Sie sind auf Seite 1von 6

SN. DESCRIPTION No.

Length Breadth Height


1 E/W in excavation
For column 1 Area = 50.24 1.5
For benches 8 1.5 0.75 1.5
Total
2 6'' stone soling works
For column 1 Area = 50.24 0.5
For benches 8 2.5 0.75 0.5
Total
3 PCC work in 1:3:6 ratio
For column 1 Area = 50.24 0.33
For benches 8 2.5 0.75 0.33
Total
4 Form works
For columns
Trapezoidal section 4 Area = 12
Circular portion 1 Area = 21.98
For benches 4 4 1.75
Total
5 PCC for RCC works (1:1.5:3)
For columns
Trapezoidal section 1 V= 40
Cylindrical column 1 Area = 3.14 3.25
Benches 4 4 1.75 0.33
Total
6 Second class brick works in 1:4 C/S mortar
On top of columns 1 Area = 3.14 1.25
Base of benches 8 1.75 0.75 0.75
Circular base of columns 1 27.28 0.75 2.25
Upper base of column 1 20.46 0.75 6.75
Total
7 Plaster works in 1:6 C/S mortar
Feet base of benches 16 1.25 3
Top of benches 4 4.5 2.41
Total
8 Punning works
Feet base of benches 16 1.25 3
Top of benches 4 4.5 2.41
Total
9 Marble works
First base of column 1 Area = 11.28
Second base of column 1 Area = 4.46
Vetical section of first base 1 Circumference = 27.28 1
vetical section of second base 1 Circumference = 20.46 0.5
Total
10 Dry brickwork for flower bed of landscaping
2 150 0.33 0.75
11 Soil filling works
Back fill excavation 1 @ 45 % of excavation
Base of column (inside circular portion) 1 Area = 54.56 1.75
Total
12 Reinforcement works including bending, cutting, and binding
16 mm dia. @ 1.58 Kg/m.
Trapezoidal section @ 6" c/c spacing 16.00 1.52
Inside circular column 16.00 1.90
12 mm dia. @ 1.39 Kg/m
Base net Both sides 16 1.22

8 mm dia. Stirrups @ 0.39 Kg/m


Trapezoidal section 4 5.03
Veritcal columns (trapezoidal) 7 2.59
Circular columns 8 2.59
Binding wire LS
Total
Quantity Units Remarks

75.36
13.5
88.86 Cu.ft.

25.12
7.5
32.62 Cu.ft.

16.58
4.95
21.53 Cu.ft.

48 Trapezoidal formula
21.98 Circular portion
28
97.98 Sq.ft.

40 Volume of trapezoid
10.21 Cylinder
9.24
59.45 Cu.ft.

3.93
7.88
46.04
103.58
161.41 Cu.ft.

60 Both face
43.38
103.38 Sq.ft.

60 Both face
43.38
103.38 Sq.ft.

11.28
4.46
27.28
10.23
53.25 Sq.ft.

74.25 Cu.ft.

39.99
95.48
135.47 Cu.ft.

38.54
48.16
27.11

7.85
7.07
8.08
50
186.80 Kg.
Sno. Description Quantity Units Rate
1 E/W in excavation 88.86 Cu.ft. 65.40
2 6'' stone soling works 32.62 Cu.ft. 90.35
3 PCC work in 1:3:6 ratio 21.53 Cu.ft. 264.38
4 Form works 97.98 Sq.ft. 66.84
5 PCC for RCC works (1:1.5:3) 59.45 Cu.ft. 404.96
6 Second class brick works in 1:4 C/S mortar 161.41 Cu.ft. 344.41
7 Plaster works in 1:6 C/S mortar 103.38 Sq.ft. 9.13
8 Punning works 103.38 Sq.ft. 21.52
9 Marble works 53.25 Sq.ft. 203.24
10 Dry brickwork for flower bed of landscaping 74.25 Cu.ft. 126.98
11 Soil filling works 135.47 Cu.ft. 29.43
12 Reinforcement works including bending, cutting, and binding 186.80 Kg. 122.21
Total (A)
15 % contractor's profit
Sub total (B)
VAT @ 13 % of B
Net total

In words : One Lakh Ninty Six Thousand Ninty Four Rupees and fourteen Paisa Only.
Amount Remarks
5811.05
2947.30
5691.95
6548.54
24072.73
55593.14
943.74
2224.59
10822.52
9428.40
3986.52
22829.19
150899.68
22634.95
173534.64
22559.503
196094.14