Indian Energy Sector at a glance, its Emerging need & AIM
R-APDRP IT Scheme
Building Blocks of IT Scheme
• Augmentation of
generation capacity;
• Rapid demand growth
Power For All efficiency improvement
• Inadequate energy access
• Power evacuation and
grid access
• Require smarter systems
Clean Energy • RE capacity increasing ~ 3000+ for power balancing to
Deployment MW added each year deal with variability &
unpredictability
• Poor operational efficiency
Operational • High system losses • Need for ability to control
Efficiency • R-APDRP/IPDS/DDUGJY/UDAY and monitor power flow till
Improvement have provided much needed customer level
support
• Real time system to
Enhancing • Poor system visibility enable better system
Consumer Service
• Lack of reliability visibility and consumer
Standards
participation
AIM of IT Scheme 4
To Improve customer
AIM IT enablement of services with the
distribution & retail supply establishment of IT
business activities in Infrastructure & deployment
electricity distribution of S/W applications modules
system for distribution & retails
supply business activities.
5
Data
Sub
Station Internal Report Generation and Center
Analysis of AT & C Losses
Utility Head
Office E A& Network
Analysis Tools
Distribution
Transformer MDAS
Spot
Billing Web
Portal GIS
Website
HT
Local
Office –
Pay
SDO/XEN
Bill
/SE/Other CC & B
Online
offices
Resolution of the
Verification & issues related to the
validation of the Neither the Fdr Input change Improvement of
system Energy, nor the B&P configuration dates the transactional
capabilities to data commensurate with w.r.t N/W and Large data
handle N/W the period of report supply connections
change on AMR
configuration
Data Analysis – A Key for the improvement of 9
60.00 56.60
51.91
50.68 50.06
50.00
38.68
40.00 36.98 37.17 36.48
35.53 35.10
32.70
31.08 30.85
29.19
30.00 27.98
23.68
21.58 22.55
20.18
18.34 19.19
20.00 17.22 17.94
16.15 15.54
14.39 14.73 14.10
10.15 10.56
9.17
10.00 6.77
0.00
Narwa Jind Barwa Bhiwa Chark Dabw Ellena Farida Fateh Gurga Hansi Hisar Hodal Narna Palwal Rewar Sirsa Tohan
na la ni hiDad ali bad bad abad on ul i a
ri
Baseline Loss (%) 67.31 51.91 35.53 39.72 50.68 29.19 23.68 16.15 31.08 6.77 30.85 20.18 50.06 39.95 39.95 27.98 15.54 56.60
AT&C Loss(%) 32.70 10.15 14.39 14.73 38.68 17.22 36.98 18.34 17.94 14.10 19.19 35.10 37.17 21.58 22.55 9.17 10.56 36.48
Use Case Demonstration – 13
625 616
600
500
Count
400
300
216 212 215 212 223
202 198 204 200
181
200 159149
140 131
115 122 111118 113 117116
109107 110 99 108102
100
0
Feb-17 to Mar-17 to Apr-17 to May-17 to Jun-17 to Jul-17 to Jun- Aug-17 to Jul- Sep-17 to Oct-17 to
Jan-18 Feb-18 Mar-18 Apr-18 May-18 18 18 Aug-18 Sep-18
Loss<15 625 616 709 672 735 744 754 744 767
15<Loss<30 159 181 115 109 110 111 113 117 108
30<Loss<50 149 140 131 107 122 118 99 116 102
Loss>50 216 212 202 198 204 200 215 212 223
14
Use Case Demonstration –
Impact Study on Data Analysis
Status of CCB-GIS-MDAS-EA Master Data
Consumer
CCB MATCH CCB-GIS
TOWN CCB CONSUMERS GIS_TOTAL available in EA NO. Of DTR NO. Of Pole
WITH GIS GAP
report
7592
8000
TOTAL HIGH
7000 CONSUMPTION CASES
6255
TRAPPED IN PRE
AUDIT IN OCT'18"
6000
5000
TOTAL HIGH
CONSUMPTION CASES
TRAPPED IN PRE
3490
4000
AUDIT IN NOV'18"
2880
3000
2384
2008
TOTAL HIGH
2000 CONSUMPTION CASES
1357
1330
TRAPPED IN PRE
1058
AUDIT IN DEC'18"
961
897
877
868
877
787
1000
535
472
434
416
424
377
363
328
259
271
262
216
197
196
188
156
137
144
124
123
135
122
104
91
71
67
45
26
22
17
7
2
0
0
0 0
Commercial Back Office(CBO) 17
Activities undertaken
Commercial
Back Office
team
CLOSING OF
EXCEPTION
HELP DESK FIELD TEAM
BINDER INITIATION
Connection released
(SMS sent to
consumer) S/D updates
billing and asset
details
Billing commences
Previous Process 20