ALIGNMENT INSPECTION REPORT FOR ERECTION OF STRUCTURAL STEEL

(CONVEYOR TOWER)

Project : WAGON LOADING STATION PHASE – 1 Report No : Date:

Client : KRISHNAPATNAM PORT COMPANY LIMITED DWG NO: 192-60-001-DRW-ME-CT4-2100 Rev:

Contractor : ARDEE ENGINEERING COMPANY Grid No : A,B & C No of Columns : 09

Area : CT-4 Transfer Tower Length 12000 mm MX Width 11500 mm MX Height 15600 mm

Reference Elevation EL+ 4.200 MLVL

Water Level
Column
Column Verticality by Plumb Top of Column EL (M) Diagonal of Coulmns
El+ Bottom of
Sl Description Of Grid the Base Plate
No Items No

X-Axis Y-Axis X-Axis Y-Axis R F R F

1 COLUMN A1

A1 to
2 COLUMN A2 A 19.8 B2,B1 to
A2-9293,

3 COLUMN A3

4 COLUMN B1

A2 to
5 COLUMN B2 B 19.8 B3,B2 to
A3-9293

6 COLUMN B3

6 COLUMN C1

B1 to
6 COLUMN C2 C 19.8 C2,C1 to
B2-7426

6 COLUMN C3

Remarks

Addenda: R: Required, F = Found, EL = Elevation, M = Meter

ARDEE ENGINEERING COMPANY TUV SUD SOUTH ASIA(P) Ltd KPCL

Name : NAME : Name :

Signature Signature Signature

Date Date Date


ALIGNMENT INSPECTION REPORT FOR ERECTION OF STRUCTURAL STEEL (TRANFER
TOWERS)

Project : WAGON LOADING STATION PHASE – 1 REPORT NO: 03 Date:

Client : KRISHNAPATNAM PORT COMPANY LIMITED DWG NO: 192-60-001-DRW-ME-CT6-2100 Rev 0

Contractor : ARDEE ENGINEERING COMPANY Grid No : A&B No of Columns : 6 No'S

Area : CT-6 Transfer Tower Length 14mtr MX Width 8.5 M MX Height 12.9 M

Reference Elevation BOP L + 4.2 Mtr MX LVL :17.100 mtr

Water Level Column


El+ Bottom of the Column Verticality by Plumb Top of Column EL (M) Diagonal of Coulmns
Base Plate
Sl Description Of Grid
No Items No

X-Axis Y-Axis X-Axis (365mm) Y-Axis (270mm) R F R F

1 COLUMN A1 0 0 8 -6 17.1 17.1

2 COLUMN A2 A

3 COLUMN A3 0 0 -2 -2 17.1 17.1


A1 to
B4,A4 to
B1-16378
4 COLUMN B1 0 0 -3 -2 17.1 17.1

5 COLUMN B3 B

6 COLUMN B4 0 0 -1 -5 17.1 17.1

Remarks :

Addenda: R: Required, F = Found, EL = Elevation, M = Meter

ARDEE ENGINEERING COMPANY TUV SUD SOUTH ASIA(P) Ltd KPCL

Name : NAME : Name :

Signature Signature Signature

Date Date Date


ALIGNMENT INSPECTION REPORT FOR ERECTION OF
STRUCTURAL STEEL (CONVEYOR TOWER)

Project : WAGON LOADING STATION PHASE – 1 REPORT NO: 04 Date:

Client : KRISHNAPATNAM PORT COMPANY LIMITED DWG NO: 192-60-001-DRW-ME-CT8-2100


Rev 0

Contractor : ARDEE ENGINEERING COMPANYGrid No : A,B & C No of Columns : 6 No'S


Transfer
Area : CT-8 Tower 9 mtr MX Width 12 M MX Heigh 11.500 M
Length
Reference Elevation
TOG L + 4.2 Mtr MX LVL :15.700 mtr

Water Level
Column Column Verticality by Top of Column Diagonal of
El+ Bottom of Plumb EL (M) Coulmns
Sl Description Of Grid the Base Plate
No Items No

X-Axis Y-Axis
X-Axis Y-Axis R F R F
(365mm) (270mm)

1 COLUMN A1 15.7
A
2 COLUMN A2 15.7

3 COLUMN B1 15.7 A1 to
B4,A4
B
to B1-
4 COLUMN B2 15.7 16378

5 COLUMN C1 15.7
C
6 COLUMN C2 15.7

Remarks :

Addenda: R: Required, F = Found, EL = Elevation, M = Meter

ARDEE ENGINEERING COMPANY TUV SUD KPCL


Name : NAME : Name :
Signature Signature Signature
Date Date Date
ALIGNMENT INSPECTION REPORT FOR ERECTION OF STRUCTURAL STEEL (CONVEYOR
TOWER)

Project : WAGON LOADING STATION PHASE – 1 REPORT NO: 04 Date:

Client : KRISHNAPATNAM PORT COMPANY LIMITED DWG NO: 192-60-001-DRW-ME-CT3-2100 Rev 0

Contractor : ARDEE ENGINEERING COMPANY Grid No : A,B,C & D No of Columns : 10 No'S

Area : CT-3 Transfer Tower Length 22.5 mtr MX Width 16.2 M MX Height 13.925 M

Reference Elevation TOG L + 4.2 Mtr MX LVL :18.125 mtr

Water Level Column


El+ Bottom of the Column Verticality by Plumb Top of Column EL (M) Diagonal of Coulmns
Base Plate
Sl Description Of Grid
No Items No

X-Axis Y-Axis X-Axis (365mm) Y-Axis (270mm) R F R F

1 COLUMN A1
A1 to
A 18.125 B2,B1 to
A2-14142,
2 COLUMN A2

3 COLUMN B1
18.125
B1 to
4 COLUMN B2 B C3,B3 to
C1-18680

5 COLUMN B3
18.125
6 COLUMN C1

B1 to
7 COLUMN C2 C C2,C1 to
B2-13656
18.125
8 COLUMN C3

9 COLUMN D1 C1 to
D 18.125 D2,D1 to
10 COLUMN D2 C2-10427

REMARKS:

Addenda: R: Required, F = Found, EL = Elevation, M = Meter

ARDEE ENGINEERING COMPANY TUV SUD SOUTH ASIA(P) Ltd KPCL

Name : NAME : Name :

Signature Signature Signature

Date Date Date


ALIGNMENT INSPECTION REPORT FOR ERECTION OF STRUCTURAL STEEL
(CONVEYOR TOWER)

Project : WAGON LOADING STATION PHASE – 1 REPORT NO: 04 Date:

Client : KRISHNAPATNAM PORT COMPANY LIMITED DWG NO: 192-60-001-DRW-ME-TTS-2100 Rev 0

Contractor : ARDEE ENGINEERING COMPANY Grid No : 1,2,4,5 & 6 No of Columns : 16No'S

Area : TTS Transfer Tower Lengt 32.00 M MX Width 12.00 M MX Height 14.352 M

Reference Elevation TOG L + 43.98 M MX LVL :58.332 M

Water Level Column


El+ Bottom of the Column Verticality by Plumb Top of Column EL (M) Diagonal of Coulmns
Base Plate
Sl Description Of Grid
No Items No

X-Axis Y-Axis X-Axis (365mm) Y-Axis (270mm) R F R F

1 COLUMN A1

2 COLUMN A'1 A1 to
1 58.332 B1',A1' to
3 COLUMN A''1 B1-12816

4 COLUMN B1

5 COLUMN A1' A2 to
1' B1',B2 to
6 COLUMN B1' A1'-13200
58.332
7 COLUMN A2 A4 to
2 B2,A2 to
8 COLUMN B2 B4-16865

9 COLUMN A4 A5 to
4 58.332 B4,B5 to
10 COLUMN B4 A4-13350

11 COLUMN A5
5 58.332
12 COLUMN B5

13 COLUMN A6 A6 to B5,
B6 to A5-
14 COLUMN A'6 12747
6 58.332
15 COLUMN A''6

16 COLUMN B6

REMARKS:

Addenda: R: Required, F = Found, EL = Elevation, M = Meter

ARDEE ENGINEERING COMPANY TUV SUD SOUTH ASIA(P) Ltd KPCL

Name : NAME : Name :

Signature Signature Signature


Date Date Date

Das könnte Ihnen auch gefallen