9.11.

2018

VO OSD

1. Additional soil quantity to make counter berm [quantity in trip]-calculate quantity in meter
cube
2. Coconut trunk for remedial works [quantity]
3. Additional soil quantity (import from outside, and export pit soil from PMU) at remedial
works [quantity in trip]

VO EXTERNAL ROAD

1. Slope near drainage


2. Additional crusher run and quarry dust thickness for PBT road [from 75mm to 450mm]
3. To raise up road lighting footing to road level

JKR ROAD (ACDC)

1. Request survey drawing from Trenergy