Beruflich Dokumente
Kultur Dokumente
SHARING :
RESEARCH ON SITUATION
OF A DECEASED
ARCHITECT , HOW
PROJECT IS TAKEN OVER
BY NEW ARCHITECT AND
WHO OWNS THE
COPYRIGHT
Prepared by:
Ar Ridha Razak
The SOP
WHAT IS THE
IMPLICATION TO HIS
ARCHITECTURAL LIFE?
DEATH/INCAPABLE OF AN ARCHITECT
THING TO CONSIDER
Entitle for
fee due
Letter of
Sole Partnership BC/MDP Remaining Fees Due Release
prop scope
Appoint new
Architect
Ar Ridha Razak
Ar Ridha Razak
REGISTERED
ARCHITECT UNDER
TO REGISTER AS
ARCHITECT ACT ENTERPRISE
ACP ANY PERSON
WITH LAM
COMPANY
MULTI
DISCIPLINARY
Note
1. The spouse, heir ,relative , client must submit proof to Lembaga Arkitek Malaysia
to cancel the registration.
2. As long as the proof or death certificate has not been submitted to LAM,
cancelation of registration cannot be confirm. Onus on Family or client.
SSM Process
1. Accordance to new S209 Company Propose by Propose by heir (subject
company to share transfer)
Act 2016, company can have single
director or last remaining director.
2. No requirement to find Elect New Director at
replacement. SSM
Others submit Did not
1. Subject to MOA condition between
partners or directors to be Submit to LAM Fail to submit,
within 30 days Disciplinary may
adhered. take action
Heir
Office
Movable Immovable
Employment Staff maybe The Heir Settle by
maybe retain if the may heir
terminated if heir transfer
value the company qualified staff to
above RM
cease to and takes other ACP
less RM 2 2 million exist. over the
million or with Staff free to company.
Or no will will leave.
Ar Ridha Razak
Asset
• The heir shall list down the asset and monies available.
Ar Ridha Razak
Deceased Executor :
Trustee, Heir must pay on behalf
of the deceased
Ar Ridha Razak
Code of engagement
Circular 2/2007
He should be remunerated
accordingly if taking the works at Final
Completion stage
Copy right He or his inheritor or his previous The rights to use the drawings to
ACP retains the copyright unless complete the project.
transferred to client
1. Land Title 1.BP Drawings 1.BP approval Drawings 1.BP approval Drawings
2. Initial Sketch 2.Fire Drawings 2.Bomba Drawings 2.Bomba Drawings
3. Design report 3.Structure Drawings 3.Structure Drawings 3.Structure Drawings
4. Perspective 4.SPA & SPA drawings 4.SPA drawings 4.SPA drawings
5. Softcopy design 5. Strata SOP Drawings 5.Strata SOP Drawings 5.Copy of Borang F and G forms
drawings 6.Current signed G Forms
6. Estimates Tender or Contract 7.Current Stage of Infrastructure Construction Documents
7. KM approval if any Drawings works – water, sewage, TNB 1.Contract documents
8. Laporan Cadangan 1. Approve design by 8.All Progress billing Certificate 2.Construction drawings and soft
pemajuan if any client. copy.
2. Hard copy current Construction Documents 3.All instructions
drawings 1.Contract documents 4.All progress reports
Design Development 3. Material lists 2.Construction drawings and soft 5.All minutes of site meeting and
1. Design report 4. Softcopy current copy. technical meeting
2. Perspective drawings 3.Site Diary 6.All evidence of approve shop
3. Softcopy Drawing to 4.All instructions drawings & material
the current stage 5.All progress reports 7.Tests reports
4. Estimates 6.All minutes of site meeting and
technical meeting
7.All unattended Request for
information
8.Non Compliance report.
9.All evidence of approve shop
drawings & material
10.Tests
COMMON ISSUES
COMMON ISSUES
CONCLUSION
CONCLUSION
THE END