GENERATOR BUILDING

OPERATION AND MAINTENANCE


CENTRAL UTILITY COMPLEX MAKKAH
SHAMIYAH 3rd EXPENSION OF HOLY HARAM MAKKAH
MAKKAH PROJECT CUC TC-14028
1. Work Order Summary:
PREVENTIVE MAINTENANCE FOR
WEEKLY MONTHLY QUARTERLY √
Work Order No.

Work Order Description : 13.8 KV MVSG HL-01 SPARE FEEDER-1 ( OUT GOING )
Task No : Priority : WO Type : PM
Request Date : _02/09/2015_____ Scheduled Start Date: _02/09/2015___ Completion Date: __02/09/2015____
Request Time : __08:00 AM _____ Scheduled Finish Date:_02/09/2015 __ Completion Time: ___1:30 HOUR __

Originator Assigned By Assigned To


Status Close Date : 02/09/2015

2. Manpower Estimation:

Craft Estimated Crew Size Estimated Labour Hours

3. Equipment Data:

Equipment No Equipment Description Project Location Sub-location-1


MVSG HL-01 SPARE FEEDER-1 CUC GENERATOR GROUND FLOOR
BUILDING

4. Material And Spare Part:

Item No Equipment No Description Date Used Qty Used Total Cost

Total
5. Actual Working Hours:

Employee Code Employee Name Equipment No Work Date Regular Hours Overtime Hours

BEMCO SERVICES CO. Page 1


6. Task instructions:

(HL-01) PREVENTIVE MAINTENANCE (PM) FOR 13.8 KV MVSG (OUT GOING)

Description Yes No Remarks


BREAKER
Check the equipments cleanliness OK
Check the tightness of tulip contacts. OK
Check the mechanical operation of breaker. OK
Check the closing and tripping coil resistance. OK
Check the mechanical parts lubrication. OK
CURRENT TRANSFORMER (CT)
Check the equipments cleanliness OK
Check the tightness of primary and secondary winding terminals. OK
EARTH SWITCH
Check the equipment cleanliness OK
Check mechanical operation of earth switch. OK
Check the control circuit and key lock segment. OK
Check the torque and polarity of cables. OK
CONTROL AND RELAY PANEL
Check materials, tools and any other impurities laid on the inside panel. OK
Check all termination of the relay back side. OK
Check VT and CT termination on the TTB. OK
Check VT and CT termination on the energymeter. OK
Check all indication lamps and replace busted indicator lamps OK
Check all grounding connections correct and right place. OK
Check function of switch gear. OK

REMARKS:
1. Some wires are connected without legs.
2. Cable try steel cover is missing.
3. Panel Lighting, Heater and Thermostat circuits are not working properly.
4. Panel cover some bolts are missing.

BEMCO SERVICES CO. Page 2


7. Safety Instructions:

Note: - Carry out all safety procedures before starting to work and observe safety precautions during the work
process.

8. For Project Manager Use:


Comments:

Name: ___________________________ Signature: _______________________

BEMCO SERVICES CO. Page 3