UBICACIÓN :
AÑO: 2016
TABLA Nº7 COMPUTOS METRICOS
computos metricos
N CODIGO Y DESCRIPCION N° LONG ANCHO ESP MTS PZA
C.028200101
TRANSPORTE DE MAQUINARIA PESADA P/MOVIMIENTO DE
TIERRA, BASES, ASFALTO, PREP. DEL SITIO, DRENAJES, CON
2 PESO DE 10 A 30 TON POR MAQUINA. SE PAGARA UN SOLO VIAJE
DE IDA Y REGRESO POR MAQUINA. NO SE RECONOCERA
CUANDO UNA MAQUINA SEA SUSTITUIDA POR OTRA
H-022.260.S/C
2,377.81 0.40 0.10
5
SUMINSTRO Y COLOCACION DE ARENA EN APOYO TIPO B 220.00 0.30 0.10
U413147016
U413147017
U413147018
U413147020
U413157020
85.60
SUMINISTRO, TRANSPORTE Y COLOCACION DE TUBERIA DE PVC
6 86.14
D=50 mm. (2") (150 lbs/plg2)
171.74
OBRA:
UBICACIÓN :
AÑO: 2016
TABLA Nº7 COMPUTOS METRICOS
computos metricos
N CODIGO Y DESCRIPCION N° LONG ANCHO ESP MTS PZA
U413147022
U413147022
U413147024
ES/C 6
8
5
5
5
8
5
7 CONSTRUCCION DE TOMAS DOMICILIARIAS D = 1/2". INCLUYE
COLOCACION DE ABRAZADERAS, ADAPTADOR MACHO ROSCADO
OBRA:
UBICACIÓN :
AÑO: 2016
TABLA Nº7 COMPUTOS METRICOS
computos metricos
N CODIGO Y DESCRIPCION N° LONG ANCHO ESP MTS PZA
8
7 CONSTRUCCION DE TOMAS DOMICILIARIAS D = 1/2". INCLUYE
5
COLOCACION DE ABRAZADERAS, ADAPTADOR MACHO ROSCADO
3
4
3
1
0
66.00
ES/C
U413157017 15
40
12.5
12.5
12.5
40
12.5
12.5
8 SUMINISTRO, TRANSPORTE Y COLOCACION DE TUBERIA DE PEAD
40
D=20 mm (1/2") NORMA 5 (150 lbs/plg2)
7.5
5
7.5
0
2.5
220.00
U413157017
HC-022.230.021
E313 S/C
10 CARGA CON MAQUINA Y BOTE DE MATERIAL PROVENIENTE DE
LAS EXCAVACIONES PARA, ZANJAS, ETC.
OBRA:
UBICACIÓN :
AÑO: 2016
TABLA Nº7 COMPUTOS METRICOS
computos metricos
10 CARGA CON MAQUINA Y BOTE DE MATERIAL PROVENIENTE DE
N CODIGO Y DESCRIPCION N° LONG ANCHO ESP MTS PZA
LAS EXCAVACIONES PARA, ZANJAS, ETC.
U420376020 1
11 1
SUMINISTRO Y TRANSPORTE DE CODO RAPIDO PEAD 50 mm
2.00
U420476020 8
8
6
6
6
8
6
12 SUMINISTRO Y TRANSPORTE DE TEE RAPIDA PEAD 50 mm 6
8
4
4
4
1
0
75.00
E631010051 3
SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO, TIPO 2
3
2
2
2
2
2
COMPUERTA, DE HF, BBD= 3" PN 10
2
OBRA:
UBICACIÓN :
AÑO: 2016
TABLA Nº7 COMPUTOS METRICOS
computos metricos
COMPUERTA, DE HF, BBD= 3" PN 10
N CODIGO Y DESCRIPCION N° LONG ANCHO ESP MTS PZA
2
2
2
0
0
26.00
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
PESO DE MAQUINARIA PARA
MOVIMIENTO TIERRA
Retroexcavador
peso de la retroexcavadora=
688.80 2viajes*40km*8,61ton
688.80 TOTAL
exc =tuberia principal
exc= long*ancho*profundidad
carrrera 1 entre calle 1 y 2
31.41 R1=(104,71*0,50*0,60)m3
15.45 R2
15.81 (long*ancho*esp)(tramo R1-2)
15.25 (long*ancho*esp)(tramo R3)
28.61 (long*ancho*esp)(tramo R4)
32.96 (long*ancho*esp)(tramo R5)
51.68 (long*ancho*esp)(tramo R6)
16.68 (long*anch*espo)(tramo R7)
44.59 (long*ancho*esp)(tramo R8)
36.64 (long*ancho*esp)(tramo R9)
46.79 (long*ancho*esp)(tramo R10)
58.66 (long*ancho*esp)(tramo R11)
23.64 (long*ancho*sp)(tramo R12)
31.82 (long*ancho*esp)(tramo R1-12)
37.20 (long*ancho*esp)(tramo R13)
19.30 (long*ancho*esp)(tramo R14)
16.53 (long*ancho*esp)(tramo R13-14)
18.37 (long*ancho*esp)(tramo R15)
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
20.13 (long*ancho*esp)(tramo R16)
25.99 (long*ancho*esp)(tramo R17)
35.34 (long*ancho*esp)(tramo R18)
17.63 (long*ancho*esp)(tramo R19)
28.16 (long*ancho*esp)(tramo R20)
13.59 (long*ancho*esp)(tramo R21)
18.21 (long*ancho*esp)(tramo R22)
27.84 (long*ancho*esp)(tramo R23)
16.39 (long*ancho*esp)(tramo R24)
18.61 (long*ancho*esp)(tramo R25)
18.95 (long*ancho*esp)(tramo R26)
50.00 (long*ancho*esp)(tramo R27)
15.38 (long*ancho*esp)(tramo R28)
55.60 (long*ancho*esp)(tramo R29)
13.84 (long*ancho*esp)(tramo R30)
15.77 (long*ancho*esp)(tramo R31)
27.61 (long*ancho*esp)(tramo R32)
2.40 (long*ancho*esp)(tramo R1-32)
962.84 TOTAL
(long*ancho*esp)(tramo R5)
(long*ancho*esp)(tramo R6)
TOTAL
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
(long*ancho*esp)(tramo R27)
(long*ancho*esp)(tramo R29)
TOTAL
(long*ancho*esp)(tramo R6)
(long*ancho*esp)(tramo R8)
(long*ancho*esp)(tramo R9)
(long*ancho*esp)(tramo R10)
(long*ancho*esp)(tramo R11)
(long*ancho*esp)(tramo R1-12)
TOTAL
(long*ancho*esp)(tramo R32)
(long*ancho*esp)(tramo R1-32)
TOTAL
(long*ancho*esp)(tramo R1)
(long*ancho*esp)(tramo R2)
(long*ancho*esp)(tramo R1-2)
(long*ancho*esp)(tramo R3)
(long*ancho*esp)(tramo R13)
(long*ancho*esp)(tramo R14)
(long*ancho*esp)(tramo R15)
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
(long*ancho*esp)(tramo R16)
(long*ancho*esp)(tramo R19)
(long*ancho*esp)(tramo R21)
(long*ancho*esp)(tramo R22)
(long*ancho*esp)(tramo R24)
(long*ancho*esp)(tramo R28)
(long*ancho*esp)(tramo R30)
(long*ancho*esp)(tramo R31)
TOTAL
(long*ancho*esp)(tramo R4)
(long*ancho*esp)(tramo R5)
(long*ancho*esp)(tramo R6)
(long*anch*espo)(tramo R7)
(long*ancho*esp)(tramo R8)
(long*ancho*esp)(tramo R9)
(long*ancho*esp)(tramo R10)
(long*ancho*esp)(tramo R11)
(long*ancho*sp)(tramo R12)
(long*ancho*esp)(tramo R1-12)
(long*ancho*esp)(tramo R13-14)
(long*ancho*esp)(tramo R17)
(long*ancho*esp)(tramo R18)
(long*ancho*esp)(tramo R20)
(long*ancho*esp)(tramo R23)
(long*ancho*esp)(tramo R25)
(long*ancho*esp)(tramo R26)
(long*ancho*esp)(tramo R27)
(long*ancho*esp)(tramo R29)
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
(long*ancho*esp)(tramo R32)
(long*ancho*esp)(tramo R1-32)
TOTAL
(long*ancho*esp)(tramo R1)
(long*ancho*esp)(tramo R2)
(long*ancho*esp)(tramo R1-2)
(long*ancho*esp)(tramo R3)
(long*ancho*esp)(tramo R13)
(long*ancho*esp)(tramo R14)
(long*ancho*esp)(tramo R15)
(long*ancho*esp)(tramo R16)
(long*ancho*esp)(tramo R19)
(long*ancho*esp)(tramo R21)
(long*ancho*esp)(tramo R22)
(long*ancho*esp)(tramo R24)
(long*ancho*esp)(tramo R28)
(long*ancho*esp)(tramo R30)
(long*ancho*esp)(tramo R31)
TOTAL
(long*ancho*esp)(tramo R4)
(long*ancho*esp)(tramo R5)
(long*ancho*esp)(tramo R6)
(long*anch*espo)(tramo R7)
(long*ancho*esp)(tramo R8)
(long*ancho*esp)(tramo R9)
(long*ancho*esp)(tramo R10)
(long*ancho*esp)(tramo R11)
(long*ancho*sp)(tramo R12)
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
(long*ancho*esp)(tramo R1-12)
(long*ancho*esp)(tramo R13-14)
(long*ancho*esp)(tramo R17)
(long*ancho*esp)(tramo R18)
(long*ancho*esp)(tramo R20)
(long*ancho*esp)(tramo R23)
(long*ancho*esp)(tramo R25)
(long*ancho*esp)(tramo R26)
(long*ancho*esp)(tramo R27)
(long*ancho*esp)(tramo R29)
(long*ancho*esp)(tramo R32)
(long*ancho*esp)(tramo R1-32)
TOTAL
RELLENO= Excv a maquina-Desalojos
962.84 Excv a maquina (datos de la partida Nº03)
0.03 Desalojo tub 1/2"=pi()/4*(0,08*,08)m2 *1081,61m
Desalojo tub 3/4"= pi()/4*(371,69m*0,0125*,0125)m2
Desalojo tub 1"= pi()/4*(371,69m*0,0125*,0125)m3
Desalojo tub 1 1/2"= pi()/4*(371,69m*0,0125*,0125)m4
0.34 Desalojo tub 2"= pi()/4*(371,69m*0,0125*,0125)m5
Desalojo tub 2 1/2"= pi()/4*(371,69m*0,0125*,0125)m6
Desalojo tub 3"= pi()/4*(371,69m*0,0125*,0125)m7
Desalojo tub 4"= pi()/4*(371,69m*0,0125*,0125)m8
101.71 Desalojo de volumnen de arena part. N°05)
860.76 TOTAL
Carga y bote= Excv a maquina- Relleno
962.84 Excv a maquina (datos de la partida Nº 03)
860.76 Relleno (datos de la partida Nº 09)
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
102.08 TOTAL
(pza)(tramo 1-8)
(pza)(tramo 1-7)
(pza)(tramo 1-12)
(pza)(tramo 12-3)
(pza)(tramo 1-3)
(pza)(tramo 12-11)
(pza)(tramo 3-4)
(pza)(tramo 4-11)
(pza)(tramo 11-10)
(pza)(tramo 10-5)
(pza)(tramo 4-5)
(pza)(tramo 10-9)
(pza)(tramo 9-6)
(pza)(tramo 5-6)
(pza)(tramo 6-X)
(pza)(tramo 9-X)
(pza)(tramo 1-12)
(pza)(tramo 12-3)
(pza)(tramo 1-3)
(pza)(tramo 12-11)
(pza)(tramo 3-4)
(pza)(tramo 4-11)
(pza)(tramo 11-10)
(pza)(tramo 10-5)
(pza)(tramo 4-5)
putos metricos
M2 N° VIAJES HE M3 KGF TON*KM OBSERVACIONES
(pza)(tramo 10-9)
(pza)(tramo 9-6)
(pza)(tramo 5-6)
(pza)(tramo 6-X)
(pza)(tramo 9-X)
1
2 1∕2
2 1∕2
4
4