Demonstrate calculation of manpower,
tools, and materials required for the
task
 notify concerned superior of resources
and equipment needs
 determine method of lifting, route and
mode of transportation of relevant
materials from stock yard to erection
point
 Demonstrate allocation of manpower to
various activities on the basis of work
requirement
 check completed works ensure its
compliance as per drawing and quality
thereby ensuring productivity of
manpower
 Provide instructions to workmen on the
safe and correct use of tools and
equipment as per manufacturer’s
instructions /specification
 Demonstrate reporting to the concerned
authorities for equipment breakdown,
discrepancies found in the jobs
 provide status information on work
received, in progress, backlog, and
work assignments completed as
requirement
 Demonstrate procedure to coordinate
between various departments for
execution of work
 Demonstrate process of taking
approval from concerned authority

Supervisor Structure 4
Sr. Equipment
Module Key Learning Outcomes
No. Required
before allocation of resource and
material
 Demonstrate process of taking safety
clearance from EHS department before
commencing work
 Demonstrate process of taking
clearance from services department
before commencing work
 Demonstrate process of taking
reviewing estimates, preparing
sketches and reports on labor
expenditures and materials used
 provide documentation to concerned
superior for preparation of project
deliverables to client
 Demonstrate process of taking carrying
out checks and fill checklist after
completion of work
4 Supervise and monitor Theory:- **Since the
execution of  General arrangement demonstration/
System/Shuttering drawing/numeration drawings and practical training is
Carpentry works formwork drawing being conducted
on-site to get the
Theory Duration  Guidelines provided in Indian Standard required
(hh:mm) code of practice applicable for competencies the
74:00 shuttering carpentry tasks tools required will
 Sequential activity for shuttering of be acquirable at
Practical Duration site.
(hh:mm) different structural elements using
00:00 various types of formwork system
OJT  Visual quality checks for timber and
(hh:mm) plywood and other formwork materials
74:00  Wooden shutter making, fabrication of
Corresponding NOS wooden/steel shutter boards
Code  Staging for shuttering works, placing
CON/N0134 and fixing of shutter as per drawings
 Tools, consumables, materials and
equipment related to shuttering
carpentry works
 Procedure for installation, operations for
jump form system including use of
cranes and hydraulic system
 Safe rigging procedures ensuring safe
lifting, lowering and shifting of heavy
materials
 Storing and stacking of formwork
material
 Productivity norms for shuttering
carpentry works
 Man, materials and machinery
requirement

Supervisor Structure 5
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Environment, Health and safety
Demonstration/ Practical :-
 Demonstrate reading of numeration
/general arrangement drawing
 Demonstrate reading of formwork
drawing
 Demonstrate use of advance power
tools related to formwork carpentry
 Demonstration visual quality check for
timber, plywood and other formwork
material
 Demonstration for checking of wooden
shutter boards for their size, support ,
stability
 Demonstration for checking of
fabricated metal shutter boards
 Demonstration for checking of staging
and other associated support
 Demonstrate how to carried out
checking for shuttering within tolerance
as per drawing
 Describe procedure of installation and
operation for jump form system
 Describe standard method for loading,
unloading, storing and stacking of
formwork material in yard/site and
identification of wrong handling of
formwork material
 Calculation of man, and time
requirement based on productivity
norms for shuttering work
 Calculation of shuttering material
 Demonstration of generic and trade
safety
 HSE compliance related to shuttering
works
5 Supervise and monitor Theory:- **Since the
execution of concreting  Guidelines provided in Indian Standard demonstration/
works code of practice applicable for practical training is
being conducted
Theory Duration concreting tasks i.e. standard tolerance
on-site to get the
(hh:mm) levels for all aspects of concreting work required
74:00 (including pouring, screening, levelling competencies the
and finishing) tools required will
 be acquirable at
Practical Duration Procedure to measure and check lines
site.
(hh:mm) and levels for maintaining layout and
00:00 alignment
OJT
(hh:mm)

Supervisor Structure 6
Sr. Equipment
Module Key Learning Outcomes
No. Required
74:00  standard practices, materials, and
methods of the various concreting
Corresponding NOS
procedures for various type of finish
Code
CON/N0135 ,complex structure, slip form concreting
,hot and cold weather concreting
practices
 Different tools and equipment and their
use in concreting works
 Various structural drawings relevant to
concreting works
 methodology for estimation of required
resource and material
 difference and comparison between pre
cast and in situ concreting works
 basic properties and mix proportions of
concrete
 appropriate proportions for the mixing of
concrete to ensure consistency
 methodology for checking line ,level
and alignment for various concreting
 methodology of concreting works in
horizontal, vertical and inclined surfaces
 different type of high quality concrete
finish
 sequence of pour
 variation of slump w.r.t rate of pour
 Details of different type of vibrators
used(internal/external vibrators),their
accessibility and influence area
 Process of concrete vibration in
congested areas
 Details on construction joints/cold joints
 Different curing technique of form
finished concrete self-compact concrete
 Difference in initial, final setting of
concrete and their checks
 Procedure for setting of pump and
connecting concrete pipe lines and its
different types of connections, staging
requirements of pipe line for high raise
structure.
 Process and correct positioning of the
pump hose when pumping the SCC

Supervisor Structure 7
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Methodology for hot/cold weather
concreting works
 Pre & post pour checks for concreting
operation
 Various major risks associated with hot
and cold weather concrete
Demonstration/ Practical :-
 Demonstrate planning and scheduling
of projects by making schedule plan
 estimate time and materials required for
task
 Demonstrate process of maintaining
records and file and carry out
preparation of reports for concreting
works
 Demonstrate supervision of concreting
task such as form finish concrete
structure, complex structure, slip form
concreting and concreting in extreme
weather
 Carry out estimates of personnel
required for a job
 Demonstrate checks to inspect work
progress, equipment to ensure work as
per quality and safety
 Demonstrate recording of information
such as personnel, production, or
operational data, details of the
concreting works covering grade of
concrete, area and volume of pour,
number of workers ,tools and
equipment deployed for work and
achieved productivity on specified forms
or reports
 Carry out analysis of the more complex
construction or repair jobs to determine
methods and materials
 Carry out coordinating work activities
with other construction project activities
 Carry out coordinating with batching
plant and construction site confirming
continuity of supply of concrete
 check, inspect and ensure completion
of preparatory works prior to concreting
at construction site/yard
 Perform checks to inspect bracing and
shoring of concrete forms to ensure

Supervisor Structure 8
Sr. Equipment
Module Key Learning Outcomes
No. Required
their stability before and during pouring

 Perform checks to inspect the fixing and


setting of pump line ,machinery for
pouring of concrete
 Provide instruction on the use of
suitable type of pump w.r.t the
discharge and head of concrete
 indicate positions for pouring chutes
and runways, cranes, or paving
machines to facilitate conveying
concrete from mixer to forms
 direct and monitor workers who spread,
vibrate, screed, and float concrete to
ensure that concrete is compacted to
desired consistency and surface is
finished to specified uniformity and
smoothness
 check for bulking and loose formwork
during concreting
 Perform checks to ensure execution of
concreting in extreme hot/cold weather
6 Supervise and monitor Theory:- **Since the
execution of bar-  Understanding of general arrangement demonstration/
bending works /numeration drawings and bar bending practical training is
schedule being conducted
Theory Duration on-site to get the
(hh:mm)  Standard operation procedure for power required
74:00 tools and CNC machine for cutting and competencies the
bending machines tools required will
Practical Duration  Sequence of fixings and fixing of rebar’s be acquirable at
(hh:mm) for different types of structural elements site.
00:00
 Sequential activity for placing and fixing
OJT
(hh:mm) of inserts, sleeves, conduits and anchors
74:00  Tools, consumables, materials and
equipment related to bar bending works
Corresponding NOS  Unloading process of steel
Code reinforcement at the yard
CON/N0136
 Storing and stacking of reinforcement
steel at the yard
 Monitoring of reinforcement works at
yard
 Methods of mechanical connection of
rebar
 Pre-fabricated cage and their erection
process
 Optimization of cut steel rods

Supervisor Structure 9
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Productivity norms for reinforcement
works
 Man, materials and machinery
requirement
 Scaffolding works for working platforms
and access.
 Environment, Health and safety
Demonstration/ Practical :-
 Demonstrate reading of numeration
/general arrangement drawing
 Demonstrate reading of bar bending
schedule
 Demonstrate use of power tools for
cutting and bending of reinforcement bar
 Describe the working procedure of CNC
machine for cutting and bending of
reinforcement steel and stirrups making
 Demonstrate the inputs method in the
CNC machine *
 Describe reinforcement steel work
procedure related to placing and fixing
for different types of structures and their
element
 Describe standard method for storing
and stacking of reinforcement steel in
yard and identification of wrong handling
of reinforcement steel
 Monitoring of reinforcement steel works
in yard/site (cutting, bending, tagging)
 Demonstration of different types
mechanical coupler fixing
 Demonstrate the pre-fabricated rebar
cage making and erection process.
 How to organize cutting of steel based
on cutting length requirement
 Calculation of man and time requirement
based on productivity norms for
reinforcement works
 Calculation of reinforcement steel
 Demonstration of generic and trade
safety
 HSE compliance related to
reinforcement works
Note : Points marked with asterisk can be
checked if facility is available for CNC
machine

Supervisor Structure 10
Sr. Equipment
Module Key Learning Outcomes
No. Required
7 Supervise and monitor Theory **Since the
execution of  General arrangement demonstration/
Scaffolding works drawing/numeration drawings and practical training is
being conducted
formwork drawing
Theory Duration on-site to get the
(hh:mm)  Sequential activity for scaffolding using required
74:00 various types of scaffolding competencies the
system(Cup-lock, frame scaffolding, tools required will
customized scaffolding) be acquirable at
Practical Duration  Visual quality checks for scaffolding site.
(hh:mm)
materials
00:00
OJT  Visual quality checks for ground
(hh:mm) compactness
74:00  Knowledge on Materials and
components of different types of
Corresponding NOS scaffolding system & standard
Code
procedures of erection (Cup-lock, Tube
CON/N0137
& clamp ,Ring lock ,Wedge lock ,Frame
scaffolding & customized scaffolding)
 Tools, consumables and equipment
related to scaffolding works
 Scaffolding material lifting , lowering
and shifting
 Storing and stacking of scaffolding
material
 Productivity norms for scaffolding works
 Man, materials and machinery
requirement
 Safety hazards related to scaffolding
(pinch points, hot surfaces, electrical )
and prevention against them
 Knowledge of Scaffold inspection.
 Environment, Health and safety
Demonstration/ Practical :-
 Demonstrate reading of scaffolding
drawing
 Demonstration visual quality check for
scaffolding material
 Demonstration visual quality check for
ground compactness
 Demonstration for checking of
scaffolding and other associated
support
 Demonstrate how to check erected
scaffolding as per drawing
 Describe procedure of installation and
operation for jump form system

Supervisor Structure 11
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Describe standard method for loading,
unloading, storing and stacking of
formwork material in yard/site and
identification of wrong handling of
formwork material
 Calculation of man and time
requirement based on productivity
norms for scaffolding works
 Calculation of scaffolding material
 Demonstration of generic and trade
safety
8 Plan, arrange and Theory: -
manage resources for  Method of estimating quantities and
execution of relevant determining quantum of work
work  Knowledge of Productivity Norms for
Theory Duration various activities
(hh:mm)  Method of resource calculation and
24:00 ascertaining timelines for assigned task
 Method of submitting the requirement to
Practical Duration seniors
(hh:mm)
 Method of to identifying priority and
00:00
OJT critical activity of a task
(hh:mm)  Method and technique on briefing team
24:00 members about relevant work
 Importance of daily productivity report
and its preparation
Corresponding NOS
Code  Importance of daily attendance register
CON/N7001 and its preparation
 Method of calculation of quantum of
relevant work
 Method of calculation of tools and
material requirement
 Method of optimization of available
resources
 Different check to evaluate progress and
quality of relevant works
 Organizing resources and quality
checks to be performed as per
requirement of the structural execution
works

Demonstration/ Practical (D/P) :-


 Prepare work schedule as per
planning
 Determine quantum of work and
calculate manpower required for work.

Supervisor Structure 12
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Submit manpower requirement to
seniors and procure approval of the
same.
 Allocate resources for the work
 Allocate material , equipment and tools
to workmen and extract the work as
per plan
 Provide clear instruction to workman
and extract work as per schedule.
 Explain deviation in works and justify
the same
 Minimize wastage as per standard
working method
 Prepare format for daily labour
attendance
 Prepare format for daily productivity
report and calculate the daily
productivity for a given work
9 Plan and organize work Theory: - **Since the
to meet expected  Method of resource planning and demonstration/
outcomes ascertaining timelines for assigned task practical training is
 Organizing resources and quality being conducted
on-site to get the
Theory Duration checks to be performed as per required
(hh:mm) requirement of the structural execution competencies the
24:00 works tools required will
 Method of preparation of work schedule be acquirable at
 Method of estimation of resources from site.
Practical Duration
drawings/ schedules
(hh:mm)
00:00  Monitoring procedure of ongoing works
OJT and inspection of completed works to
(hh:mm) ensure compliance with all safety and
24:00 quality parameters
Corresponding NOS  Method of preparation of observation
Code
data sheet, inspection report
CON/N8002
 Method of reconcile material used for
assigned task
 Method of preparation of budget for
structural execution works

Demonstration/ Practical (D/P) :-


 Prepare work schedule as per
planning
 Arrange material and required tools/
fixtures prior to start any work
 Explain deviation in works and justify
the same

Supervisor Structure 13
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Suggest alternative arrangement/ use
of equipment in case of emergency
situation
 Coordinate with subordinates and
different trade personnel
 Minimize wastage as per standard
working method
10 Supervise, monitor and Theory: - **Since the
evaluate performance  Setting up timelines for completion of demonstration/
of subordinates at activities as per resource deployed and practical training is
workplace productivity norms being conducted
on-site to get the
 Managing manpower and allocation of required
manpower as per deadline provided for competencies the
Theory Duration assign task tools required will
(hh:mm)  Critical quality aspects to be checked in be acquirable at
24:00 the ongoing/ completed structural site.
execution works
Practical Duration  How to provide timely instructions to the
(hh:mm) subordinates during ongoing structural
00:00 execution works
OJT  How to evaluate strengths and
(hh:mm) weakness of subordinate workers and
24:00 utilize them appropriately as per job
requirement
Corresponding NOS  Method of supervising activities to
Code increase
CON/N8003 productivity of workers and achieving set
quality and safety standards for the
structural execution works
Demonstration/ Practical (D/P): -
 Instruct subordinates for applicable
working methods and safety norms for
assigned structural execution works
 Seek work related clarifications from
subordinates and provide support/
guidance as per requirement of the job
 Observe each subordinate as per their
strength and weaknesses and deploy
them as per criticality/ emergency of the
job
 Implement organizational/ quality /
safety work methods while undertaking
any job and ensure compliance to the
same by subordinates

11 Manage workplace for Theory: - 1. Safety Helmets


safe and healthy work  Types of hazards involved in 2. Face shield
environment construction sites 3. Overalls

Supervisor Structure 14
Sr. Equipment
Module Key Learning Outcomes
No. Required
 Types of hazards involved in structural 4. Knee pads
execution works 5. Safety shoes
Theory Duration  Process of hazard analysis for 6. Safety belts
(hh:mm) 7. Safety harness
24:00 structural execution works 8. Safety Gloves
 Detailed safety norms as per standard 9. Safety goggles
practice and organizational policy, 10. Particle masks
Practical Duration procedure of providing CPR, first aids, 11. Ear Plugs
(hh:mm) use of regular and job specific PPEs as 12. Reflective
00:00 per requirement jackets
OJT 13. Fire
(hh:mm)  classification of fire and use of fire Extinguisher
24:00 protection devices 14. Fire prevention
 Emergency safety control measures kit
Corresponding NOS and actions to be taken under 15. First Aid box
Code emergency situation 16. Safety tags
CON/N9002 17. Safety Notice
 Concept of: -
board
1. First Aid process
2. Use of fire extinguisher **Since the
3. Classification of fires and fire demonstration/
extinguisher practical training is
4. Safety drills being conducted
5. Types and use of PPEs as per on-site to get the
required
general and structural execution
competencies the
works safety norms tools required will
 Reporting procedure to the concerned be acquirable at
authority in emergency situations site.
 Standard procedure of handling,
storing and stacking material, tools and
equipment for structural execution
works
 What is safe disposal of waste, type of
waste and their disposal
 Type of power tools ,their power ratings
and area of application
 basic ergonomic principles as per
applicability

Demonstration/ Practical (D/P): -


The skills will be developed and practiced
while carrying out following trade related
activities in a predictable and familiar
working condition.
 Fill structural execution works permits
and work approval documents
 Selection of PPEs and use them
appropriately as per working need of
structural execution works, handling,
storing, stacking and shifting of

Supervisor Structure 15
Sr. Equipment
Module Key Learning Outcomes
No. Required
materials, tools and equipment used for
structural execution works
 Selection of PPEs and use them
appropriately as per working need of
cutting and bending bars, drilling in
stones, , etc.
 Analysis of hazards involved in
structural execution works circuits/
connections by external effects and
taking necessary steps or informing to
seniors
 Identification of locations, situations/
circumstances, malpractices which can
be hazardous for general or structural
execution works
 Selection of fire extinguisher based on
classification of fire, standard practice
of storing & stacking firefighting
equipments/ materials at work locations
 Disposal of waste materials as per their
nature and effects on weather.
Total Duration
**Since the demonstration/ practical training is being conducted
Theory Duration on-site to get the required competencies the tools required will be
504:00 acquirable at site.
Infrastructure
Classroom for theory and assessment with 30 study chairs
Practical Duration ,Workshop/Mock-up yard for practical training and assessment
60:00 ,Toilet/Urinals (Separate for gents and Ladies), 3 phase power
supply points , Single phase power supply points, Fire
extinguishers (mechanical foam, DCP, CO2 and sand buckets
with stand), First aid kit, Tool box with lock and key

PPEs
Safety Helmets, Face shield, Overalls, Knee pads, Safety shoes,
Safety belts, Safety harness, Safety Gloves, Safety goggles,
Particle masks, Ear Plugs, Reflective jackets, Fire Extinguisher,
Fire prevention kit, First Aid box, Safety tags, Safety Notice
board

Grand Total Course Duration: 1000 Hours, 0 Minutes


{Including Mandatory 436 hours of OJT (project site experience)}

(This syllabus/ curriculum has been approved by Construction Skill Development Council of India)

Supervisor Structure 16
Trainer Prerequisites for Job role: “Supervisor Structure” mapped to
Qualification Pack: “CON/Q0111, v1.0”

Sr.
Area Details
No.
1 Description To deliver accredited training service, mapping to the curriculum detailed
above, in accordance with the Qualification Pack “CON/Q0111”.
2 Personal Aptitude for conducting training, and pre/ post work to ensure competent,
Attributes employable candidates at the end of the training. Strong communication
skills, interpersonal skills, ability to work as part of a team; a passion for
quality and for developing others; well-organised and focused, eager to learn
and keep oneself updated with the latest in the mentioned field
3 Minimum ITI/12th standard pass
Educational
Qualifications
4a Domain Trainer/Assessor- 70% in each NOS of Qualification Pack “CON/Q0111” &
Certification 80% overall , Lead trainer/Lead Assessors- 70% in each NOS of Qualification
Pack “CON/Q0111” & 90% overall
4b Platform Trainer/Assessor-80% in each NOS of Qualification Pack “MEP/Q0102” or
Certification “MEP/Q0104”, Lead trainer/ Lead Assessors- 90% in each NOS of
Qualification Pack “MEP/Q0101” or “MEP/Q0103”and overall 90%
5 Experience i. Technical Degree holder with minimum three years of Field experience
and preferably two years of teaching experience or,
ii. In case of a Diploma Holder five years of field experience and preferably
two years of teaching experience or,
iii. In case of ITI/12th pass minimum eight years of field experience and
preferably two years of teaching Experience.

Supervisor Structure 17
CRITERIA FOR ASSESSMENT OF TRAINEES
Job Role Supervisor Structure
Qualification Pack CON/Q0111
Sector Skill Council Construction

Guidelines for Assessment


1. Criteria for assessment for each Qualification Pack will be created by the Sector Skill Council. Each
Performance Criteria (PC) will be assigned marks proportional to its importance in NOS. SSC will also lay down
proportion of marks for Theory and Skills Practical for each PC.
2. The assessment for the knowledge part will be based on knowledge bank of questions created by Assessment
Bodies subject to approval by SSC
3. Individual assessment agencies will create unique question papers for knowledge/theory part for assessment
of candidates as per assessment criteria given below
4. Individual assessment agencies will create unique evaluations for skill practical for every student at each
examination/training centre based on assessment criteria.
5. The passing percentage for each QP will be 70%. To pass the Qualification Pack, every trainee should score a
minimum of 70% individually in each NOS.
6. The Assessor shall check the final outcome of the practices while evaluating the steps performed to achieve
the final outcome.
7. The trainee shall be provided with a chance to repeat the test to correct his procedures in case of improper
performance, with a deduction of marks for each iteration.
8. After the certain number of iteration as decided by SSC the trainee is marked as fail, scoring zero marks for
the procedure for the practical activity.
9. In case of successfully passing only certain number of NOSs, the trainee is eligible to take subsequent
assessment on the balance NOSs to pass the Qualification Pack within the specified timeframe set by SSC.
10. Minimum duration of Assessment of each QP shall be of 4hrs/trainee.

Supervisor Structure 18
Marks Allocation

Assessment Total Skills


Assessment Criteria for outcomes Out Of Theory
outcomes Mark Practical
CON/N0132: PC1. read & interpret details from relevant drawings 11 5.5 5.5
Read & interpret PC2. read & interpret details from schedule of work 11 5.5 5.5
drawings, PC3. read and understand specification and standards
specifications 11 5.5 5.5
provided for relevant works
and standards PC4. read and understand all specification provided in
for structural 11 5.5 5.5
the relevant drawing
execution PC5. read and understand schedule provided for
11 5.5 5.5
completion of work 100
PC6. read method statement for execution of work 11 5.5 5.5
PC7. read, understand & follow manufactures
11 5.5 5.5
specification for operation of power tools
PC8. carry out calculation of required quantity of
12 6 6
materials from relevant schematic working drawings
PC9. convey structural changes to workman in the form
11 5.5 5.5
of sketches
Total 100 50 50
CON/N0133: PC1. confirm hours worked and description of work
4 2 2
Allocate, performed for employee with concerned superior
monitor tools, PC2. provide inputs regarding requirements for
equipments and manpower, tools, and materials as per work 4 2 2
resources for requirements
structural PC3. notify concerned superior of resources and
4 2 2
execution work equipment needs
and procure PC4. determine method of lifting, route and mode of
approvals for transportation of relevant materials from stock yard to 4 2 2
relevant work erection point
PC5. determine resources to be used in accordance
with safety practices to be observed during concreting,
100 5 2.5 2.5
bar-bending, scaffolding and masonry, shuttering
carpentry works
PC6. allocate manpower to respective activities on the
4 2 2
basis of work requirement
PC7. ensure productivity of manpower by providing
instruction, checking completed works as per drawing 5 2.5 2.5
and reporting to senior authorities
PC8. instruct workmen on the safe and correct use of
tools and equipments as per manufacturer’s 5 2.5 2.5
instructions /specification
PC9. report efficiently to the concerned authorities for
5 2.5 2.5
equipment breakdown, discrepancies found in the jobs

Supervisor Structure 19
PC10. provide status information on work received, in
progress, backlog, and work assignments completed as 5 2.5 2.5
requirement
PC11. inform the concerned superior on specific areas
where the work needs to be adjusted in accordance 5 2.5 2.5
with site conditions and material deliveries
PC12. coordinate between various departments for
4 2 2
execution of work
PC13. take approval from concerned authority before
5 2.5 2.5
allocation of resource and material
PC14. take safety clearance from EHS department
4 2 2
before commencing work
PC15. take clearance from services department before
4 2 2
commencing work
PC16. ensure all pre preparatory works have finished
4 2 2
before starting work
PC17. review estimates, prepares sketches and reports
4 2 2
on labor expenditures and materials used
PC18. provide documentation to concerned superior
5 2.5 2.5
for preparation of project deliverables to client
PC19. carry out checks and fill checklist after
4 2 2
completion of work
PC20. provide clearance and mobility order to
subcontractors for mobilization of resource and 4 2 2
material at next workspace
PC21. maintain records and files and prepare reports
4 2 2
on labour deployment, work done and productivity
PC22. ensure proper quality of work within agreed
4 2 2
timeline
PC23. ensure that rectifications ( if any ) are carried out
4 2 2
in time
Total 100 50 50
CON/N0134: PC1. read & interpret drawings, formwork specification
4 2 2
Supervise and and standards
monitor PC2. assist in sequencing key activities related to
4 2 2
execution of shuttering carpentry works for making schedule
System/shutteri PC3. assist in planning of duration and time require for
3 1.5 1.5
ng Carpentry identified key activities
works PC4. keep records of carpenters' time and materials
4 2 2
used for each job
100
PC5. supervise closely carpentry jobs requiring a high
4 2 2
degree of skill
PC6. ensure survey works and preparatory works are
4 2 2
complete so as to provide required level & reference
PC7. check and ensure quality of plywood & timber
4 2 2
prior to use
PC8. ensure availability of all tools, components,
3 1.5 1.5
materials & fixture for assembling of shutters

Supervisor Structure 20
PC9. check & ensure shutter is fabricated as per
4 2 2
workshop drawing
PC10. check & ensure all components & fixture are
4 2 2
fixed properly
PC11. check and ensure erected formwork is as per
4 2 2
specified standards
PC12. ensure that appropriate procedure is followed
while erecting formwork and while installing necessary 4 2 2
supports, braces, penetrations, embedded parts, etc
PC13. check provision for lifting arrangement are
4 2 2
provided in case of lifting of heavy weight formwork
PC14. monitor installation of jump form system using
4 2 2
cranes or hydraulic system
PC15. monitor operation of jump form system 4 2 2
PC16. monitor proper functioning of hydraulic jack and
4 2 2
cranes
PC17. monitor lifting ensuring line, level & alignment 4 2 2
PC18. monitor rising of formwork using hydraulic jacks
4 2 2
and cranes
PC19. ensure lifting & lowering of formwork material
4 2 2
using crane is done safely and appropriately
PC20. ensure all working platform are safe for
4 2 2
performing shuttering activity
PC21. ensure safe storage and stacking of formwork
3 1.5 1.5
components
PC22. ensure that formwork is dismantled sequentially
4 2 2
and safety after receiving
PC23. ensure that all manufacturer’s instructions/
specification are followed while dismantling 3 1.5 1.5
standardized formwork
PC24. provide assistance on complex jobs and ensure
proper erection and dismantling of shuttering and 4 2 2
formwork system
PC25. provide estimates of personnel and material
4 2 2
required for a job
PC26. keep records and compiles reports of work
4 2 2
performed by carpentry crew
Total 100 50 50
CON/N00135: PC1. plan and schedule projects, estimate time and
Supervise and materials, supervise subordinates, maintain records 5 2.5 2.5
monitor and file and prepare reports for concreting works
execution of PC2. supervise closely concreting task requiring high 100
concreting degree of skill such as form finish concrete structure,
5 2.5 2.5
works complex structure, slip form concreting and concreting
in extreme weather

Supervisor Structure 21
PC3. provide estimates of personnel and material
5 2.5 2.5
required for a job
PC4. inspect work progress, equipment, or
construction sites to verify safety or to ensure that 5 2.5 2.5
specifications are met
PC5. record information such as personnel, production,
5 2.5 2.5
or operational data on specified forms or reports
PC6. analyzes the more complex construction or repair
5 2.5 2.5
jobs to determine methods and materials
PC7. coordinate work activities with other construction
5 2.5 2.5
project activities
PC8. coordinate with batching plant and construction
5 2.5 2.5
site confirming continuity of supply of concrete
PC9. reads specification sheets for information, such as
sizes of aggregates and proportions of cement and
5 2.5 2.5
water required, to ensure that concrete is mixed
according to specifications
PC10. check, inspect and ensure completion of
preparatory works prior to concreting at construction 5 2.5 2.5
site/yard
PC11. inspects bracing and shoring of concrete forms
5 2.5 2.5
to ensure their stability before and during pouring
PC12. inspect the fixing and setting of pump line
5 2.5 2.5
,machinery for pouring of concrete
PC13. instruct of the use of suitable type of pump w.r.t
5 2.5 2.5
the discharge and head of concrete
PC14. record details of the concreting works covering
grade of concrete, area and volume of pour, number of
5 2.5 2.5
workers ,tools and equipment deployed for work and
achieved productivity
PC15. indicates positions for pouring chutes and
runways, cranes, or paving machines to facilitate 5 2.5 2.5
conveying concrete from mixer to forms
PC16. directs workers who spread, vibrate, screed, and
float concrete to ensure that concrete is compacted to
5 2.5 2.5
desired consistency and surface is finished to specified
uniformity and smoothness
PC17. check for bulking and loose formwork during
5 2.5 2.5
concreting
PC18. ensure execution of concreting in extreme
hot/cold weather as per standard practices and 5 2.5 2.5
specification
PC19. examines concrete, after forms are stripped, and
gives instruction to workers to repair defects, such as 5 2.5 2.5
roughness and honeycombed appearance
PC20. prescribe methods for curing concrete, such as
5 2.5 2.5
covering surface of green (fresh) concrete with burlap,

Supervisor Structure 22
plastic, earth, straw, or chemical compound, to prevent
green concrete from drying out rapidly or freezing
Total 100 50 50
CON/N0136: PC1. plan and schedule projects, estimate time and
Supervise and materials, supervise subordinates, maintain records 4 2 2
monitor and file and prepare reports for bar bending works
execution of bar- PC2. supervise bar bending task requiring high degree
4 2 2
bending works of skill
PC3. provide estimates of personnel and material
3 1.5 1.5
required for a job
PC4. inspect work progress, equipment, or
construction sites to verify safety or to ensure that 4 2 2
specifications are met
PC5. record information such as personnel, production,
3 1.5 1.5
or operational data on specified forms or reports
PC6. coordinate work activities with other construction
3 1.5 1.5
project activities
PC7. read, understand & follow manufactures
specification for operation of power tools and CNC 4 2 2
machine for cutting and bending
PC8. carry out weighing of steel reinforcement before
4 2 2
unloading at site in coordination with the stores
PC9. ensure standard practices for storing and stacking
3 1.5 1.5
of reinforcement steel at the yard
PC10. monitor all rebar’s cutting and bending activity
4 2 2
at yard 100
PC11. ensure bundling/tagging and stacking of cut &
4 2 2
bent bars as per bar marking the BBS
PC12. ensure all tools, tackles, consumables, materials
and equipments are available before commencement 4 2 2
of work
PC13. ensure scaffolding is complete as per required /
specified heights/requirements, method, load carrying 4 2 2
capacity, etc
PC14. ensure working platforms and access stairs are
3 1.5 1.5
safe for working
PC15. ensure completion of surveying, marking and
4 2 2
preparatory arrangement
PC16. check and ensure use of approved BBS for
4 2 2
execution of reinforcement work
PC17. optimize use of already available cut steel rods
3 1.5 1.5
to minimize wastage
PC18. plan sequence of insertion and fixing of rebars
4 2 2
for different types of structures
PC19. co-relate the sequence of reinforcement placing
4 2 2
with fixing of inserts, sleeves, conduits and anchors
PC20. check and ensure correct ties used for tying of
4 2 2
reinforcement

Supervisor Structure 23
PC21. inspect and check quality of mechanical
4 2 2
connections of rebar
PC22. inspect and check the quality of pre-fabricated
4 2 2
reinforcement cage & erection process
PC23. ensure rebars, cast-in items, corrugated sleeve
pipes, recesses, lifting hooks and inserts are correctly
4 2 2
positioned and properly secured, within specified
tolerance levels
PC24. ensure that the joints and edges of the mould,
bolts, stoppers, tie rods, side props and rubber seal are 4 2 2
intact and properly secured
PC25. check for stiffening of cage before lifting for
4 2 2
stacking/erection
PC26. ensure completion of work as per agreed time
3 1.5 1.5
schedule and quality
PC27. maintain productivity report for executed work 3 1.5 1.5
Total 100 50 50
CON/N0137: PC1. plan and schedule projects, estimate time and
Supervise and materials, supervise subordinates, maintain records 4 2 2
monitor and file and prepare reports for scaffolding works
execution of PC2. supervise scaffolding task requiring high degree of
4 2 2
scaffolding skill
works PC3. provide estimates of personnel and material
3 1.5 1.5
required for a job
PC4. inspect work progress, equipment, or
construction sites to verify safety or to ensure that 4 2 2
specifications are met
PC5. record information such as personnel, production,
4 2 2
or operational data on specified forms or reports
PC6. coordinate work activities with other construction
4 2 2
project activities
PC7. ensure completion of surveying, marking and
100 4 2 2
other preparatory arrangement
PC8. ensure all tools, tackles, consumables,
components, materials and fixtures are available 3 1.5 1.5
before commencement of work
PC9. ensure that standard procedure is followed during
4 2 2
erection of scaffold
PC10. ensure lifting & lowering of scaffold material
manually or by using crane is done safely and 4 2 2
appropriately
PC11. ensure height of scaffold erected is within
4 2 2
permissible limits
PC12. ensure all working platform are properly fixed for
4 2 2
carrying out subsequent activity
PC13. check scaffold is resting on a firm base and well
4 2 2
compacted ground

Supervisor Structure 24
PC14. check erected scaffold is in plumb and level as
4 2 2
per requirements
PC15. check scaffold for rigidity and ensured stability 4 2 2
PC16. check ladder or stairway has been attached for
4 2 2
access
PC17. ensure scaffolds are used only for intended
4 2 2
purpose
PC18. ensure maintenance of safety protocol while
4 2 2
using or accessing scaffold
PC19. check positioning of scaffold so as not to contact
4 2 2
energized power line
PC20. check all guardrails, toe board, walk way boards,
4 2 2
fall protection are in place to ensure safety
PC21. check for other safety hazards (pinch points, hot
3 1.5 1.5
surfaces, electrical) if any and prevention against them
PC22. check scaffold is tagged for its purpose (safe for
4 2 2
use, unsafe for use, scaffold incomplete)
PC23. check and ensure scaffold is supported with
permanent structure at regular interval as per standard 3 1.5 1.5
practices
PC24. check scaffold with respect to inspection
4 2 2
checklist
PC25. record details of erected scaffold and document
4 2 2
inspection checklist
PC26. check positioning of scaffold so as not to contact
4 2 2
energized power line
Total 100 50 50
CON/N7001: PC1. determine quantum and nature of work under
Plan, arrange 5 2.5 2.5
assigned activity
and manage PC2. calculate requirement of manpower for assigned
resources for activities 8 4 4
execution of
relevant work
PC3. submit manpower requirement to superiors
5 2.5 2.5

PC4. allocate and extract work as per plan


8 4 4

PC5. provide clear instructions to workmen for 100


execution of work 8 4 4

PC6. ensure optimum utilization of manpower


resources 8 4 4

PC7. record the daily labour attendance


8 4 4

PC8. record the daily productivity report


8 4 4

Supervisor Structure 25
PC9. estimate quantity of assigned work
8 4 4

PC10. estimate requirement for material, components


and fixtures 8 4 4

PC11. estimate equipment, tools and accessories


required 8 4 4

PC12. submit material, equipment and tool


requirement to superiors 8 4 4

PC13. allocate material , equipment and tools to


workmen and extract the work as per plan 8 4 4

PC14. provide clear instructions for optimized use of


resources 8 4 4

Total 100 50 50

CON/N8002: PC1. understand clearly the targets and timelines set by


Plan and superiors 13 6.5 6.5
organize work to PC2. plan activities as per schedule and sequence
meet expected 10 5 5
outcomes

PC3. provide guidance to the subordinates to obtain


13 6.5 6.5
desired outcome

PC4. plan housekeeping activities prior to and post


completion of work 8 4 4

PC5. list and arrange required resources prior to


commencement of work 10 5 5
100
PC6. select and employ correct tools, tackles and
equipment for completion of desired work 8 4 4

PC7. complete the work with allocated resources


8 4 4

PC8. engage allocated manpower in an appropriate


manner 5 2.5 2.5

PC9. use resources in an optimum manner to avoid any


unnecessary wastage 5 2.5 2.5

PC10. employ tools, tackles and equipment with care


to avoid damage to the same 5 2.5 2.5

Supervisor Structure 26
PC11. organize work output, materials used, tools and
tackles deployed, 10 5 5

PC12. processes adopted to be in line with the specified


standards and instructions 8 4 4

Total 100 40 60

CON/N8003: PC1. fix expected targets for the respective gang as per
Supervise, site requirements and allocate work to subordinates 15 7.5 7.5
monitor and
evaluate PC2. establish expected performance standards and
performance of expectations for the respective gang of workers to 15 7.5 7.5
subordinates at meet the desired outcomes
workplace PC3. inspect assigned work to the respected gang of
20 10 10
workers through progressive checking
100
PC4. observe and verify the work activities performed
20 10 10
by the subordinates at the construction site
PC5. monitor overall performance of subordinates on
the designed measures to ensure quality requirements 15 7.5 7.5
set by the concerned authority
PC6. ensure adherence to the organizational policies
and procedures for all relevant construction activities 15 7.5 7.5
by the workmen subordinations
Total 100 50 50
CON/N9002: PC1. ensure proper housekeeping at workplace 5 2.5 2.5
Manage PC2. implement safe handling , stacking methods at
workplace for workplace / store 5 2.5 2.5
safe and healthy PC3. insure that health and safety plan is followed by
work all subordinates 5 2.5 2.5
environment PC4. identify any hazard in workplace and notify them
to appropriate authority 5 2.5 2.5
PC5. ensure that all safety and protection installation
are correctly placed & adequate 5 2.5 2.5
PC6. ensure safe access is available at work place for
movement of workers & materials 5 2.5 2.5
PC7. ensure safe use of tools and tackles by the
workmen as per applicability 5 2.5 2.5
PC8. ensure appropriate use of following Personal
100
Protective Equipment (PPE) as per applicability:
 Head Protection (Helmets)

 Ear Protection 10 5 5
 Fall Protection

 Foot Protection

Supervisor Structure 27
 Face and Eye Protection,

 Hand &Body Protection

 Respiratory Protection

PC9. maintain entrances & exit from confined spaces ,


excavated pits and other location in concurrence with 5 2.5 2.5
safety parameters or instruction form safety personals.
PC10. ensure organizational policies and procedures
are followed for health , safety and welfare, in relation
to:
 methods of receiving or sourcing information

 dealing with accidents and emergencies associated


with the work and environment
10 5 5
 reporting

 stooping work

 evacuation

 fire risks and safe exit procedures

PC11. follow procedures for accident recording and


reporting as per organizational and statuary 5 2.5 2.5
requirements
PC12. ensure effective adherence to response to
7.5 3.75 3.75
emergency procedures / protocols
PC13. report any case of emergency / risks to the
7.5 3.75 3.75
concern people at the construction site
PC14. report any perceived risk hazards to the
7.5 3.75 3.75
superiors / concerned EHS
PC15. demonstrate the use of fire protection
7.5 3.75 3.75
equipments for different type of fire hazard
PC16. implement control measures to reduce risk &
5 2.5 2.5
meet legal requirement as per organizational policies
Total 100 50 50

Supervisor Structure 28

Das könnte Ihnen auch gefallen