Beruflich Dokumente
Kultur Dokumente
MINERALS
MAY 2018
3.00
2.50
2.00
1.50
304
178 219
147 165
73 37
(47) (17)
(113) (77)
(142) (121)
(270)
2011 2012 2013 2014 2015 2016 2017 2018F 2019F 2020F 2021F 2022F 2023F 2024F 2025F
Sentinel, Zambia
Pyhäsalmi, Finland
7 MINES
Cobre Panama,
Panama
Çayeli, Turkey 1 SMELTER
Guelb Moghrein, Mauritania 4 PROJECTS
9 COUNTRIES
Haquira, Peru
Q1 '15 Q2 '15 Q3 '15 Q4 '15 Q1 '16 Q2 '16 Q3 '16 Q4 '16 Q1 '17 Q2 '17 Q3 '17 Q4 '17 Q1 '18
+43%
50
SENTINEL
35 PERFORMING WELL
+38%
351
CONTINUES TO
255 EXCEED
EXPECTATIONS
Q3 '15 Q4 '15 Q1 '16 Q2 '16 Q3 '16 Q4 '16 Q1 '17 Q2 '17 Q3 '17 Q4 '17 Q1 '18
2020
• Expected ramp-up completed
• Production 270kt to 300kt
2018
• Power plants
operational
• First throughput
in the mills
2019 2021
• Existing mills ramped up • Expected first full year of
• 8th mill completion ramped-up production
• Production of at least 150kt • Production 330kt to 350kt
1.74
1.54
1.46
1.32
1.04
0.91
0.75 0.66
0.58 0.57
0.51 0.47 0.44 0.41
0.31 0.28 0.27
First Quantum 2020F
Liquidity Liquidity
March 31, 2018
December 31, 2016
$1.3b $2.5b
I N A N I N C R E A S I N G LY
CONSTRAINED
COPPER WORLD
OUR
GOALS
STEADY
GROWTH
HIGH
DEMAND
EMPOWERING
COMMUNITY
MENTORS