Sie sind auf Seite 1von 2

COSH-SEMINAR EXAM 2.

Plan a route that causes minimal damage

1. 6 important parts of scaffolding 3. Determine the depth your project requires

1. SOLE BOARD 4. Determine the type of soil you will be digging


in 5. Other possible considerations.
2. BASE PLATE
6. 5 important contents of inspection grab
3. STANDARDS
bag
4. LEDGER
1. Checklist, Pro forma Guidance Notes
5. MAIN TRANSOM
2. Regulation, Standard and codes of Practice
6. INTERMEDIATE TRANSOM
3. Safety Notices Alerts, Bulletin or Advice
7. FIX COUPLTER
4. Standard Operating Procedure
8. SWIVEL COUPLER
5. Accident Statisitcs or Data, Accident
2. 3 basic steps of JHA Investigations Details, Sick and Leave.

1. Break down the job 7. 5 important contents of emergency grab


bag
2. Identify the hazards and potential accidents
1. List of Contact Persons/ govt. agencies, Etc.
3. Recommend Safe Procedure and Protection
Measure 2. Food & Snack Bars

3. 5 elements of PPE program 3. Water

4. Medicine Kit

5. Transistor Radio with Extra Battery

6. Safety Helmet

7. Magnifying Glass

8. Danger Tag

9. Yellow Crayon
4. 5 samples of confined spaces
1. TANKS 8. 5 important contents of investigation grab
bag
2. TUNNELS
1. Hearing and Eye and Protection
3. SILOS
2. Paper rolls or Towel
4. MANHOLES
3. Plastic Containers for Sample
5. SEWER
4. Hi-vizual Orange Vest
6. TRENCHES
5. Torch w/ batteries
7. EXCAVATION
6. Camera
5. 5 steps of excavation procedure:
7. Tape Measure
1. Call the local or government utility location
service 8. Recorder and Space Tape
9. 5 effects of contact of electricity S-12 SAFETY AND HEALTH
INFORMATION1 (SHI)
1. Threshold of sensation 1ma
S-13 CONSTRUCTION SAFETY AND
2. Mild Shock 2ma HEALTH TRAINING (CSHT)
3. Muscle contraction 20ma S-14 CONSTRUCTION SAFETY AND
4. Suffocation Possible 30ma HEALTH REPORTS(CSHR)

5. Heart Stop Beating 100ma S-15 CONSTRUCTION WORKERS


SKILLS CERTIFICATES (CWSCE)
6. Breathing Stop 300ma
S-16 WORKERS WELFARE FACILITIES
(WWF)
10. 5 machine guarding controls S-17 COST OF CONSTRUCTION
SAFETY AND HEALTH PROGRAM
1. Enclosure
(CCSHP)
2. Fixed Guard
S-18 MISCELLANEOUS
3. Pull-Back device
S-19 VIOLATIONS AND PENALTIES
4. Interlocked Guard (VP)

5. Sensor

11. Enumerate the 19 elements of D.O. 13


S-1 DEFINITION OF TERMS (DT)

S-2 JURISDICTION (J)

S-3 DELEGATION OF AUTHORITY &


ACCREDITATION (DAA)

S-4 COVERAGE ©

S-5 CONSTRUCTION SAFETY AND


HEALTH PROGRAM (CSHP)

S-6 PERSONAL PROTECTIVE


EQUIPMENT (PPE)

S-7 SAFETY PERSONNEL (SP)

S-8 EMERGENCY OCCUPATIONAL


HEALTH PERSONNEL AND
FACILITIES (EOHPF)

S-9 CONSTRUCTION SAFETY


SIGNAGE’S (CSS)

S-10 SAFETY ON CONSTRUCTION


HEAVY EQUIPMENT (SCHE)

S-11 CONSTRUCTION SAFETY AND


HEALTH COMMITTEE (CSHC)

Das könnte Ihnen auch gefallen