2 Firefighting work (pipe repainting, fire hose cabinet) 1st, 2nd, 3rd floor
3 Roof waterproofing (membrane+insulattion) Roof & Upper Roof Deck
4 External Plastering work (axis 3 & 1) 1st, 2nd, 3rd & Roof
1 HVAC duct work and insulation Ground & 1st floor
2 Firefighting work (pipe repainting, fire hose cabinet) 1st, 2nd, 3rd floor
ZONE 2
2 Concrete pouring
3 Deshuttering
4 Sanitary piping
5 Backfilling, compaction, termite and rebars installation (grade slab)
Legend :
PLANNED