Sie sind auf Seite 1von 1

Home Customer Information Company Information Reports Downloads Tenders

Ongoing Projects Media Contact Us

Customer Information > Know Your HT Bill

SOUTHERN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED


Print Bill

Bill for the month of : Nov-18 Dated : 05-Nov-18


Payable on or before 20-Nov-18 VJA892
Contracted MD (KVA/HP) 1400 M/s. ACE URBAN HITECH CITY LIMITED
Specified Voltage (KV) 11 E.C.C DIVISION,R.S.NO 53,
Actual Voltage (KV) 33 KESARAPALLI VILLAGE,
Category IA GANNAVARAM (M),KRISHNA DT.

KWH KVAH KVA TOD SOLAR


Reading on 03-Nov-18 10051.8 10060.2 .73 (-)T1: 50625 0
Reading on 02-Oct-18 9730.8 9739.2 (+)T2: 34200 0
Difference 321 321 (+)T5: 43725 0.0
Multiplying Factor 750 750 750 (-)T6: 15675 750
Total Consumption 240750 240750 547.5 NET: 15521.25 0
Monthly Minimum 0.0 56000 1120 PF: 1 0
Consumption Main 240750 Colony 56000 L&F 0
Rs. Ps.
Demand Charges Normal rate Rs. 475 for 1120 KVA 532000
Addl Charge at Rs. * 2 for 0 KVA 0
Energy Charges All Units Ps. 587 for 240750 KWH 1413203
Addl Charge at for KWH 0
TOD Charges Rs. 1 for 15521 15521
Low Volt Surcharge 0
Elecy. Duty Rs. 6 for 2408 14445
Colony rate Rs. 0 for 0 KWH 0
L & F rate Ps. 0 for 0.0 KWH 0
Sub Total 1975169
Customer Charges 2813
Low Power Factor Surcharge 0
Transformer Hire Charges 0
Capacitor Surcharge 0
Late Payment Charges 550
E D. int. 0
Other Charges 0
0
0
1978532
0
1978532

Prev Year Arrears 0


Current Year Arrears 1140.02
Total Arrears 1140.02
NET PAYABLE 1979672.02
E & O.E. Rupees Nineteen Lakhs Seventy Nine Thousand Six Hundred and Seventy Two Only

Home | About Us | Services | Tenders | Media | Site Map | Contact Us | Privacy Policy | Disclaimer | Legal | Careers
© 2016-17 APSPDCL.All Rights Reserved | Browser Compatibility

Das könnte Ihnen auch gefallen