DETAIL A Cross Tie - 2 Cross Tie - 3


Scale 1 : 5 Cross Tie 1
A
Heating Surface Anchor A

10
10
Square plate 220x220 thick 63 mm Eyebolt M20
in scope of steel structure department GK-KD IS : 4190

50
50
10
A

410
410
50
80

3 x 240 = 720
B B
Washer OD 150 x ID 70 x 30 Thk

410
SA-204-A
Split Pin ISO 1234 -10 x 100-A
+ 124,350 m

450
E E

4 x 240 = 960
1080
1060

7 x 240 = 1680
C C

1780
1800
480

960
Rolled Thread M64

1780
1800

960

480
170
SECTION B-B
D Scale 1 : 5 Positioning of roof attachment
D

2 x 240 = 480
sleeve in accordance to
Position of Support Anchors -
Hanger Tubes 1.48760/00 213-0005
and Roof Basic Drawing 1.48760/00 215-0005.
Hanger Rod
B C
SA-193-B7 or B16
Positioning of roof attachment
E Positioning of roof attachment sleeve in accordance to E
sleeve in accordance to Position of Support Anchors -
Position of Support Anchors - Hanger Tubes 1.48760/00 213-0005
Hanger Tubes 1.48760/00 213-0005 and Roof Basic Drawing 1.48760/00 215-0005.
and Roof Basic Drawing 1.48760/00 215-0005.

+ 118,650 m
Bore Hole O 70 Cross Tie - 4 Cross Tie - 5 Cross Tie - 6 Positioning of roof attachment
sleeve in accordance to
F Position of Support Anchors - F

6550
Hanger Tubes 1.48760/00 213-0005
72,5 300 300 300 300 and Roof Basic Drawing 1.48760/00 215-0005.

10

10
10
O 38 x 10
Round Bar O 38

50
250

50
50
SA-36

240
80

2 x 240 = 480
O 59,5

410

410
410
G G

40

3 x 240 = 720
B a3

240
Attention Workshop! Bore Hole O 66
After completion of assembling Washer OD 130 x ID 70 x 30 Thk

190
Hanger Tubes to the Crossties, SA-204-A
the Roof sleeves are to be 10
welded to the Tubes!

240
Hexagonal Nut M64 50
SA-194-7 or 16 50 746
a3

480
H H
10
F

1780
1800

1780
1800
960

1780
1800
10

960
240
960
240
50
50 746
+ 117,250 m
SECTION C-C

240
10

J
Scale 1 : 5 J

3 x 240 = 720

3 x 240 = 720

240
Rolled Thread M64
D

240
250
K + 110,070 m K
Positioning of roof attachment
sleeve in accordance to Positioning of roof attachment
Position of Support Anchors - sleeve in accordance to
Hanger Tubes 1.48760/00 213-0005 Position of Support Anchors -

6 x 45v
and Roof Basic Drawing 1.48760/00 215-0005. Hanger Tubes 1.48760/00 213-0005
M 64 and Roof Basic Drawing 1.48760/00 215-0005.

L L

SECTION E-E Zugehörige Zeichnungen / Relevant Drawings


Scale 1 : 5 DETAIL F Teil
Part
Zeichnungs-Nummer
Drawing No.
Benennung
Designation
Bemerkung
Remark
240
Plate 25 Thick
Scale 1 : 2 1.48760/00 213-0005
Position of Support Anchors Hanger Tubes
10 75 10
SA-36 Tip Protection
Hanger Tube - Sleave

25

10
M 2 1.48760/00 213-0011 M
50°
Boiler Roof
DETAIL D Plate 25 Thick
SA-36
1.48760/00 215-0005
15
Scale 1 : 1 G

2
280
250
300
a3 02 Relevant drawing added 23.03.2015 Moor 23.03.2015 Kyatam 23.03.2015 Kyatam
SA-182-F22 Cl.3 01 Plate added, Hanger rod length changed 06.11.2014 Frank 06.11.2014 Trumpf 06.11.2014 Kyatam

or SA-355-P22 Plate 25 Thick 00 Erst Erstellung / First Issue 04.06.2014 O. Riehl 04.07.2014 Pelkey 04.07.2014 Bering

N SA-36 Datum bearbeitet Datum geprüft Datum freigegeben


N

10
Index Art der Änderung / Modification
Date drafted by Date checked by Date approved by
70

Freigabe zur Planung zum Detailengineering zur Herstellung


Approval for planning for detail engineering for manufacturing
100

Kennwort zust. Fachbereich


Subject Neyveli 2 x 500 MW Division resp.

6
25

Benennung/Designation

A Hanger System - Heating Surfaces


DETAIL K 50°

Scale 1 : 2

10
Zeichnung Nr. Format
220 ALSTOM Boiler Deutschland GmbH
Drawing No. 1.48760/00 213-0009 A0
Q 10,5 O 49 AP Doc Code NLC/00/B/PF-07-0100/EA/009
Bl.Nr/P.No von/of
Q
1 1
12 50°
O 70 5 10 Ansicht: Stückliste Nr.
---
n 0,1 A View: Parts List No.
Entstanden aus/developed from Ersatz für/substitution for Ersetzt durch/replaced by
--- --- ---
12

Attention Workshop!
DETAIL G
An dieser Zeichnung behalten wir uns die gesetzlichen Urheberschutzrechte vor. Ohne unsere vorherige Zustimmung darf diese Zeichnung weder
Sleeve end to be trimmed vervielfältigt noch Dritten zugänglich gemacht werden. Sie darf auch nicht durch den Empfänger oder Dritte in anderer Weise missbräuchlich
verwertet werden.
to ensure Perpendicularity
25

25

Scale 1 : 2
We reserve the copyright for this drawing. Without previous approval this drawing shall not be copied or made available for
4x

after welding to Hanger tube! third parties. Nor shall it be misused by the recipient or third parties.
90 0°

BHEL CUSTOMER NO.: 0683 & 0684


°(

50°

MUST NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY


=3

CAUTION: THE INFORMATION ON THIS DOCUMENT IS THE


5
9

PROPERTY OF BHARAT HEAVY ELECTRICALS LIMITED. IT


R R
60
v)

CUSTOMER NEYVELI LIGNITE CORPORATION LIMITED

DETRIMENTAL TO THE INTEREST OF THE COMPANY


(NLC LTD)
25

CONSULTANT
15
freigegeben/Released

M/S LAHMEYER INTERNATIONAL (INDIA) PVT. LTD


50°

PACKAGE: STEAM GENERATOR AND AUXILIARIES (NTA1)


NEYVELI NEW THERMAL POWER PROJECT (NNTPP)
2 X 500 MW LIGNITE FIRED UNITS AT NEYVELI
8
S 2 BHARAT HEAVY ELECTRICALS LIMITED S
BOILER PLANT UNIT; TIRUCHIRAPALLI-INDIA-620 014
10 ALL DIMENSIONS IN MILLIMETERS BHEL DRG.NO. REV

PROJECTION: SCALE:
02
1 : 20

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Alstom Power Boiler GmbH; Dateiname: 148760_00213_0009.dft; Vorlage: Normal.dft; Autor: a_amaier; zuletzt bearbeitet von: 247925; Erstelldatum: 21.11.2013; Zugriffsdatum: 23.03.2015; Blatt 1 / 1

Das könnte Ihnen auch gefallen