This inspection record is intended to carefully monitor and record all relevant details of a concrete pour in a coherent manner. It includes spaces to log details of the concrete delivery such as vehicle registration, ticket reference, time, temperature, original and final slump measurements, water added, and volume poured. Comments and cube reference numbers are also included to fully document the pour.
This inspection record is intended to carefully monitor and record all relevant details of a concrete pour in a coherent manner. It includes spaces to log details of the concrete delivery such as vehicle registration, ticket reference, time, temperature, original and final slump measurements, water added, and volume poured. Comments and cube reference numbers are also included to fully document the pour.
This inspection record is intended to carefully monitor and record all relevant details of a concrete pour in a coherent manner. It includes spaces to log details of the concrete delivery such as vehicle registration, ticket reference, time, temperature, original and final slump measurements, water added, and volume poured. Comments and cube reference numbers are also included to fully document the pour.
Ensure that the following is executed correctly: The concrete pour is carefully monitored and all relevant details are recorded in a coherent manner. Concrete T2-T3 o Project N : Consistence Project Name: Date of Pour: Page: of Windfarm Class: Concrete Slump Range / Structure Ref: Location: Strength Class: Target (mm): Concrete Mix Slump Weather: Tolerance (mm): Min Max Reference: 3 Delivery Delivery Time Temp Original Water (L) Final Volume (m ) Load o N. Vehicle Ticket Start Finish air Slump Slump Registration Reference (mm) (mm) Comment / Test Discharge Discharge Cube References Batched Original Max Added Load Total concrete