EXECUTION OF CONCRETE
STRUCTURES
Constructors Obligation in Quality
Control on Site
Prof. Dubravka Bjegović, Ph.D.C.E.
Institut IGH d.d Zagreb and
University of Zagreb, Faculty of Civil Enginering, Department for Materials
Parliamentary
democracy
Independance
25.06.1991.
(from
Yugoslavia)
Population:
4.480.043
Central Europe
Mediterranean
country with
1246 Islands
Mountains,
lakes, national
parks
Content
Introduction
Legislation in EU and Republic of Croatia, Regulations and Standards
Participants in construction process
Bridge Selnica – Bypass Velika Gorica, description of construction site,
application of regulations on site
Quality management and Quality control on site throughout all stages of
drilled concrete piles execution
Main requirements of Technical regulation for concrete structures Annex
“J" and standard HRN EN 13670:2010
HRN EN ISO 9001:2008 Quality management systems
Conclusion
CONCEPTUAL DESIGN
Preliminary specifications for
construction and maintenance
Specifications for design
INVESTMENT STUDY
Market Analysis
Economic and financial analysis
Financial structure
Period of investment return
DESIGN
Project specification
Specifications for materials,
equipment, parts and assemblies
Essential requirements for building
Load capacity, usability, durability
Building permits
Introduction - The flow of the construction project
CONSTRUCTION
BID, TENDER Execution specification
Public open tender Supervision
Sending offer Technical inspection of the
Selection of contractor building
Contract for construction Handing over the building
to investor
MAINTENANCE OF BUILDING
Facility management
Monitoring
Construction inspections
Repairs and replacement of worn parts
DEMOLITION AND
RECYCLING
Concrete
Steel
Bricks and building rubble
Obligation of contractor
Quality plan for the
execution of concrete
structures
Under the supervision
- supervisor engineer
Laboratory for Laboratory on site
Test samples
concrete testing on site Sampling
Curing specimens
QUALITY CONTROL
OF CONCRETE – Testing, testings result
Records of quality
IMPLEMENTATION control procedures
ON CONSTRUCTION Final report - Proof of
SITE usability of concrete
Legislations in EU and in Croatia
+ Nationally Determined
Parameters, NDPs
+ Nationally Determined
Parameters, NDPs
+ National annex
HRN 1128:2007
+ National annex,
HRN ???
Legislations in EU and in Croatia
+
OTHER PARTICIPANTS IN
INVESTOR
CONSTRUCTION PROCESS
DIRECT PARTICIPANTS
INDIRECT PARTICIPANTS
DESIGNERS
REVISORS Government bodies
CONSTRUCTORS Inspections
SUPERVISOR ENGINEER Urban planners
Experts and advisers Financial organizations
Companies for exploration work Chambers of commerce
Faculties and Institutes Professional associations
Different suppliers (equipment, Utility company
machinery, plant and materials) Public company
Participants in construction process
Participants in INVESTOR
construction process:
SUPERVISOR
DESIGNER REVISER CONTRACTOR
ENGINEER
Participants in construction process
INVESTOR
Legal or natural person in whose name structure is building
Provides with the design, validation and control of projects,
construction and supervision to authorized persons
Obtain all building permits
Investor is required to provide supervision
Investor is required to report beginning or continuation of
construction
Request for obtaining a use permit
Obtain all the documentation for technical inspection of the building
Building owner is responsible for its maintenance so that during it
use to preserve the essential requirements for building
Removal of the building permit, removal, supervision of removal
Participants in construction process
DESIGNER
Natural person who prepares the building projects
Designer is responsible for project to be made in accordance with
laws and regulations, project must comply with the location permit
and must meet essential requirements for structure
Defines the structure
Defines the use of building
Defines the product
Defines the main requirements for the execution of the building
The main designer is determined by the investor
Participants in construction process
REVISOR
Natural or legal person authorized for the project
control
Authorized revisor, graduate civil engineer with a
minimum of ten years of service
Revisor is responsible for project or part of project that he
controled to be made in accordance with laws and
regulations, project must comply with the location permit and
must meet essential requirements for structure
Revisor must be independent
Participants in construction process
CONSTRUCTOR
CONSTRUCTOR
Provide:
Proof of usability of embedded construction products
Proof of compliance of embedded equipment according to
specific act
Documents of compliance of specific building parts to basic
requirements for structure and from competent authority given
proof of quality (testing results, records of conducted control
quality procedures etc.)
Legally dispose construction waste generated during
construction on the site
Draw up a written report of conducted works, and of the
maintenance building
Participants in construction process
SUPERVISOR ENGINEER
In accordance with Physical Planning and Building Act
Supervisor Engineer is a natural person who under a
special law has the right to use the professional title of a
licensed architect or licensed engineer and to conduct
technical supervision of construction on behalf of the
Investor.
The supervisor engineer can
not be an employee of a
person who is the contractor
on the same building
Participants in construction process
SUPERVISOR ENGINEER
Supervise the construction to be in accordance with the
main design, building permit, Physical Planning and
Building Act and other special regulations
Determine if a main design in terms of horizontal and
vertical dimensions and purpose of the building is made
in accordance with the decision on building conditions or
location permit
Determine if construction staking is performed by the
person authorized to conduct affairs of state survey and
real property under a special law
Determine whether the contractor meets the
requirements for performing construction activities
Participants in construction process
SUPERVISOR ENGINEER
Determine the implementation of control procedures in
respect of compliance assessment, and prove the
quality of certain parts of the building by an authorized
person
Immediately inform Investor with all the disadvantages
or irregularities perceived during construction, building
inspections and other inspections of the measures
taken
Compile a final report on the building construction.
Bridge Selnica – Bypass Velika Gorica
sections of road D-31 with connection to the D-408, PHASE II
Bridge
Selnica
Bridge Selnica – Bypass Velika Gorica
INVESTOR:
CONTRACTOR:
Viadukt d.d. Zagreb
SUBCONTRACTOR: LABORATORY ON
(AB bušeni piloti) CONSTRUCTION SITE:
Crosco d.o.o Zagreb Viadukt d.d. Zagreb
Bridge Selnica – Bypass Velika Gorica
GEOMECHANICAL PROJECT
GROUND WATER – MEASUREMENT
DRILLING AND COLON
TEST DRILLING VERTICALITY
INSTALATION
GEOTECHNICAL PROPERTIES MONITORING
MEASURING DEPTH AND DIAMETER OF DRILLHOLE
DURATION OF DRILLING
Specification of concrete
MAIN DESIGN Delivery, receipt and
PROGRAM OF QUALITY CONTROL construction site transport
of concrete
AND QUALITY ASSURANCE Works during concreting
Concreting and compaction
Care and protection
Works after concreting
Special technology of
execution
Checking the conformity of
concrete properties
Control of execution
UNIFORMITY OF COMPRESSIVE
STRENGTH TEST RESULTS
DECLARATION OF CONFORMITY
TECHNICAL INSTRUCTIONS
Document issued by the producer
Activity Frequency
Activity Frequency
Construction
site
laboratory
Quality management and Quality control on site
Hardened concrete testings
Minimum requirements for quality control of concrete on construction site – in accordance with
Technical regulation for concrete structures (OG 139/09, 14/10, 125/10)
Activity Frequency
Few definitions:
Bridge Guduča
Krk Bridge
Sky office tower