Sie sind auf Seite 1von 60
Operation Instruction of HBT60S1816.145R Trailer Concrete Pump T ‘ SHANDONG HONGDA CONSTRUCTION MACHINE CO., LTD Mase yo ts om devery per —— ts ‘Mester oil * anal ceyinder261 |=} 261 piston s tone ol eae Master ol eylier eyes ‘Master oil 62rd 62 1S arent . ‘control ode ‘delivery cylinder | eyinde26t Lo} “ed || gion eo dead ctanbere | [snag Paar eine TFlL ilps i tars Se Avaciisry pum pike 23 icy Fol ot stemeond ie ses signal oi i Inge | | Bmeearetin i to dry ends . Hyily 3 capac Swingvalve m2piton | S| aimetion || _olleytinder stretches! ; calcite [7] 02tend | | [Swing ave ei epinge hea taba omit ¥ tba . ; a ae | very ep 6. 2. Reverse pumping working cycle of main oil system: To start Reverse Pumping, press Reverse Pumping Start and electromagnet DT2 will be snergized and pressure oil of main oil pump 3 will be in reverse pumping working cycle. (1) First half cycle of reverse pumping: 1. This machine has two type of concrete Selivery: high pressure small delivery volume and low pressure large delivery volume. User may select proper delivery mode according to requirements for concrete delivery height (or distance) and delivery volume. 2. Hydraulic system : payee ieee eae elias =| ae * Tees] ieee Z oe | cylinder comet |) haw | (a Tae = oe ol ae oles iS : a emp = siecle alt Master cil Bind 1 snd discharge tin cinder 262 |_| camber ae ioe Same] on |) alee if i Aine 25 ‘egproech the end and a leases signal’ Tyimon ipa Ty opersted, poo ‘stretches? "on | | stop be a tL ae bl Le ee | wT Gael] a. Saher It will enter the following second half cycle automatically. ’ 126.2 piston advances to approach end ae leases 2) RRGENER, + | sgt ol controled vale 22 in rght postions (2) Second half cycle of reverse pumping» 5 ‘Sour || eae Oana Bi srencingy ©) Hydeute rodless | [Master oft -| ay chanbere! E cxlinderacts to opersied [| make delivery ie ee Master oi 2 Silesian *| wake 23 cptinir 261 |g ima F=f 261 pion ‘ean ©) Gnright aia chamber! retreating” evere dictions 2 — 20-2 pisteredivances-te- approach nd and leses signal oil controlled valve ‘Aucliary pap ‘Bin reht wasitions? plot oil oi! contd valve 201 piston Bink positon! stretches e Swing valve levine Song vie ll roves 1 make Stabe comet cinder 20.1 to delivery cvlndor of 26.16 ond 202 piston chambers? retreats

Das könnte Ihnen auch gefallen