Sie sind auf Seite 1von 1
Before proceeding ensure that you have the correct Magnetron: MK2 S-Band 30kW: MG5223 or M1623 1, Loosen 12 captive cover sorews on the pedestals lett side and swing open the cover 2. Disconnect the Magnetron leads (green and yellow) from the binding posts E1 and E2 3. Remove two screws, lock washers, and flat washers and the binding post bracket from the pedestal casing. 4. Facing the back of the magnetron and remove four bolts, flat washers and lock washers where the Magnetron meets the Circulator and two screws, flat washers and lock washers where the Magnetron mounting bracket meets the pedestal casing 5, Remove the Magnetron from the RF assembly 6. Install Magnetron by reversing the removal procedures 7. After Magnetron change and use SETUP TEST menu Calibration visual ‘Adjustment to set the new Tune Preset. Also Magnetron send time hours can be reset. PEDESTAL FRONT VIEW PEDESTALLEFT SIDE VIEW mer MAGNETRON QJ SULATOR DONOT ADIUST DEPOT LEVEL TUNED PEDESTAL BOTTOM VIEW (NFEIF AMRONLY) Fig, 1: S-Band RF Assembly Layout

Das könnte Ihnen auch gefallen