Beruflich Dokumente
Kultur Dokumente
PADA
TO
No. SA-9415-0071-TF-XXX-06
A. I. PROJECT MANAGEMENT
Procedures
NO. SPEC. NO. DESCRIPTION
1 PP-MN-GG-001 Permitting and Regulatory Compliance Plan
2 PP-MN-GG-003 Project Control Procedures
3 PP-MN-GG-006 Change Order Procedure
4 PP-MN-GG-007 Contractor Monthly Report Procedure
5 PP-MN-GG-008 Filling Procedure
6 PP-MN-GG-009 Communication Procedures Between COMPANY and CONTRACTOR
7 PP-MN-GG-010 Quality Audit Procedure
8 PP-MN-GG-011 Value Engineering Study Procedure
9 PP-MN-GG-012 HAZOP Study Procedure
10 PP-MN-GG-013 Construct-ability Study Procedure
II. PROCUREMENT
Procedures
NO. SPEC. NO. DESCRIPTION
1 PP-PC-GG-003 Shipping and Traffic Instruction Procedure
2 PP-PC-GG-004 Packing and Marking Instruction
3 PP-PC-GG-005 Spare Parts Procedure of Equipment
III. CIVIL
Procedures
NO. SPEC. NO. DESCRIPTION
1 PP-CI-CC-005 Construction Procedure for Foundation and Anchor Bolt Setting Works
2 PP-CI-CI-002 Re-greening
3 PP-CI-CI-003 Jungle Clearing and Danger Tree Cutting
4 PP-CI-GG-001 General Earthwork
5 PP-CI-GG-003 Piling Test Procedure
6 PP-CI-GG-005 Civil Inspection and Testing Services
7 PP-CI-RL-001 Soil Cement Road Construction and Testing Procedure
404867380.doc
Tripatra Fluor Consortium
Flexible Program Management Project
Page 2 of 6
IV. ELECTRICAL
Procedures
1 PP-EL-EE-001 Electrical Above Ground Installation
2 PP-EL-EE-002 Electrical Under Ground Installation
3 PP-EL-EE-003 Power Pole and Power Line Fabrication & Installation
4 PP-EL-EE-004 Electrical Pre-commissioning Procedures
5 PP-EL-EE-006 Electrical Energizing Procedures
Specifications
1 SP-EL-EE-001 General Specification: Electrical
2 SP-EL-EE-002 Distribution Class Pad Mounted Power Transformer (Below 2,500 KVA)
3 SP-EL-EE-003 Substation Class Pad Mounted Power Transformer (Above 2.500 KVA)
4 SP-EL-EE-004 Pole Mounted Transformer
5 SP-EL-EE-005 Induction Motor-Below 200 HP
6 SP-EL-EE-006 Induction Motor-Above 200 HP
7 SP-EL-EE-007 Low Voltage Switchgear, MCC and Bus Duct
8 SP-EL-EE-008 Medium Voltage Switchgear, MCC and Bus Duct
9 SP-EL-EE-009 Uninterruptible Power Supply
10 SP-EL-EE-010 Automatic Recloser
11 SP-EL-EE-011 Capacitor Bank
12 SP-EL-EE-012 Distribution Panel Board
13 SP-EL-EE-013 Safety Switch, Circuit Breaker & Combination Motor Starter
14 SP-EL-EE-014 Powerline Hardware
15 SP-EL-EE-015 Low Voltage Power Cable
16 SP-EL-EE-016 Medium Voltage Power Cable
17 SP-EL-EE-017 Wire Power Conductor
18 SP-EL-EE-018 Cable Tray
19 SP-EL-EE-019 Lighting and Fixtures
20 SP-EL-EE-020 480 Volt Variable Frequency Drive
21 SP-EL-EE-021 Medium Voltage Variable Frequemcy Drive
22 SP-EL-EE-022 Switchboard
Powerline
404867380.doc
Tripatra Fluor Consortium
Flexible Program Management Project
Page 3 of 6
V. INSTRUMENT
Procedures
1 PP-IN-II-001 Instrument Installation Design
2 PP-IN-II-002 Instrument Piping System-Field Pressure Testing
3 PP-IN-II-003 Instrumentation Calibration and Test Procedure
4 PP-IN-II-004 Control System Loop Check Procedures
Specifications
1 SP-IN-II-001 General Specification of Instrumentation
2 SP-IN-II-002 Instrument With Package or Mechanical Unit
3 SP-IN-II-003 Tropic Proofing for Instrumentation
4 SP-IN-II-004 Instrument Wiring
5 SP-IN-II-005 Instrument Materials
404867380.doc
Tripatra Fluor Consortium
Flexible Program Management Project
Page 4 of 6
VI. PIPING
Procedures
1 PP-PI-PP-001 Piping Cleaning Procedure
2 PP-PI-PP-006 Piping Flexibility Analysis
3 PP-PI-PP-008 Piping Fabrication, Erection, Inspection and Testing
4 PP-PI-PP-009 Pipeline Construction Inspection & Testing
5 PP-PI-PP-010 Piping Tie-in Specification
6 PP-PI-PP-011 Trenching and Backfilling for Pipeline
7 PP-PI-PP-012 Handling & Inspect for Burying Coated Pipe
8 PP-PI-PP-013 Pipe Welding & Weld Inspection
9 PP-PI-PP-014 Field Welding and Weld Repair of Pipeline
Specifications
1 SP-PI-PP-001 General Specification Piping
2 SP-PI-PP-002 Piping Specification (Previous CPI-J2D)
3 SP-PI-PP-003 Piping Support Elements
4 SP-PI-PP-004 Coating and Wrapping for Piping
5 SP-PI-PP-005 Hot Insulation
6 SP-PI-PP-006 Line Pipe Material
7 SP-PI-PP-007 Stainless Steel Piping Fabrication
8 SP-PI-PP-008 Low Pressure Fiberglass Pipe
9 SP-PI-PP-009 Specification for Fire Hydrant and Fixed Monitor
10 SP-PI-PP-010 Specification for Portable Extinguisher
VII. MECHANICAL
Specifications
1 SP-ME-ME-001 ANSI Pump Specification
2 SP-ME-ME-002 Above 500 HP Centrifugal Pumps Specification (API)
3 SP-ME-ME-003 Below 500 Hp Centrifugal Pumps Specification (API)
4 SP-ME-ME-004 Reciprocating Pumps Specification (Plunger)
5 SP-ME-ME-005 Reciprocating Pumps Specification (Piston)
6 SP-ME-ME-006 Centrifugal Slurry Pump
7 SP-ME-ME-007 Centrifugal Fire Pumps
8 SP-ME-ME-008 Diesel Engine for Centrifugal Fire Pumps
9 SP-ME-ME-009 Heavy Duty Twin Screw Positive Displacement Pump for Multiphase Services
10 SP-ME-ME-010 Vapor Recovery Unit (VRU)
11 SP-ME-ME-011 Air Cooled Heat Exchanger
12 SP-ME-ME-012 Shell & Tube Heat Exchanger For General Refinery Services
13 SP-ME-ME-013 Air Conditioning & Ventilation
14 SP-ME-ME-014 Mechanical Flotation Unit Specification
15 SP-ME-ME-015 Oil Removal Filter Specification
16 SP-ME-ME-016 Air Compressor Specification
17 SP-ME-ME-017 Packaged Gas Compressor Specification
18 SP-ME-ME-018 Packaged Gas Liquid Cylindrical Cyclone Compact Separator (GLCC)
404867380.doc
Tripatra Fluor Consortium
Flexible Program Management Project
Page 5 of 6
VIII. CONSTRUCTION
Procedures
1 PP-CO-GG-001 Scaffolding Procedure
2 PP-CO-GG-002 Procedure for Site Mobilization Plan
3 PP-CO-GG-003 Insulation Installation Procedure
4 PP-CO-GG-004 Security Procedure
5 PP-CO-GG-005 Material Handling and Warehousing
6 PP-CO-GG-006 General Requirement for Storage, Preservation and Protection
7 PP-CO-GG-007 Material Control
8 PP-CO-ME-001 Equipment Erection and Installation
9 PP-CO-WW-001 Waste Disposal Procedure
IX. QA/QC
Procedures
1 PP-QC-GG-001 Project Quality Assurance Plan
2 PP-QC-GG-002 QA/QC Procedures
3 PP-QC-GG-003 Inspection and Test Plan at Shop
4 PP-QC-GG-004 Inspection and Test Plan at Field
5 PP-QC-GG-005 NDT Procedure
6 PP-QC-GG-006 Welding Procedure
7 PP-QC-GG-007 Welder Qualification and Certification
8 PP-QC-GG-008 Fabrication Quality Control Plan
9 PP-QC-TK-001 Field Fabrication Tank Inspection and Testing Procedures
10 PP-QC-ME-001 Field Testing Procedure for Packaged Equipment
X. GENERAL COMMISSIONING
Procedures
1 PP-SC-GG-001 Pressure Test Procedure
2 PP-SC-GG-003 Mechanical Acceptance Procedure
3 PP-SC-GG-004 Acceptance Package for each System
4 PP-SC-GG-006 Pre Commissioning Review
5 PP-SC-GG-007 Handover Document Skeleton and Procedure
XI. Miscellaneous
1 SP-IN-II-007 Pre-Fabricated Building
404867380.doc
Tripatra Fluor Consortium
Flexible Program Management Project
Page 6 of 6
404867380.doc