Sie sind auf Seite 1von 1

• Manages department and overall expectations pertaining to setting accurate schedules, costs

and resources.
• Ensures delivery against QA department goals and objectives.
• Provides necessary definition, development and deployment of product quality assurance
strategy.
• Provide leadership for the company’s Quality Assurance/ Quality Control Process.
• Directly supervises quality assurance team, lead quality assurance engineers and testers
including managing staff performance evaluations and career development activities.
• Works closely with the Joinery Factory to achieve high quality of works and output on joinery,
false ceiling, wardrobe and kitchen cabinet manufacture & installation.
• To recommend actions to correct observed quality deficiencies.
• Review product submittals against specifications.
• Review & approval of all associated suppliers issued quality assurance control documentation,
problem solving of field inspection non-conformances and deviations from suppliers during
inspection life cycle.
• Develop QA/QC Documentation and Reporting Systems for the Project and Department
(Manuals, Plans, ITPs, Procedures, Instructions, Inspection Forms and Quality Records, etc) for
conducting day to day operations, tests and inspections of products, services or processes.
• Develop & implement the Internal Compliance Audit Program under ISO9001:2008 QMS
System.
• Maintains product consistency throughout product cycle, to include the design, define and build
phases through quality checkpoints and testing.
• Manages the planning and execution of product testing efforts.
• Works with project managers to develop project schedules and resource allocation models for
QA related projects and other activities such as software deployment, customer integration, and
professional services validation.
• Ensure that all drawings are in line with project scope, contract specification and the company
quality standards.
• Check supplied materials, furniture or equipment match their specified areas and locations in
the drawings.
• Responsible for the final handover of the project, till defect liability period

Das könnte Ihnen auch gefallen