Sie sind auf Seite 1von 34

MAHINDRA & MAHINDRA Ltd.

UTTRA KHAND

PROJECT REPORT
BLERO SLX/SLE MOULDED ROOF
WRINKLES
Under the Guidance Of
MR.D.P. Singh

SUBMITTED BY
BIKASH BHASKAR
ROLL NO:-25900716046

GLOBAL INSTITUTE OF MANAGEMENT AND TECHNOLOGY (GIMT)

Approved by AICTE &Affilated to MAULANA ABUL KALAM AZAD


UNIVERSITY OF TECHNOLOGY (MAKAUT) WB
10th JUNE 2018 - 09thJULY 2018
Acknowledgement

GRATITUDE IS THE HARDEST EMOTION TO EXPRESS AND OFTEN ONE DOES NOT
FIND ADEQUATE WORDS TO CONVEY ONE’S ENTIRE FEELING. I EXPRESS MY
SINCERE GRATITUDE AND DEEP INDEBTEDNESS TO THE H.R. MANAGEMENT FOR
GRANTING ME THE PERMISSION ME AS A SUMMER TRAINEE.
I OWN MY GRATITUDE TO MAHINDRA & MAHINDRA Ltd. HARIDWAR FOR
PROVIDING ME THE OPPORTUNITY TO UNDERGO PROJECT AND ALLOWING ME
TO GAINED VAST KNOWLEDGE ABOUT THE INDUSTRY AND THE OTHER ASPECTS
OF THE ORGANISATION DURING OUR TRAINING PERIOD.
IT IS MY FOREMOST DUTY TO EXPRESS MY DEEP SENSE OF GRATITUDE AND
RESPECT TO Mr. SANJAY Kr. SAMANTARAY (Asst. Manager CQA) FOR HIS
VALUABLE GUIDENCE AS WELL AS UPLIFTING TENDENCY AND INSPIRING ME
FOR TAKING UP TRAINING AND COMPLETING IT SUCCESSFULLY.
I GREATLY APPRECIATE HIS MOTIVATION AND UNDERSTSNDING EXTENDED FOR
THIS PROJECT WORK AND VERY THANKFUL TO HIM FOR HIS ENCOURAGEMENT
AND INSTRUCTIONS OTHERWISE IT COULD NOT HAVE BEEN POSSIBLE FOR ME.
I AM ALSO VERY THANKFUL TO EACH AND EVERY STAFF OF MAHINDRA &
MAHINDRA WHO GAVE THEIR SUPPORTS IN THEIR OWN WAYS.
AS WE KNOW WELL THAT NO WORK IS POSSIBLE WITHOUT THE HELP OF
PARENTS AND TEACHERS SO I THANK MY PARENTS AND TEACHERS WITH MY
HEART WHO MOTIVATED ME TO EXTEND TO MY REACH AND WITH THEIR
SUPPORT I HAVE BEEN ABLE TO COMPLETE THIS WORK.

2
TABLE OF CONTENTS
ACKNOWLEDGEMENT…………………………………………………………….………..2
INTRODUCTION OF COMPONY…………………………………………………..……..…4

1.1 AIM & ESTABLISHMENT OF THE COMPANY………………………………………….….….7


1.1.1 Establishment of the company.
1.1.2 Types of services/products given/produced
1.1.3 Mission statement and aim of the company
1.2 MAHINDRA QUALITY SYSTEM……………………………………………….……………….16

1.3 DEPARTMENTS OF THE COMPANY…………………………………………………………..17

1.3 LIMITATIONS………………………………………………………………………………………21
Do’s and Don’ts in the Organization

2. WORK EXPERIENCE …………………………………………………………………………..…..22


Description the department I worked in.
A brief introduction

4. CONCLUSION………………………………………………………..………………………………..33
What did I learn?
How will this experience help me in the future?

3
INTRODUCTION OF COMPONY
History
Few groups can identify as closely with India's destiny and
industrial progress as the Mahindra Group. In fact, Mahindra is
like a microcosm of India. Both were born around the same
time, had the same aspirations and both experienced the
inevitable troughs
and crests in the journey towards their goals. And both continue to march on the path
to progress and global recognition.

The birth of Mahindra & Mahindra began when K.C.


Mahindra visited the United States of America as Chairman of
the India Supply Mission. He met Barney Roos, inventor of
the rugged 'general purpose vehicle' or Jeep and had a flash of
inspiration: wouldn't a
vehicle that had proved its invincibility on the battlefields of World War II be ideal for
India's rugged terrain and its kutcha rural roads?
Swift action followed this thought. The Mahindra brothers joined hands with a
distinguished gentleman called Ghulam Mohammed & on October 2nd, 1945,
Mahindra & Mohammed was set up as a franchise for assembling Jeeps from Willys,
USA.
Two years later, India became an independent nation and Mahindra & Mohammed
changed its name to Mahindra & Mahindra. Ghulam Mohammed migrated to Pakistan
post-partition and became the first Finance Minister of Pakistan.
Since then, Mahindra & Mahindra has grown steadily in size and stature and evolved
into a Group that occupies a premier position in almost all key sectors of the economy.
The Group's history is studded with milestones. Each one taking the Group forward. In
fact, today, its total turnover is about 6.3 billion dollars.
Mahindra is a group in a hurry, engaged in an ambitious, sustained and prolonged
penetration into the global arena. Its spirit can be encapsulated in the words of the poet
Robert Frost, a favourite of India's first Prime Minister, Pandit Jawaharlal Nehru:
"The woods are lovely, dark and deep,
But I have promises to keep,
And miles to go before I sleep,
And miles to go before I sleep."

For Mahindra & Mahindra, this translates into many more milestones to be set up
before it rests. If ever.

4
Group Overview

Mahindra embarked on its journey in 1945 by assembling the Willys Jeep in India and
is now a US $7.1 billion Indian multinational. It employs over 1,00,000 people across
the globe and enjoys a leadership position in utility vehicles, tractors and information
technology, with a significant and growing presence in financial services, tourism,
infrastructure development, trade and logistics. The Mahindra Group today is an
embodiment of global excellence and enjoys a strong corporate brand image.

Mahindra is the only Indian company among the top tractor brands in the world. It is
today a full-range player with a presence in almost every segment of the automobile
industry, from two-wheelers to CVs, UVs, SUVs and sedan. Mahindra recently
acquired a majority stake in REVA Electric Car Co Ltd. (now called Mahindra
REVA), strengthening its position in the Electric Vehicles domain.

The Mahindra Group expanded its IT portfolio when Tech Mahindra acquired the
leading global business and information technology services company, Satyam
Computer Services. The company is now known as Mahindra Satyam.

Mahindra is also one of the few Indian companies to receive an A+ GRI checked
rating for its first Sustainability Report for the year 2007-08 and has also received the
A+ GRI rating for the year 2008- 09.

The Group at a Glance


Automotive
Domestic Operations
International Operations
Mahindra Renault Private Limited (MRPL)
Mahindra Navistar Automotives Limited (MNAL)
Mahindra Navistar Engines Private Limited (MNEPL)

After-Market Sector
Mahindra Spares Business
Mahindra First Choice
Mahindra First Choice Wheels Ltd.

Farm Equipment Sector


Domestic Operations
International Operations

5
Mahindra Gujarat Tractor
Mahindra Agribusiness
Mahindra Powered
Mahindra USA
Mahindra Australia
Mahindra China Tractors

Financial Services Sector


Mahindra & Mahindra Financial Services Ltd (Mahindra Finance)
Mahindra Insurance Brokers Ltd.
Mahindra Rural Housing Finance Ltd (MRHFL)

Infrastructure Development Sector


Mahindra Holidays & Resorts
Mahindra Life spaces Developers Limited
Mahindra World City
Mahindra Infrastructure Developers
Acres Consulting Engineers
Information Technology Sector
Tech Mahindra
Bristlecone
Mahindra 2 Wheelers
Mahindra Systech
Forgings
• Mahindra Forgings Limited - India
• Mahindra Forgings Europe - Ag
- GSA
- Schonoweiss & Co GMBH
- JECO
- Stokes UK
- Falkenroth
Engineering Services
• Mahindra Engineering
• Engines Engineering Italy
• Mahindra Aerospace
Stampings
Steel
Ferrites
Contract Sourcing

6
Telematrices
Composites
Castings
Gears
• Mahindra Sar Transmissions
• Metalcastello Italy

Speciality Businesses
Mumbai Mantra
Mahindra Defense System

Mahindra Partners
Mahindra Odys sea
Mahindra Inter trade
Mahindra Steel Service Center
Mahindra Middle East Electrical Steel Service Centre (MMESSC)
Mahindra Logistics Ltd.
Mahindra Retail

AIM & ESTABLISHMENT OF THE COMPANY


Establishment of the company

7
The birth of Mahindra & Mahindra began when K.C. Mahindra visited the United
States of America as Chairman of the India Supply Mission. He met Barney Roos, the
inventor of the rugged 'general purpose vehicle' or Jeep and had a flash of inspiration:
wouldn't a vehicle that had proved its invincibility on the battlefields of World War II
be ideal for India's rugged terrain and its kutcha rural roads?
Swift action followed this thought. The Mahindra brothers joined hands with a
distinguished gentleman called Ghulam Mohammed & on October 2nd, 1945,
Mahindra & Mohammed was set up as a franchise for assembling Jeeps from Willys,
USA.
Two years later, India became an independent nation and Mahindra & Mohammed
changed its name to Mahindra & Mahindra. Ghulam Mohammed migrated to Pakistan
post-partition and became the first Finance Minister of Pakistan.

Types of products produced


Haridwar Plant:
Haridwar i.e. 'Hari ka dwar'- the gateway to God, is around 190kms from Delhi and is
very well connected by trains and buses. It is also one of the many pilgrimage spots
that are situated along the length of the holy Ganga. In Hindu mythology, it is known
as Kapilsthan. According to the myth, drops of nectar churned out from the primordial
ocean and fell at the four sites of the Kumbh fair, which included Haridwar

This holy land is also the location of Mahindra's fifth full scale plant after Kandivli,
Nasik, Igatpuri and Zaheerabad. The plant is set up primarily for the manufacture of
three wheelers of different load capacities and range. The total plant area is 34.78 acres
with a built up area of 6.05 acres. The total employee strength at the plant is around
226.With manufacturing facilities like Conveyorized Assembly line the Vehicle
Assembly Capacity is 80 units per day.

The Mahindra Group’s Automotive Sector is in the business of manufacturing and


marketing utility vehicles and light commercial vehicles, including three-wheelers. It
is the market leader in utility vehicles in India since inception, and currently accounts

8
for about half of India’s market for utility vehicles.

Although created in 1994 following an organizational restructuring, the Automotive


Sector can trace its antecedents back to 1954. The iconic Jeep that led American G.I.s
to victory in World War II is the very same vehicle that drove the Mahindra Group to
success in the Automotive Sector. Mahindra & Mahindra Limited, the flagship
company of the Group, was set up as a franchise for assembling general purpose utility
vehicles from Willys, USA.
Over the years, the Group has developed a large product portfolio catering to a diverse
customer base spanning rural and semi-urban customers, defense requirements and
luxurious urban utility vehicles. In 2002, it launched the indigenously engineered
world-class sports utility vehicle-Scorpio, which bridges the gap between style and
adventure, luxury and ruggedness, and performance and economy.

Presenting India's first compact truck. A truck that’s built to save for you. It gives an
unmatched mileage of 27 kmpl and scores really low on maintenance. Its 0.5 ton,
compact truck box ensures maximum space is utilised in intra city operations.

MAHINDRA VEHICLES

9
MAHINDRA QUALITY SYSTEM (MQS)
In Mahindra quality system there are many techniques used. The techniques are:

10
1. 7 QC TOOLS
 Flow Chart
 Check Sheet
 Histogram
 Pareto Diagram
 Scatter Diagram
 Cause and Effect Diagram
 Control Chart

2. KAIZEN
3. POKA YOKE
4. BRAIN STORMING
5. 5W + 1H Questions

FLOW CHART:
What Is a Flowchart?
A diagram that uses graphical symbols to depict the nature and flow of the steps in a
process.

Benefits of Using Flowcharts


• Promote process understanding
• Provide tool for training
• Identify problem areas and improvement opportunities
• Depict customer-supplier relationships

Symbols Used in Flowcharts


Start / End

Process Step

Decision NO

YES
Connector

Measurement

How do we get started?


Many methods for constructing Flowcharts have been described and you can safely
use any one of them, as long as you start out by doing these things:

11
! Identify the right people to develop the chart.
! Determine what you expect to get from the Flowchart.
! Identify who will use it and how.
! Define the level of detail you need.
! Establish the boundaries of the process to be improved.

CHECK SHEET:
What it is:
A check sheet is a simple form you can use to collect data in an organized
manner and easily convert it into readily useful information. With a check
sheet, you can:
• Collect data with minimal effort.
• Convert raw data into useful information.
• Translate opinions of what is happening into what is actually happening.
In other words, “I think the problem is . . .” becomes “The data says the
problem is . . .”

How to use it:


Clearly identify what is being observed. The events being observed should
be clearly labeled. Everyone has to be looking for the same thing.
Keep the data collection process as easy as possible. Collecting data should
not become a job in and of itself. Simple check marks are easiest.
Group the data. Collected data should be grouped in a way that makes the
data valuable and reliable. Similar problems must be in similar groups.
Be creative. Try to create a format that will give you the most information
with the least amount of effort.

HISTOGRAM:
What is a Histogram?
A Histogram is a vertical bar chart that depicts the distribution of a set of data. Unlike

12
Run Charts or Control Charts, which are discussed in other modules, a Histogram
does not reflect process performance over time. It's helpful to think of a Histogram
as being like a snapshot, while a Run Chart or Control Chart is more like a movie.

6
5
4
Series 1
3
Series 2
2
Series 3
1
0
Category 1 Category 2 Category 3 Category 4
LSL USL

When should we use a Histogram?


When you are unsure what to do with a large set of measurements presented in a
table, you can use a Histogram to organize and display the data in a more userfriendly
format. A Histogram will make it easy to see where the majority of values
falls in a measurement scale, and how much variation there is. It is helpful to
construct a Histogram when you want to do the following
! Summarize large data sets graphically. When you look at Viewgraph 6,
you can see that a set of data presented in a table isn’t easy to use. You can
make it much easier to understand by summarizing it on a tally sheet
and organizing it into a Histogram
! Compare process results with specification limits. If you add the
process specification limits to your Histogram, you can determine quickly
whether the current process was able to produce "good" products.
Specification limits may take the form of length, weight, density, quantity of
materials to be delivered, or whatever is important for the product of a given
process. Viewgraph 14 shows a histogram on which the specification limits,
or "goalposts," have been superimposed. We’ll look more closely at the
implications of specification limits when we discuss Histogram interpretation
later in this module.
! Communicate information graphically. The team members can easily
see the values which occur most frequently. When you use a Histogram to
summarize large data sets, or to compare measurements to specification
limits, you are employing a powerful tool for communicating information.
! Use a tool to assist in decision making. As you will see as we move
along through this module, certain shapes, sizes, and the spread of data have
meanings that can help you in investigating problems and making decisions.
But always bear in mind that if the data you have in hand aren’t recent, or you
don’t know how the data were collected, it’s a waste of time trying to chart

13
them. Measurements cannot be used for making decisions or predictions.

PARETO DIAGRAM:
What is a Pareto Chart?
A Pareto Chart is “a series of bars whose heights reflect the frequency or impact of
Problems. The bars are arranged in descending order of height from left to right.
This means the categories represented by the tall bars on the left are relatively more
significant than those on the right”. The chart gets its name from the Pareto
Principle, which postulates that 80 percent of the trouble comes from 20 percent of
the problems. Viewgraph 1 highlights the elements of this definition.

Why should teams use Pareto Charts?


You can think of the benefits of using Pareto Charts in economic terms (Viewgraph
2). “A Pareto Chart breaks a big problem into smaller pieces (and) identifies the
biggest contributors. . . (It can) help us get the most improvement with the resources
available by showing where to focus efforts in order to maximize achievements. The
Pareto Principle states that a small number of causes accounts for most of the
problems. Focusing efforts on the ‘vital few’ causes is usually a better use of
valuable resources”

When should we use a Pareto Chart?


A Pareto Chart is a good tool to use when the process you are investigating
produces data that are broken down into categories and you can count the number of
times each category occurs.
No matter where you are in your process improvement efforts, Pareto Charts can be
helpful, “. . . early on to identify which problem should be studied, later to narrow
down which causes of the problem to address first. Since they draw everyone's
attention to the ‘vital few’ important factors where the payback is likely to be greatest,
(they) can be used to build consensus. In general, teams should focus their attention
first on the biggest problems—those with the highest bars”.
Making problem-solving decisions isn’t the only use of the Pareto Principle. Since
Pareto Charts convey information in a way that enables you to see clearly the
choices that should be made, they can be used to set priorities for many practical
applications in your command. Some examples are:
! Process improvement efforts for increased unit readiness
! Skills you want your division to have
! Customer needs
! Suppliers
14
! Investment opportunities

CAUSE AND EFFECT DIAGRAM:


What is a Cause-and-Effect Diagram?
A Cause-and-Effect Diagram is a tool that helps identify, sort, and display possible
causes of a specific problem or quality characteristic (Viewgraph 1). It graphically
illustrates the relationship between a given outcome and all the factors that influence
the outcome. This type of diagram is sometimes called an "Ishikawa diagram"
because it was invented by Kaoru Ishikawa, or a "fishbone diagram" because of the
way it looks.

When should a team use a Cause-And-Effect Diagram?


Constructing a Cause-and-Effect Diagram can help your team when you need to
! Identify the possible root causes, the basic reasons, for a specific effect,
problem, or condition.
! Sort out and relate some of the interactions among the factors affecting a
particular process or effect.
! Analyze existing problems so that corrective action can be taken.

CONTROL CHART:
What is a Control Chart?
A control chart is a statistical tool used to distinguish between variation in a process
resulting from common causes and variation resulting from special causes.

15
It presents a graphic display of process stability or instability over time
Every process has variation. Some variation may be the result of causes which are not
normally present in the process. This could be special cause variation. Some variation is
simply the result of numerous, ever-present differences in the process.
This is common cause variation. Control Charts differentiate between these two
types of variation.

Why should teams use Control Charts?

A stable process is one that is consistent over time with respect to the center and the
spread of the data. Control Charts help you monitor the behavior of your process to
determine whether it is stable. Like Run Charts,they display data in the time
sequence in which they occurred. However,Control Charts are more efficient
that Run Charts in assessing and achieving process stability.
Your team will benefit from using a Control Chart when you want to (Viewgraph 2)
Monitor process variation over time.
Differentiate between special cause and common cause variation.
Assess the effectiveness of changes to improve a process.
Communicate how a process performed during a specific period.

SCATTER DIAGRAM:

16
A Scatter Diagram is used to interpret data by graphically displaying the relationship
between two variables.

1.4
1.2 1.2
1
0.9
0.8 0.8
0.6
Series1
0.4
0.2
0
0 1 2 3 4 5

A SCATTER DIAGRAM IS USED FOR:


1. Validating "hunches" about a cause-and-effect relationship between types of
variables (examples: I wonder if students who spend more time watching TV have
higher or lower average GPA's?; is there a relationship between the production
speed of an operator and the number of defective parts made?; is there a
relationship between typing speed in WPM and errors made?)
2. Displaying the direction of the relationship (positive, negative, etc.) (examples:
Will test scores increase or decrease if the students spend more time in study
hall?; will increasing assembly line speed increase or decrease the number of
defective parts made?; do faster typists make more or fewer typing errors?)
3. Displaying the strength of the relationship (examples: How strong is the
relationship between measured IQ and grades earned in Chemistry?; how strong is
the relationship between assembly line speed and the number of defective parts
produced?; how strong is the relationship between typing faster and the number of
typing errors made?)

KAIZEN

17
Kaizen focuses on small, gradual, and frequent improvements over the long
term with minimum financial investment and with participation by everyone
in the organization.
My own work people oriented low costs shared information an Accumulatio of
Small Changes Continuous Improvement.

POKA YOKE
POKA YOKE (mistake-proofing) is an approach for mistake-proofing
processes using automatic devices or methods to avoid simple human error.

POKA YOKE Examples


Machines have limit switches connected to warning lights that tell the
operator when parts are positioned improperly on the machine.

Fast food restaurants use automated french-frying machines that can only be
operated one way; the french fries are prepackaged and the equipment
automated to reduce the chance of human error.

BRAIN STORMING:
It is a tool used by a team for creative exploration of options in an
environment of free criticism.
It provide creative and restricted exploration of options or solutions.

BENEFITS OF BRAIN STORMING


 Creativity
 Large number of ideas
 Involvement of team member
 Sense of ownership in decision
 Input to other tools

GROUND RULES
 Active participation by everyone
 NO discussion no debate
 Build on other ideas
 Display ideas presented ideas

DEPARTMENTS OF THE COMPANY:

18
There are many departments in the company described below:
1. CQA (Central Quality Assurance) Dept.
2. R&D (Research & Development) Dept.
3. Logistics Dept.
4. Production Dept.
5. IT’S Dept.
6. PD&C (Product Development & Control) Dept.
7. Maintenance Dept.
8. SQA Dept.

CQA (Central Quality Assurance) Dept.:

The general objective of quality assurance department is to enhancement of product and


service quality and an increase of customer satisfaction. To achieve this objective, CQA
should reach the following goals:

Continuous and consistent development, implementation and maintenance of


quality assurance management system
Staff training and compliance with the requirements of the quality assurance
management
Quality control over provided products and services in accordance with The Rules
and Standards of the company
Developing and making arrangements for enhancing the quality of provided
products and services
Organizing and conducting internal audit of the quality assurance management
system
Organizing and controlling corrective and preventing actions of quality
management
Control over equipment and production process
Control over product output
Investigation of customer claims

R&D (Research & Development) Dept.:

The phrase research and development (also R and D or, more often, R&D), according
to the Organization for Economic Co-operation and Development, refers to "creative
work undertaken on a systematic basis in order to increase the stock of knowledge,
including knowledge of man, culture and society, and the use of this stock of knowledge
to devise new applications"
New product design and development is more often than not a crucial factor in the
survival of a company. In an industry that is fast changing, firms must continually revise
their design and range of products. This is necessary due to continuous technology
change and development as well as other competitors and the changing preference of
customers.

19
Logistics Dept.:

The work of logistics department is to provide the inventory to the company. It ensures
the demand of a company and provide sufficient inventory to the company when
required.

Production Dept.:

The work of production department is to ensure the market demand and to produce the
product according to it. So the measure concern of production department is the quantity
of the product that is demanded in market.

IT Dept.:

The work of IT department is to ensure the connectivity of server to the computers and to
check the data of all computers with an audit. The audit takes after a constant period or
suddenly to check unused data.

PD&C (Product Development & Control) Dept.:

The phrase product development & control, according to the Organization for Economic
Co-operation and Development, refers to "creative work undertaken on a systematic basis
in order to increase the stock of knowledge, including knowledge of man, culture and
society, and the use of this stock of knowledge to devise new applications"
New product design and development is more often than not a crucial factor in the
survival of a company. In an industry that is fast changing, firms must continually revise
their design and range of products. This is necessary due to continuous technology
change and development as well as other competitors and the changing preference of
customers.

Maintenance Dept.

The maintenance department ensures the working condition of machines in the company.
Means maintenance department work on the maintenance of machines used in
production. It also ensures the timing of plant of whole assembly line.

LIMITATIONS:

20
The limitations of the company are described in terms of Do’s and Don’ts in
the Organization:

Do’s and Don’ts in the Organization:

Do’s and Don’ts means what should be done and what should not be done in the
organization;

 Do’s-

 Punctuality (timeliness),

 Maintaining healthy and cordial relationship with the people in


organization.

 Understanding the work culture.

 Obeying direct orders from the seniors.

 Showing a sense of belonging with the organization.

 Maintaining proper Line and Staff Relationship with the seniors and
subordinates (If Any).

 Don’ts-

 Do not take the training lightly and casually.

 Do not give an impression that you are doing the training just for the sake
of it. Put your heart and soul.

 Do not involve in internal politics.

 Do not reveal you weaknesses.

 Do not lie to your seniors.

 Do not waste your time.

 Do not copy any material. Be original.

 Do not go for leave unless it is indispensable.

 Do not ask for favors.

WORK EXPERIENCE:

21
I worked in the company as a trainee in CQA department and I learn many things in the
company. The experience cannot be described in words.
The experience gained by me in the company is;

Description the department I worked in:


I work in the CQA department which described below:

CQA (Central Quality Assurance) Dept.


Quality assurance is a part of quality management which represents a complex process
focused on creation of the confidence that the corresponding requirement to quality is
kept, and includes all the factors and the actions needed for achievement of the
appropriate quality level of products and services. Many enterprises have Quality
assurance departments which provide, develop and maintain a system of quality
assurance management. Such system covers not only processes of sampling, working
with specifications and organizing researches, but also development of documentation
and techniques which guarantee satisfactory quality of products and services.

The work of CQA is focused, first of all, on preventing the claims from customers. In
case of receiving such claims on quality of provided products and services, the
department starts searching the reasons and effects of the revealed discrepancies. Quality
Assurance means the completion of a project in accordance with the previously agreed
specifications and functionality required without defects and possible problems.

The general objective of quality assurance department is to enhancement of product and


service quality and an increase of customer satisfaction. To achieve this objective, CQA
should reach the following goals:

Continuous and consistent development, implementation and maintenance of


quality assurance management system
Staff training and compliance with the requirements of the quality assurance
management
Quality control over provided products and services in accordance with The Rules
and Standards of the company
Developing and making arrangements for enhancing the quality of provided
products and services
Organizing and conducting internal audit of the quality assurance management
system
Organizing and controlling corrective and preventing actions of quality
management
Control over equipment and production process
Control over product output
Investigation of customer claims

Based on our wish that future generations may live in safety and comfort, we are
adopting the user perspective and always aim to create and deliver reliable

22
products that are environment-friendly and that generate true customer
satisfaction.

Systematic Quality

23
In order to ensure the effective, positive
operation and implementation of the
quality management systems, TQS 9000
Audits are performed, which also provide
further opportunities to raise quality levels.
Guidance for Internal Audits is provided
continuously and actions are taken
regularly to enhance the skills of auditors
so that TQS 9000 assessments lead directly
to quality improvements.

Guidelines help in ensuring uniformly high quality across the organization


CQA has created its own unique quality framework in the form of the TQS 9000 system.
To implement the system, various guidelines were established in order to help to
eliminate differences between departments and ensure uniformity. Guidelines exist for
tasks such as internal audits, clean room management, and manufacturing plant
information handling. While not absolutely binding, the guidelines are very useful in
raising awareness and improving the overall level of the quality system.

Human Resource Quality


Fostering quality awareness among employees

24
CQA's quality assurance activities are implemented under participation of the entire staff.
"Human Resource Quality" plays a major role in achieving quality that really inspires
customer satisfaction.
What is required of all employees, whether they work in research and development,
manufacturing, or administrative divisions, is maintaining a high awareness of quality.
This is premised on the philosophy of working awareness; what customer satisfaction
means to CQA and what each individual should do to achieve it.
In addition to training and education, practical implementation tests, and information
sharing, quality awareness among all employees is also raised through best practices and
"quality enlightenment" programs. Quality related feedback from the field is always
incorporated into these activities.

Fostering and improving the skill level of quality engineers


Quality engineers and technicians of course play a leading role in quality assurance
activities. Their operations are divided into three major categories as depicted below. In
order to consistently create and deliver high-quality products, a deep-rooted company
culture must be sustained by skills that are constantly updated and improved. We are
always aiming at skill improvement and are training specialists in the respective fields.

Comment from a quality engineer


As a quality engineer, my daily work involves the development of methods for evaluating

25
the reliability of new products. This is aimed at producing high quality output and trying
to prevent problems before they happen. I try to go to actual production sites as often as
possible, in order to see conditions for myself and to communicate with the engineers and
staff there. I believe that sharing information in this way helps us develop better methods.
At the same time, we also apply trial and error techniques in order to improve the
efficiency of product evaluation. I will continue to strive for even better and more
meaningful evaluation methods, so that we can meet the high expectations and justify the
trust that customers are placing in us. The end result is bound to be higher customer
satisfaction.

Reliability Center
Reliability Center Analyzes and Assesses CQA Product Quality, Reliability, and
Safety
The Reliability Center, a subdivision of the Quality Assurance Department, is in charge
of supporting reliability testing at the time of new product development, assessment of
new products, and analyzing failures of products. In addition to the Technical Center in
Ichikawa City, Chiba Prefecture, the Center also has a testing site in the Akita region.
The results of analysis and assessments performed at each site are used to develop higher-
quality products. The Center also performs key research and technology development
work from a long-term perspective, including research on the latest electronics
technologies, to the research in the new fields that will be also important to CQA
operations.
In April 2000, the CQA Reliability Center obtained ISO/IEC17025 certification, as the
first such site in Japan in the area of environmental testing of electronic components. The
Hirasawa site of the CQA Reliability Center obtained ISO/IEC17025 certification in
January 2007 for chemical testing of harmful substances analysis.

Reliability and Safety Testing


CQA products undergo rigorous and extensive testing under
every conceivable condition to ensure that they deliver the
performance required by customers under their respective use
environments and conditions. These tests verify that the tested
products have the quality required under international and Scanning electron
industry-wide standards, customer standards, as well as CQA microscope (SEM)
internal standards.

26
Failure Analysis
The Center analyzes failures relating to reliability and safety,
clarifying the root causes, and providing the results to the Laser microscope
business groups for improvement.

Application Technology Support


The Center provides support for practical application of
technologies in electronic components including electrode Random vibration testing
formation, terminal soldering, protection using resin, and machine
packaging.

Evaluation of Restricted Substances


The center evaluates and analyzes products to ensure
compliance with environmental regulations regarding restricted Constant Temperature &
materials and substances, both for major constituents and Humidity Chamber
secondary materials. Equipment for testing is also installed at
product sites in Japan as well as overseas, to provide evaluation
and analysis capabilities.

Measurement Control Center


Periodic calibration is essential to maintain and regulate the accuracy of measurement
equipment. Based on a product quality system that conforms to ISO 9001 standards,
CQA operates sophisticated calibration equipment and highly reliable calibration services
in-house.
Measurement reference equipment meeting national and international traceability
requirements is installed at the Measurement Control Center and is used to maintain and
regulate the accuracy of the company's measurement devices. A companywide labeling
system for measurement devices serves for identification, and information on the devices
is recorded and managed by computer.
Using a periodic schedule based on accumulated past data, employees of the
Measurement Control Center make rounds in the CQA Measurement Testing Service
Car, providing testing and calibration services.

27
If testing reveals a problem, the Measurement
Control Center informs the division using the
measurement device, which then decides in the most
appropriate course based on the results of the tests.

When a problem with a measuring device is detected, Environmental test chamber


environmental testing is performed as required to
determine the reliability of the equipment and the
degree of stability.

Testing processes are automated as much as possible, Block gauge auto calibration system
using the latest state-of-the-art devices, in order to
minimize the risk of human error and maximize the
accuracy of measurement data.

An automatic calibration system developed in-house


aims at further improving measurement data Surface shape measurement system
accuracy and speeding up the calibration process.

CS (Customer Satisfaction) Activities


CQA supplies components as a flagship product line not only to electronic device set
manufacturers directly linked to end consumers, but also to assembly manufacturers and
component manufacturers. In doing so, CQA makes every effort to ensure customer
satisfaction (CS), through the three avenues as follows, and strives to achieve general
satisfaction, encompassing quality, cost, delivery, environmental efforts and services, in
order to become the company of choice for potential customers.

 Supplier evaluation information, whereby our business customers evaluate CQA


products
 Product-related complaint information from our customers
 CS evaluation, whereby sales staff members evaluate CQA products from a
customer's point of view

28
Supplier Evaluation Information
CQA obtains the results of supplier evaluations as completed by its customers. The
evaluation ranks the different levels of customer satisfaction, with an "A" indicating that
the customer is fully satisfied. CQA keeps track of changes in the percentage regarding
the A rank, and passes this information to the relevant division responsible to improve
CS.

Product-Related Complaints
CQA maintains a database of product-related complaints filed by customers both in India
and overseas. Information is sent online to the involved departments without delay, so
that swift action can be taken to improve CS.
In addition, this system is designed to automatically send significant complaints to top
management.

CS Evaluation
In order to become the supplier of choice for our customers, our sales staff members
make sure that they understand the needs of our customers. CQA makes every effort to
improve CS by quickly understanding the details of customer complaints, and providing
feedback to the relevant divisions so that they may take necessary remedial action.

And there many sub dept. for checking quality of the product.
1. Standard Room.
2. FAI (Final Assurance Infection).
3. CAI (customer assurance inspection)
4. WRAP (Warranty Related Action Points).
5. RFI (Ready for Inspection).
6. RFD (Ready for Dispatch).
7. NOVA-C (New Overall Vehicle Audit-Customer).
These all departments are for the customer satisfaction.

29
A BREIF INTRODUCTION
Mahindra HARIDWAR Plant is actually an assembly line plant normally involved in the
production of:
1. Bolero 2. Alfa 3. GIO 4.Champion

5 models of Bolero are being produced which are


1. SLX
2. SLE
3. DI
4. Longer(Non-AC)
5. Longer (AC)

Production of Bolero involves assembling of parts at 4 different levels or lines:


1. Trim Line
2. Chassis Line
3. Engine Line
4. Main Line

Trim Line
 Trim line involves the body and its various fitments.

Major Steps:
1. Removal of Facia.
2. Fitment of Felt, Firewall, PU foam, Roof Sealer (if absent), Roof Covering, etc.
3. Accelerator cable, Speedo Cable,Bonnet Cable, Clutch Beading fitment.
4. Brake Booster; Accelerator, Clutch and Brake Pedal fitment.
5. Combination Lamp, Instrument Cluster, Battery fitment.
6. Lock and Windscreen Fitment.
7. Blower Fitment and various Harness wire fittings.

Chassis Line
Steps following in
1. Chassis inversion and Rear axle fitment
2. Suspension Fitment involving leaf spring and rear shock absorber and upper and
lower suspension arms along with springs and shock absorbers
3. Pressure Application for joining upper and lower suspension arms
4. Filling differential oil and GB valve fitment
5. Power steering ,Stead wire, Stabilizing wire fitment
6. Fuel tank, Fuel pipe and Breather pipe fitment

30
Engine Line
Steps
1. Pressure plate and Clutch plate mounting on Engine
2. Assembling Transmission and Engine and mounting belt connecting Engine and
power steering.
3. Power Steering oil tank and Brake booster hose pipe fitment
4. Engine harness fitment and some of its connections like ground connections,
connections to compressor, alternator, fuel injector pump and transmission
system.

Main Line
Steps
1. Brake Beading fitment( including that for handbrake) and connections to GB
valve and front and back wheels
2. Engine mounting on chassis, propeller shaft fitment
3. Body mounting followed by basic connections such as Brake Booster
connections, Battery connections, Power window switch connections etc.
4. Fascia preparation involving Headlight fitment, coolant tank fitment etc.
5. Radiator Fitment followed by Fascia Mounting, Brake and Clutch Bleeding and
Tire mounting
6. Horn and Bonnet Lock fitment, Air filter mount and Headlight and AC pipe
connections.
7. Ac gas filling , Steering fitment and finally Wiper Fitment

31
CONCLUSION

What did I learn?


Summer training is an integral part of any B-Tech curriculum in the country. It serves as
the only direct exposure to an organization and its ways of functioning during the entire
curriculum. The summer training in any technology course is very important for the
students and it will help in future when an student goes to company.

“This program is the most effective aid in enabling the students to relate technical
theory to practice, and in making an informed career choice." Courses are intended
to provide a cross-functional orientation in basic technical concepts, quantitative methods
and analytical skills. Since immediacy of application is not stressed at this stage, the
person can take his own time to reflect on the subjects and internalize the concepts. Once
this conceptual framework is in place, it needs to be tested under real life conditions. The
technical institutes cannot simulate the real life conditions of an engineer. Although
innovative tools like case studies do attempt to address these limitations, they fail to
capture the reality. Therefore, we need some mechanism by which transfer of skills takes
place from the classroom to the workplace. Summer training beautifully fills this gap. It
gives him a chance to experiment because mistakes are not penalized while hard work is
definitely rewarded. Not only does a student get an opportunity to implement the
concepts, but skill learning is faster because of the constant and immediate feedback from
his peers and managers.

Students, especially those with little or no work experience, are slightly confused about
the discipline in which they want to specialize and pursue their career. Summer training
gives them an opportunity to closely interact with the organization and help identify the
pros and cons of various career choices. Armed with this knowledge and understanding,
they can take an informed decision about the portfolio elective courses in which they
want to specialize

Prof. K. Unnikrishnan Nair says:

“The student should not rigidly confine himself to the narrow boundaries of the project
which he is currently undertaking. He should also observe the processes, interactions and
the human relations in the organization. Just observing people at their work could be a
tremendous learning experience.”

During his summer training, which is for a period of one/two months, the trainee gets to
see the culture of the organization, how the organization copes with crises and how the
engineers handle stress under varied situations. When he goes back to the institute, he can
share his experiences with his fellow classmates and learn from their individual
experiences. This will help him in not only mentally preparing himself about the lifestyle
and pressures of a engineer but also evolving a distinct way of dealing with diverse
business situations.

32
How will this experience help me in the future?
The meaning of Training is to learn a skill. Training is the act of increasing the
knowledge and skill of a person for doing a particular job. Training enables to acquire
latest skills, thus increase versatility for qualification for busting carrier. It provides better
safety, remuneration and security. It also enables to drive greater satisfaction and utilize
the full skills and capacity. Proper training teaches proper operation and changes the
wrong attitude and also tells the safe points.
You just imagine student who are in 2nd and/or 3rd year of their degree course right now
they will spend a few years finishing college and a few year just learning the ropes at
their first job. So it will really be about 5 year before their career really starts. What will
the software technology would be like at that student can work on acquiring right now to
ensure that they are well positioned to thrive.
Summer training for engineering students is important because it is the time to obtain as
much knowledge about their field. As an engineering student, training can help you to
implement the concepts you learned at your classes. After learning concepts from
professors, lecturers and also from books we feel like we now know everything and we
can now develop any type of program based on those concepts but the fact is that learning
a concept and implementing a concept both are different things, both are tightly coupled
but still there are differences. It is true that without learning a concept you can’t
implement it, but just learning a concept doesn’t mean that you can correctly implement
it.
Actual challenges appear when we have to develop real-world software. All the
software/program based on the concepts you may had already learned during your
engineering course, but there are lot more things involved in developing a live application
(that is to be used by some business organization) and those things can be learned only
from a good software companies productive environment and never taught at classes.
Training helps you to learn those things that are available only at production environment
and by working on a live project.
Training develops confidence in whatever we have learned. After completing training
you will feel much confident about your field. If your concepts not clear or you have
confusions with them, then at the time of interview, exams or in professional life you face
many problems. All experienced people always like to hear accurate to the point solution
to every problem, your carrier depends on your sharpness, intelligence and of-course your
confidence. So as much as possible, clear your confusions and get new ideas of your

33
34

Das könnte Ihnen auch gefallen