Concrete Works Pour Inspection Record

Purpose of Inspection Record


Ensure that the following is executed correctly:
The concrete pour is carefully monitored and all relevant details are recorded in a coherent manner.
Concrete
T2-T3 o
Project N : Consistence
Project Name: Date of Pour: Page: of
Windfarm Class:
Concrete Slump Range /
Structure Ref: Location: Strength Class: Target (mm):
Concrete Mix Slump
Weather: Tolerance (mm): Min Max
Reference:
3
Delivery Delivery Time Temp Original Water (L) Final Volume (m )
Load
o
N. Vehicle Ticket Start Finish air Slump Slump
Registration Reference (mm) (mm) Comment / Test
Discharge Discharge Cube References
Batched Original Max Added Load Total
concrete

T2-CV- -QC011-BSCNC2 Page 2 of 3