Beruflich Dokumente
Kultur Dokumente
Operation
First the parts are loaded into Stations 1 and 2; The Rod
Guide into Station 1 and the bushings into Station 2. If the
cycle is complete, but component is not detected on nesting
fixture prior to index, a second loading attempt will be
made. If failed a second time, the operation is aborted and
the operator attention is required at this time.
Deflected parts will be gravity fed and dropped from the Press: No. 27.-2k & 23 Direct Acting
end of the machine base to a customer supplied bulk parts Air Presses with PRC-50-D-2
bin. A chute-clear sensor verifies the chute is clear. Control System