Beruflich Dokumente
Kultur Dokumente
75.36
13.5
88.86 Cu.ft.
25.12
7.5
32.62 Cu.ft.
16.58
4.95
21.53 Cu.ft.
48 Trapezoidal formula
21.98 Circular portion
28
97.98 Sq.ft.
40 Volume of trapezoid
10.21 Cylinder
9.24
59.45 Cu.ft.
3.93
7.88
46.04
103.58
161.41 Cu.ft.
60 Both face
43.38
103.38 Sq.ft.
60 Both face
43.38
103.38 Sq.ft.
11.28
4.46
27.28
10.23
53.25 Sq.ft.
74.25 Cu.ft.
39.99
95.48
135.47 Cu.ft.
38.54
48.16
27.11
7.85
7.07
8.08
50
186.80 Kg.
Sno. Description Quantity Units Rate
1 E/W in excavation 88.86 Cu.ft. 65.40
2 6'' stone soling works 32.62 Cu.ft. 90.35
3 PCC work in 1:3:6 ratio 21.53 Cu.ft. 264.38
4 Form works 97.98 Sq.ft. 66.84
5 PCC for RCC works (1:1.5:3) 59.45 Cu.ft. 404.96
6 Second class brick works in 1:4 C/S mortar 161.41 Cu.ft. 344.41
7 Plaster works in 1:6 C/S mortar 103.38 Sq.ft. 9.13
8 Punning works 103.38 Sq.ft. 21.52
9 Marble works 53.25 Sq.ft. 203.24
10 Dry brickwork for flower bed of landscaping 74.25 Cu.ft. 126.98
11 Soil filling works 135.47 Cu.ft. 29.43
12 Reinforcement works including bending, cutting, and binding 186.80 Kg. 122.21
Total (A)
15 % contractor's profit
Sub total (B)
VAT @ 13 % of B
Net total
In words : One Lakh Ninty Six Thousand Ninty Four Rupees and fourteen Paisa Only.
Amount Remarks
5811.05
2947.30
5691.95
6548.54
24072.73
55593.14
943.74
2224.59
10822.52
9428.40
3986.52
22829.19
150899.68
22634.95
173534.64
22559.503
196094.14