Beruflich Dokumente
Kultur Dokumente
14 Suttering & Form Works Lump Sum item 1.00 75000 75,000
Reinforcement
15 Footing Kg 288.75 65 18,769
Brick Works
1 Brick Works 9" External m2 170.00 0.00 0.00 Brick Wo
Brick Wo
2 Brick Works 4" External m2 21.00 0.00 0.00 Brick Wo
Brick Wo
3 Brick Works 4" Internal m2 162.00 0.00 0.00 Brick Wo
Brick Wo
4 Parapet Wall to Roof 4" m2 60.00 0.00 0.00
Floor Finishes
11 Ceramic tile floor to Bathrooms m2 9.76 0.00 0.00 Brick W
Brick W
Ceramic tile floor to Master bed room &
12 m2 14.02 0.00 0.00 Brick W
Drawing Room
Doors
1 Rolling Shutter 3m x 2.9m Nr 1.00 0.00 0.00
Windows
7 Windows 2m x 1.5m Nr 1.00 0.00 0.00
Mechanical Works
12 Drainage works complete Lump sum Item 1.00 0.00 0.00
14 Sanitary wares and taps etc. Lump sum Item 1.00 0.00 0.00
Electrical Works
16 Conduits and Box first fix Lump sum Item 1.00 0.00 0.00
15 Wires, Switch & Sockets Second Fix Lump sum Item 1.00 0.00 0.00
2 Finishes Works -
4 Contingency -
6 Profit -
7 GST -
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Ext.
Brick Work-Int.
Brick Work-Int.