APPROVAL SHEET FOR CONCRETING WORK

Project……………………………………………………
Section/area checked………………………………
Date of Check…………………………………………..

Result of Result of
Inspection Inspection
Contractor Consultant
Remarks
OK Not OK OK Not OK

Form Work
1.1 Setting out
1.2 Line & Levels
1.3 Slab/beam heights
1.4 Slab/beam width
1.5 Rigidity and supports
1.6 Rigidity and water tightness
1.7 Making of concreting levels
1.8 Stop board arrangement

Reinforcement Work
2.1 Steel Quality
2.2 Accuracy of bar schedule
2.3 Bar surface free from dust
2.4 Compliance with structural details
2.5 Adequacy of fabrication
2.6 Adequacy of cover blocks
2.7 Removal of all loose binding wires
2.8 Bar spacing
2.9 Lap length and straggering
2.10 Surface Cleanliness

Concreting
3.1 Grade
3.2 Slump
3.3 No. of Test cubes
3.4 Estimated volume m3
3.5 Pouring method
3.6 Concrete finish level
3.7 Expected pouring date
3.8 Pouring time

Comments & Signature

Tech Officer Project Manager/Site Eng Consultant


Signature Signature Signature
Ref
Drawings