EPC FOR AL DABB'IYA SURFACE FACILITIES-PHASE III Project No. : P02065 Coating Release Alignment Drawing No: CORRIDOR: R02 LINE ID: EG-02 Dia - 20 Inch DATE: 06-Dec-2018 Release.- EG02-RN-055 Stringing Bending Weld Details Main RT Weld Repair Details First RT Details Second RT Deatils Manual UT MPI Hardness Testing Heat Thickn S.No. Chainage Pipe Number Number Length ess Stringing Stringing Bending Rep. Bending Bend Bend WPS Joint Number Joint Rep. No Joint Date Report No. Date Status Report No. Date WPS followed Report No. Date Status Report No. Date Status Rep. No Date Status Report No. Date Rep. No Date Rep. No Date No Date Angle Type Followed