Sie sind auf Seite 1von 25

PUR – F – 023 W – 1721

TENDER Work of Thermal Insulation for Turbines &


FOR THE Various Auxiliaries of 210 MW Units 3, 4 & 5 of
GTPS on As & When Required Basis.

SR. INDEX PAGE NO


NO

1 TENDER NOTICE

2 UNDER TAKING ( TO BE SIGNED BY THE TENDERER)

3 DETAILED SPECIFICATON (TECHNICAL BID)

4 SCHEDULE “B”

CHIEF ENGINEER (GEN),


GSECL: TPS: GANDHINAGAR

1
PUR – F – 023 W – 1721

GUJARAT STATE ELECTRICITY CORPORATION LTD


THERMAL POWER STATION, GANDHINAGAR-382 041.
(PART – I)

TECHNICAL BID

Work of Thermal Insulation for Turbines &


W – 1721 Various Auxiliaries of 210 MW Units 3, 4 & 5 of
GTPS on As & When Required Basis.

08 09 2010 AT 3.30 P.M ( IF POSSIBLE)


DUE ON

TENDER FEE PAID-------- YES / NO

• TENDER FEE PAID VIDE D.D.NO._________DTD._________RS.________


• IF TENDER FEE PAID IN CASH
MONEY RECEIPT NO._________ DTD.___________ RS.___________.

Tender fee will be accepted by CASH (at G.S.E.C.L, TPS, CASH Counter) or by Demand
draft drawn in favour of Gujarat State Electricity Corporation Limited payable at
Gandhinagar on any Schedule / Nationalized Bank or any of the all Public Sector Banks,
IDBI, AXIS, HDFC, ICICI & the Kalupur Commercial Cooperative Bank Ltd. will be
acceptable. The Tender Fee & EMD in any other form and favor shall not be accepted.
(Cheque is not accepted).

EMD PAID ------------- YES / NO

• EARNEST MONEY PAID VIDE D.D.NO.____ DTD.________ RS._________


The E.M.D. will be accepted by D.D. only. in favour of Gujarat State Electricity
Corporation Limited payable at Gandhinagar on Any Schedule / Nationalized Bank or
Bank Guarantee issued by any of the all Public Sector Banks, IDBI, AXIS, HDFC, ICICI &
the Kalupur Commercial Cooperative Bank Ltd. will be acceptable. The Tender Fee & EMD
in any other form and favor shall not be accepted. (Cheque is not accepted).

Payment of Tender Fee and EMD is compulsory for work tender. Otherwise Tender /
offer shall be ignored/ rejected. Tenders submitted without tender fee and EMD will
not be accepted. Tender fee & E.M.D. both should be paid by separate D.D. in case of
payment of the same by D.D. Interest is not payable on the EMD.

2
PUR – F – 023 W – 1721

Tenderer should quote the reference of payment of EMD & Tender Fee i.e. DD No. &
Date for EMD PAID &.Money receipt no. / DD No. & Date FOR Tender Fee on cover
page of technical Bid otherwise Bid will not be considered for opening. Tenderer
should also certify as "unconditional tender" on tender cover itself.

PLEASE MENTION:

• Registration No. : ____________________________________________

• EPF Code No. : _____________ (The contractor shall have to submit the attested
copy of EPF code No. certificate received from RPFC without fail otherwise tender will
not be considered )

• INCOME TAX PAN NUMBER :- _____________________________________:

• Service Tax No. : _________________________________________

THIS TENDER SHOULD BE SUBMITTED DULY SIGNED WITHOUT REMOVING


A SINGLE PAGE, OTHERWISE THE TENDER IS LIABLE TO BE REJECTED FOR
WORKS TENDER.

The tender received after time and date specified in the tender notice will not
be accepted. Once the offer Submitted by the Contractor before due date of
submission, the Contractor will not be allowed to submit revised/
additional/Modified/other after opening of bid. Any alterations/ modification to the
bids received after submission of offer shall not be considered unless carried for by
the Corporation in negotiation.

• The undersigned reserves the right to reject any or all tenders without assigning
any reasons thereof.

CHIEF ENGINEER (GEN),


GSECL: TPS: GANDHINAGAR

TENDERER NAME:

NAME OF COMPANY:

ADDRESS:-

3
PUR – F – 023 W – 1721

GUJARAT STATE ELECTRICITY CORPORATION LTD


THERMAL POWER STATION, GANDHINAGAR-382 041.
Interested bidders are requested to download tender documents from our
Website (www.gseb.com & www.gsecl.in). After filling the required details, same
should be submitted by Registered A.D. or by Speed Post ONLY
Offers submitted by Courier or Hand Delivery will be NOT allowed.
No tender shall be accepted/ opened in any case after due date and time(15:00
hour) of receipt of tender irrespective of delay due to postal services or any other
reasons and that the GSECL shall not assume any responsibility for late receipt of
the tender. Tender received late will not be accepted. Any postal delay in submission
/ delivery of the tender shall be to the party’s account.
Vendor registration with GSECL is not compulsory required for submitting the
Tender. BIDDERS ARE ADVISED TO VISIT OUR ABOVE WEBSITES
REGULARLY UP TO OPENING OF BID FOR ANY CORRIGENDUM MAY BE &
SUIBMIT CORRECTED COPY OF TENDER (OTHERWISE YOUR OFFER WILL
NOT BE CONSIDER FOR OPENING) & EXTENSION OF DUE DATE.

The brief details regarding tender are as under:-

TENDER
NO.
W – 1721

NAME OF Work of Thermal Insulation for Turbines & Various


TENDER / Auxiliaries of 210 MW Units 3, 4 & 5 of GTPS on As &
WORK When Required Basis.
ESTIMATED COST (IN Rs.) 9,37,530/-
LAST DATE OF SUBMISSION OF
TENDER UP TO 3.00 P.M (BY RPAD /
SPEED POST & DATE OF 08/09/2010
TECHNICAL BID OPENING. AT
3.30P.M( If POSSIBLE )

TENDER FEE BY CASH/ DD (IN Rs.) 750/- (NON REFUNDABLE)


EARNEST MONEY (IN Rs.) 9,375/-

SECURITY DEPOSIT 5% of contract value.

VALIDITY OF RATES:- 120 DAYS FROM THE DATE OF


OPENING OF THE TENDER

TIME LIMIT FOR COMPLETION As per clause no (17) of Terms &


Conditions of Works in Schedule-A

4
PUR – F – 023 W – 1721

GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR

BIDS FOR WORKS

GENERAL CONDITONS

The tender must be submitted in THREE sealed envelope system.

Subject and Tender No. Clearly written on covers.


1) E.M.D. +Tender Fee cover (2) Technical Bid cover (3) Price Bid cover
EMD +Tender FEE both should be kept in one separate cover & should be
submitted with Technical Bid & Price Bid Covers.
The tenders duly filled in sealed covers will be received by RPAD/Speed Post super
scribing Tender No. & Subject at the office of The Chief Engineer (Gen), GSECL,
TPS, Gandhinagar Up to 15.00 hrs ON Due date and will be opened at 15.30 hrs on
the same day (if possible) in the presence of bidders who wish to remain present.
The tender is non-transferable document to be submitted in two parts namely
Technical bid (Part-I) with all enclosures of the tender documents and Price Bid
(Part-II) simultaneously in separate sealed covers dully super scribed the respective
covers as “Technical-Bid” and “Price Bid”, Tender No, Due date of opening etc. The
Tenders shall be accepted by R.P.A.D./speed post only up to 15:00 hrs. on the date
of opening of tender.
1. TECHNICAL BID:
1.1) The technical bid comprises scope and nature of works and quantity of
works/jobs, drawings (Refer Schedule-B), required technical qualification for
execution of the works/job etc. for which price are to be quoted. Also, all the
technical details of the stores/materials offered in accordance with the
Corporation speciation guaranteed technical particulars and conditions, etc;
except THE PRICE BID which should be quoted separately and should be
submitted separately in the PRICE BID COVER.

1.2) The Technical Bid shall be opened at 3=30 PM (15.30 Hrs) on Due date (If
possible), in the presence of those tenderers who wish to be present. If the
Authorized Representative is likely to be present then he must submit the
authorization letter of the representing company at the time of opening of
Bids and this is compulsory. Only One Authorized Representative shall
be allowed. Please note that the required documents should be invariably
submitted with tender copy. And tender without documents is liable to be
ignored.

1.3) Contractor has to submit all required documentary evidences there of to qualify
for acceptance of their technical bid. The acquisition of the tender documents
by any party will not automatically qualify the party as to its capability to
execute such or similar orders. The Corporation shall assess the capability of
the party at the time of evaluation of the technical bids.

5
PUR – F – 023 W – 1721

1.4) The submission of the offer by any contractor does not mean that the bidder is
qualified for execution of the works. After opening of the technical bids, the
competent authority will evaluate on the basis of technical qualification criteria.
If contractor’s bid does not meet the technical qualification criteria, then his
technical bid will be ignored. Decision taken by the CE(G),GTPS will be
binding to all in this regard.

2. PRICE BID:
2.1) The price bid comprises Schedule-B, in which the tenderer has to offer their
rates in accordance with the technical specification specified in technical bid with
all commercial terms and condition. The Price Bid must be submitted strictly as
per Schedule-B and shall be submitted in the separate envelope (dully sealed)
super scribed ‘PRICE BID’ with subject and shall be submitted simultaneously
with the Technical Bid.

2.2) Price bids of technically acceptable tenders shall open in the presence of
technically qualified parties only. The time and date of opening of the price bids
shall be decided by the Corporation after analyzed & scrutiny of the technical
bids and the intimation will be given only to the technically accepted/qualified
tenderers / parties.

2.3) The ‘TECHNICAL” and ‘PRICE” Bids shall contain adequate cross-reference
wherever necessary to ensure clear and proper co-relation of the two bids
without ambiguities whatsoever. Any technical questions information and
clarifications that may be required pertaining to this Tender should be referred
to the Chief Engineer (Gen), Gandhinagar, TPS-382041 reserves the right to
reject any OR all tenders without assigning any reasons thereof.

2.4) Bidders have to quote their rates GSECL’s given format of price bid.

CONDITIONS FOR PRICE BID

a.) For Works Portion Only: As per Schedule B, for service tax etc.
b.) For Supply Portion Only:- Party shall have to quote their rates in Schedule “B”
of price bid only along with commercial terms and conditions. The details of
applicable taxes/duties, service charges, packing & forwarding charges, freight,
insurance, F.O.R. etc. with or without taxes or duties shall be indicated clearly if
applicable otherwise it will be considered as “inclusive all taxes / duties and
service charges on FOR GTPS basis”.

3. Tenders duly filled must be accompanied by the following documents.


Sealed percentage rate tenders are invited from the reputed contractors with sound
engineering back ground, experience and financial capability, fulfilling qualifying
requirement stated hereunder at GANDHINAGAR TPS, Gujarat.

6
PUR – F – 023 W – 1721

(A). Prequalification Criteria:-


3.1) Experience certificate for execution of similar works (as mentioned in below)
successfully completed by the contractor as under.

(a) Tender Documents will be considered for only to those Contractors


who have executed same Works during Last Three Years
satisfactorily having Single Order of Ten Lakhs. Contractor has to
submit Documentary Proof with Tender Documents. However, Issue
of the Tenderer Documents to any Party will not be automatically
qualifying the Party as to its Capability to execute Same Orders and
GSECL shall assess the Capability of the Party at the Time of
Evaluation of the Bids.
(b) Contractor is preferred with Experience Certificate having
completed Similar Work of minimum 210 / 110 MW units of Turbine
or above Capacity. Offer without the Experience Certificate or Order
is ignored.
(c) Updated Workmen Group Insurance Policy Covering All the
Labours, Updated Valid Labour License, Documentary Evidence of
PF Paid of Employees / Labours for Last Six Months, Details of
Skilled / Semi-Skilled Persons Presently Employed by The
Contractor having Sufficient Knowledge of Similar Jobs, PAN No.,
Details of Tools Tackles and Equipment possessed Relevant to the
Job and Details of Job / Jobs executed for the Value of Minimum
Twenty Lakhs during Last Three Years along with Documentary
Evidence are required to be submitted along with the Offer,
Otherwise the Offer will be liable to be ignored without any
reference.
3.2) Details of orders for similar nature/jobs carried out along with documentary
evidence, performance certificate and their organization set up for such work
executed in past there of indicating the names of the organizations, order no
and date.
3.3) Solvency Certificate for 20% value, of the estimated cost of any Nationalized
Bank.
3.4) Details of P.F. code No. from the appropriate provident fund authorities and
details of P.F. paid to the employees for last six months. Certificate of separate
provident fund account number.
3.5) Bidder shall have to submit the PAN card No for Income Tax with documentary
proof.
3.6) Details of the partnership deed.
3.7) Details of Tools, tackles, equipments and personals available with firm relevant
to the job/subject tender.
3.8) Copy of the updated valid labour contract license from the appropriate
authorities and updated workman group insurance policy covering labour
engaged.
3.9) The tenderer shall have to produce the document of last three years annual
account, i.e. profit & loss account and balance sheet, if the estimated cost of
tender is more than 50 lakhs along with technical bid.

7
PUR – F – 023 W – 1721

3.10) Details of skilled/semi-skilled persons presently employed by the contractor


having sufficient knowledge of similar jobs.

Other Terms & Conditions

1. Contractor shall indemnify GSECL against for any injury and/or damage that may
be caused in his man or material. Moreover, the contractor shall be fully
responsible for any damage caused to the Corporation’s properties done by his
man/materials while executing the work. The Corporation will be entitled to
recover the damage from the party’s bill.
2. At any time if GSECL feels that progress of work is unsatisfactory and work force
of contractor is inadequate, other agencies/ departmental personnel will be put in
parallel for expediting the work. Amount so incurred will be recovered from the
contractor’s bill. In this case decision of the Engineer-in-charge shall be final and
binding to the contractor.
3. At any stage of the contract period, if the contractor fails to complete the job or
his work is not found satisfactory the same will be got done at his cost and risk
and additional expenditure incurred by the Corporation will be recovered from
him by giving one week's notice.
4. Subletting the contract to other agency is not permitted unless and otherwise
approved by the competent authority.
5. Conditional tender will not be accepted. Withdrawal of condition
unilaterally before or after opening of tender will not be permitted.
6. The contractor has to carry out the required work strictly according to guidance
given by the Corporation's responsible officer.
7. The Corporation reserves the right whether the materials to be accepted, or not.
Only specified and scheduled materials are to be examined by Corporation's
officer and then if suitable will be accepted by the Corporation.
8. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS,
Gandhinagar which will be paid after the certificate regarding correct receipt of the
materials in good condition.
9. The rates should be quoted without any condition. The rates be written in words
and figures legibly.
10. The contractor shall have to execute an agreement with the Corporation on a non
judicial stamp paper, the cost of which will have to be borne by the contractor and
will have to sign the contract and tender booklet of the Corporation.
11. The contractor has to pay security deposit of 5 % of the contract value, before
commencing the actual work.
12. If successful contractor fails to pay the required security deposit and does not
come forward to execute the work, the full value of EMD will be forfeited by the
Corporation.
13. Any terms and conditions mutually agreed to writing shall be for a part of the
contract.
14. The authorized officer/person of the Corporation will have the liberty to check the
material and work etc.
15. Regarding the quality and acceptance of the jobs the authorized officer's decision
will be binding and final and no dispute on this account will be entertained.
16. General terms and conditions of the Corporation for works contract will be made
applicable for this work also. The booklet is attached herewith.

8
PUR – F – 023 W – 1721

17. No material for the said work will be supplied by the Corpn. except specified in
schedule thereof.
18. If the work is not done as per specification given by the Corporation in stipulated
time in all respects, the penalty will be levied as per Corporation's rules.
Any delay that may take place in supply and / or erection, testing and
commissioning activities beyond contractual cut off date / stipulated period in the
order shall be subjected to penalty (not liquidated damages) at the rate ½ % of the
contract price / order price per week or part thereof subjected to a maximum of
10% of the total contract value/ order value (i.e. End cost including taxes & duties)
19. Tenders will be accepted only on or before due date and time of opening.
20. The contractor will be responsible and liable for any damage to man and materials
during his work.
21. While execution of this job our plant and auxiliaries will be in running conditions.
Hence contractor has to take all precautions for safety etc. Safety belts etc. also
to be used wherever necessary while working.
22. Corporation reserve the right to terminate the contract if quantity shown in
Schedule-B is executed earlier.
23. All the terms and conditions specified in Industrial & safety laws are binding on
the contract.
24. Registration certificate under labor contract act will have to be obtained before
execution of contract.
25. The laborers shall be supplied for 8 hours a day, so contractors shall arrange
accordingly.

The CE(G),GSECL, Gandhinagar, reserves right to reject/accept any or all


tenders without assigning any reasons thereof and to split up the work
between the parties as the case may be.

Chief Engineer (Gen),


GSECL: TPS: Gandhinagar.

We hereby agree for the terms & conditions laid down in Tender.
All the bidders are requested to see and verify the documents of
a) General safety rules / norms” to be observed by the contractors
b) Additional terms and conditions regarding industrial law and other related
matters for the tender documents.
c) General rules and directions for the guidance of contractor booklet of
GSECL, GTPS on our website under heading of “Rules for Works”
And confirm that all the above documents you have verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules,
Industrial Laws and Contract Booklet (a, b & c as above) and accordingly
submitted my/our offer.”

Contractor's Signature
With Seal & Date

9
PUR – F – 023 W – 1721

GUJARAT STATE ELECTRICITY CORPORATION LTD


THERMAL POWER STATION, GANDHINAGAR-382 041
1. (a) Full Name and Address :

(b) Telephone No & Telegraphic Address :

2. Particulars of Registration as a
Contractor and class in which
Registered.
In the Gujarat Elect. Corp. Ltd.
In other Govt. Dept.
3. Reference to be made to (Name & Address)
1.
2.
3.
4. Previous experience in Railway, PWD and other works.

5. Any other information the contractor may desire to give.


Note:
(1) True copies of testimonials may be attached but they will not be returned.
(2) The SSI/NSIC will not be accepted for exemption of Tender Fee and EMD for
Works Tender. Payment of Tender Fee and EMD is compulsory for work tender.
Otherwise Tender / offer shall be ignored.
(3) All the bidders are requested to see and verify the documents of
a) General safety rules / norms” to be observed by the contractors
b) Additional terms and conditions regarding industrial law and other related
matters for the tender documents.
c) General rules and directions for the guidance of contractor booklet of
GSECL, GTPS on our website under heading of “Rules for Works”
And confirm that all the above documents you have verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules,
Industrial Laws and Contract Booklet (a, b & c as above) and accordingly
submitted my/our offer.”

Signature of Tenderer with Seal & Date


Place : Contact Person :
Address:
Date :

Telephone No. :
Mobile No. :
Fax No. :
E-Mail :
Website :

10
PUR – F – 023 W – 1721

Gujarat State Electricity Corporation Ltd.


Thermal Power Station, GANDHINAGAR
Annexure
Sub: - Tender for the Work of Thermal Insulation for Turbines & Various
Auxiliaries of 210 MW Units 3, 4 & 5 of GTPS on As & When Required
Basis.

ON FIRM’S LETTER HEAD:-

I/WE __________________________________________________________THE

AUTHORISED SIGNATORY OF M/ S __________________________________

HEREBY CETRTIFIED THAT M/S ______________________________________

IS NOT RELATED WITH OTHER FIRMS WHO HAVE SUBMITTED TENDERS

FOR THE SAME ITEMS UNDER THIS INQUIRY / TENDER.

SIGNATURE OF THE TENDERER

WITH DESIGNATION.

SEAL OF THE FIRM:

PLACE:

DATE:

11
PUR – F – 023 W – 1721

GUJARAT STATE ELECTRICITY CORPORATION LIMITED, BARODA


Date:
INTEGRITY PACT
OUR ENDEAVOUR

To, create an environment where Business Confidence is built through Best


Business Practices and in fostered in an atmosphere of trust and respect between
providers of goods and services and their users for the ultimate benefit of society
and the nation.

GSECL’S COMMITMENT PARTY’S COMMITMENT


■ To maintain the highest ethical standards ■ Not to bring pressure recommendations
in business and professions. from outside GSECL to influence its
decision.
■ Ensure maximum transparency to the ■ Not to use intimidation, threat inducement
satisfaction of stakeholders. or pressure of any kind on GSECL or any
of it’s employees under any circumstances.
■ To ensure to fulfill the terms of agreement ■ To be prompt and reasonable in fulfilling
/ contract and to consider objectively the the contract, agreement, legal obligations.
viewpoint of parties.
■ To ensure regular and timely release of ■ To provide goods and/or services timely as
payments on due dates for work done. per agreed quality and specifications at
minimum cost to GSECL.
■ To ensure that no improper demand is ■ To abide by the general discipline to be
made by employees or by anyone on our maintained in our dealings.
behalf.
■ To give maximum possible assistance to ■ To be true and honest in furnishing
all the Vendors / Suppliers/ Service information.
Provider and other to enable them to
complete the contract in time.
■ To provide all information to ■ Not to divulge any information, business
suppliers/contractors relating to details available during the course of
contract/job which facilitate him to business relationship to others without the
complete the contract/job successfully in written consent of GSECL.
time.
■ To ensure minimum hurdles to ■ Not to enter into carter/syndicate/
vendors/suppliers/contractors in understanding whether formal/non-formal
completion of agreement/ contract/ work so as to influence the price.
order.

--------------------------------- ---------------------------------

Seal & Signature Seal & Signature


(GSECL’s Authorized Signatory) (Party’s Authorized Person)
Name : Name :-
Designation :

12
PUR – F – 023 W – 1721

GUJARAT STATE ELECTRICITY CORPORATION LIMITED.


TPS: GANDHINAGAR.
SCHEDULE - A.

Name of Work: Work of Thermal Insulation for Turbines & Various Auxiliaries
of 210 MW Units 3, 4 & 5 of GTPS on As & When Required
Basis.

SCOPE OF WORK:-

(1) REMOVAL AND DISPOSAL OF OLD INSULATION, SHEETING MATERIALS,


HOOKS, INSULATION RETAINERS, LACING WIRE, MATTRESSES FIXING
PLATES, SELF TAPPING SHEET METAL SCREWS ETC. FROM VARIOUS
PIPES, VALVES, FITTINGS, DUCTS, FURNACE EXPANSION BELLOW
ETC.

The Party has to remove the Old Insulation, sprayed Insulation, Sheeting
Materials, hard setting cement, Hooks, Insulation Retainers, Lacing Wire,
Mattresses Fixing Plates, Self Tapping Sheet Metal Screws etc. from HPT-IPT
Casings, Various Pipes, Valves, Fittings, etc. of any Locations and of any
Thickness of Turbine & their Various Auxiliaries; Stacking of Removed Old
Insulation Materials from the Work Area; Cleaning of Surrounding Working Area
during Execution of Works and to be disposed at the shown Location as per
instructions of Engineer in Charge.

(2) SUPPLY AND APPLICATION OF 50 / 100 / 150 / 200 MM THICK FRESH LRB
MINERAL/ROCK WOOL MATTRESSES OF DENSITY 150 KG/M3 WITH
HOOKS, INSULATION RETAINERS, LACING WIRE ETC.

The Scope of Works includes the Supply of Required Insulation Materials at


Site such as 50 mm Thick Fresh LRB Mineral / Rock Wool Mattresses with
Stitched G.I. Wire Netting on One Side of Density 150 Kg/M3, Hooks, Insulation
Retainers, Lacing Wire, Any Other Materials required to complete the Works
etc. as per IS 81831: LRB Mineral / Rock Wool Mattresses at their Cost for the
Works of Thermal Insulation for Turbines & their Various Auxiliaries like Various
Pipes, Valves, Fittings, etc. as per instruction of Engineer in Charge and to be
got checked / approved from Engineer in Charge. The Supplied Insulating
Materials shall be New, Fresh, Non Hygroscopic, Guaranteed to withstand the
Continuous Maximum Temperature without Deterioration to which it will be
subjected in Specified Applications. The Supplied Insulating Materials shall not
react chemically with Water or Moisture to form more Actively Corrosive
Substances to the Applied Surface than Water or Moisture. The Supplied
Materials shall not offer Substance to Fungus or Vermin and must not pose a
Health Hazard. The Scope of Works also includes Unloading from Carriers,
Handling, Checking, Receiving, Transportation, Storage, Supply & Erection of
Scaffolding Materials wherever required and Application of Supplied Materials
at Site as per instruction of Engineer in Charge.

13
PUR – F – 023 W – 1721

All Surfaces are to be cleaned and dried for All Foreign Materials such as
Scales, Dirt, Rusts and Paints etc. by using Steel Wire Brushes and Steel
Scrappers before the Application of Insulations. The Applications of the various
Supplied Required Insulation Materials for the Work of Thermal Insulation for
Turbines & their Various Auxiliaries like Various Pipes, Valves, Fittings, etc. as
per instruction of Engineer in Charge shall be carried out as per IS 14164 /
1994: Code of Practice for Application and the Finishing of Thermal Insulating
Material at Temperature 40°C to 700°C. The Insulations are to be applied
starting from Bottom to Top with Edges pulled together tightly at the
Longitudinal Joints and secured by Lacing Wire. The Insulations are to be
turned to bring the Joints to the Lower Side Adjacent Length shall be butted
closely and laced together with Lacing Wire. The Single Layer of Insulation shall
not be more than 50 mm Thick. For Insulation Thickness more than 50 mm, the
Application will be in two or more Layers and Each Layer of Mattresses shall be
backed up with 20 SWG Galvanized Steel Wire and having 25 mm Size
Hexagonal Opening. The Ends of all Wire Loops shall be firmly twisted together
with Pliers, bent over and carefully pressed into the Surface of the Insulation.
Required Suitable Clamped Supports are to be provided to prevent the
collapsing of Insulations due to its Own Weight. Any Welding required are to be
done by the Contractor with the Prior Permission of the Engineer in Charge and
only under their Direct Supervision where Welding is not permitted. The Scraps
of Insulation Materials are to be stacked separately and to be disposed at the
shown Locations as per instructions of Engineer in Charge. The Measurements
and Conversion Factors for Bends, Fittings, and Valves etc. for Measurements
are to be considered & taken as per IS 14164 / 1994: Measurements and
Conversion Factors for Bends, Fittings, and Valves etc. for Measurements.

(3) SUPPLY AND APPLICATION OF 0.71 MM THICK NEW ALUMINIUM SHEET


WITH MATTRESSES FIXING PLATES, SEALANT, INSULATING CEMENT,
BITUNINOUS PAINT, SELF TAPPING SHEET METAL SCREWS ETC.

The Scope of Works includes the Supply of Required Sheathing / Cladding


Materials for Insulation at Site such as 0.71 mm Thick New Aluminium Sheet,
Mattresses Fixing Plates, Sealant, Insulating Cement, Bituminous Paints, Self
Tapping Sheet Metal Screws, Any Other Materials required to complete the
Works etc. at their Cost for the Works of Thermal Insulation for Turbines & their
Various Auxiliaries like Various Pipes, Valves, Fittings, etc. as per instruction of
Engineer in Charge and to be got checked / approved from Engineer in Charge.
The Scope of Works also includes Unloading from Carriers, Handling,
Checking, Receiving, Transportation, Storage, Supply & Erection of Scaffolding
Materials wherever required and Application of Supplied Sheathing / Cladding
Materials at Site as per instruction of Engineer in Charge.

The Applications of the various Supplied Required 0.71 mm Thick New


Aluminium Sheet, Mattresses Fixing Plates, Sealant, Insulating Cement,
Bituminous Paints, Self Tapping Sheet Metal Screws, Any Other Materials
required to complete the Works etc. for the Work of Thermal Insulation for
Turbines & their Various Auxiliaries like Various Pipes, Valves, Fittings, etc. as
per instruction of Engineer in Charge shall be carried out as per IS 14164 /

14
PUR – F – 023 W – 1721

1994: Code of Practice for Application and the Finishing of Thermal Insulating
Material at Temperature 40°C to 700°C. The Lugs are to be spaced at
approximately 300 mm Centres with Zigzag Arrangement Spacer right at 1000
mm for fixing the Sheets. All Vertical and Horizontal Sheets are to be overlayed
a minimum of 75 mm. All Insulations are to be protected by an Outer covering
of Aluminium Sheet. The Sheathing Joints are to be sealed and made
effectively Weather and Water Proof. All Flat Surfaces shall be adequately
slopped to Prevent Pools of Water Collection. The Sheathings are to be
protected internally with 2 Coats of Bituminous Paint. All Insulation Joints and
Any Cavities between Joints are to be fully staggered and to be filled with
Sealant. The Longitudinal Lapped Joints of adjoining Sections of Sheets are to
be secured with Zinc-Plated Screws. The Scraps of 0.71 mm Thick New
Aluminium Sheet, Mattresses Fixing Plates, Sealant, Insulating Cement,
Bituminous Paints, Self Tapping Sheet Metal Screws, Any Other Materials
required to complete the Works etc. are to be stacked separately and to be
disposed at the shown Locations as per instructions of Engineer in Charge. The
Measurements and Conversion Factors for Bends, Fittings, and Valves etc. for
Measurements are to be considered & taken as per IS 14164 / 1994:
Measurements and Conversion Factors for Bends, Fittings, and Valves etc. for
Measurements.

(4) APPLICATION OF OLD REUSEABLE PLAIN / TRAPEZOIDAL ALUMINIUM /


GI SHEET WITH MATTRESSES FIXING PLATES, SEALANT, INSULATING
CEMENT, BITUMINOUS PAINTS, SELF TAPPING SHEET METAL SCREWS
ETC.
The Scope of Works includes the Supply of Required Sheathing /
Cladding Materials for Insulation at Site such as Mattresses Fixing Plates,
Sealant, Insulating Cement, Bituminous Paints, Self Tapping Sheet Metal
Screws, Any Other Materials required to complete the Works etc. at their Cost
for the Works of Thermal Insulation for Turbines & their Various Auxiliaries like
Various Pipes, Valves, Fittings, etc. as per instruction of Engineer in Charge
and to be got checked / approved from Engineer in Charge. The Old Reusable
Removed Plain / Trapezoidal Aluminium / GI Sheets will only be given by
GSECL Free of Cost. The Scope of Works also includes Unloading from
Carriers, Handling, Checking, Receiving, Transportation, Storage, Supply &
Erection of Scaffolding Materials wherever required and Application of Supplied
Sheathing / Cladding Materials at Site as per instruction of Engineer in Charge.

The Applications of the Old Reusable Removed Plain / Trapezoidal


Aluminium / GI Sheets will be given by GSECL and the various Supplied
Required Mattresses Fixing Plates, Sealant, Insulating Cement, Bituminous
Paints, Self Tapping Sheet Metal Screws, Any Other Materials required to
complete the Works etc. for the Work of Thermal Insulation for Turbines & their
Various Auxiliaries like Various Pipes, Valves, Fittings, etc. as per instruction of
Engineer in Charge shall be carried out as per IS 14164 / 1994: Code of
Practice for Application and the Finishing of Thermal Insulating Material at
Temperature 40?C to 700?C. The Lugs are to be spaced at approximately 300
mm Centres with Zigzag Arrangement Spacer right at 1000 mm for fixing the
Sheets. All Vertical and Horizontal Sheets are to be overlayed a minimum of 75
mm. All Insulations are to be protected by an Outer covering of Aluminium

15
PUR – F – 023 W – 1721

Sheet. The Sheathing Joints are to be sealed and made effectively Weather
and Water Proof. All Flat Surfaces shall be adequately slopped to Prevent
Pools of Water Collection. The Sheathings are to be protected internally with 2
Coats of Bituminous Paint. All Insulation Joints and Any Cavities between Joints
are to be fully staggered and to be filled with Sealant. The Longitudinal Lapped
Joints of adjoining Sections of Sheets are to be secured with Zinc-Plated
Screws. The Scraps of Old Plain / Trapezoidal Aluminium Sheet, Mattresses
Fixing Plates, Sealant, Insulating Cement, Bituminous Paints, Self Tapping
Sheet Metal Screws, Any Other Materials required to complete the Works etc.
are to be stacked separately and to be disposed at the shown Locations as per
instructions of Engineer in Charge. The Measurements and Conversion Factors
for Bends, Fittings, and Valves etc. for Measurements are to be considered &
taken as per IS 14164 / 1994: Measurements and Conversion Factors for
Bends, Fittings, and Valves etc. for Measurements.

TERMS & CONDITIONS OF WORKS:

(1) This is a Rate Contract for O/H Works and / or on as and when required Basis.
The GSECL reserves Right to extend This Contract for Further Period as
deemed Suitable with the Same Rates, Terms And Conditions.
(2) The Scope of Works with Each Major Jobs to be carried out are given with
Special Conditions of Contract shall be read in Conjunction with the General
Conditions of Contract, Specifications of Works, Drawings and any Other
Documents forming Part of this Contract wherever the Contract so requires,
Separate Section or Part of Each Works shall be deemed to be Supplementary
to Complementary to every Other Part and shall be read with and in to the
Contract so far as it may be Practicable to do so.
(3) All the Works / Jobs should be carried out as per the Instructions and Specified
Scopes under Direct Supervision and Entire Satisfaction to Engineer in Charge.
All the Materials Account should be maintained Works wise so that Payment
can be made accordingly and strictly as per Actual Work done.
(4) Electrical Connection and Energy Consumption will be given Free of Charges.
The lighting is to be arranged by the Party. The GSECL shall make
Arrangement for providing Power Supply to the Contractor for working their
Equipments, Tools etc. as and when required as decided Locations / Points by
Engineer in Charge. ICTP Switches and ELCBs may be arranged by the
Contractor. Further Distributions shall be at the Cost of Contractor. Floods for
Lighting will be arranged by GSECL as and where required. However
Contractor shall arrange 100 Watts / 24 Watts Bulbs at their Cost.
(5) The Scope of Works includes Carting of Materials form the GSECL Main Store /
Sub Store as the case may be if applicable and as directed by GSECL Engineer
for which no Extra Payment shall be made for Transportation.
(6) The Contractor shall have to arrange to remove the Day-to-Day Scrap Materials
from Site and credit to GSECL Main Store / Site Store as per instruction of
Engineer in Charge. The Site must have to be cleared before Starting /
Commissioning of Equipments / Unit; otherwise the Amount of Expenditures
actually incurred will be recovered from Contractor’s Bill without assigning any
Reason in the event of Non-Removal of Scraps.

16
PUR – F – 023 W – 1721

(7) The Contractor shall maintain the Tools / Tackles such as Chain Pulley Blocks,
Welding Generator Sets, Hook-Chooks, Wire Slings, Spanners, Gas Cutting
Sets, Welding Accessories, Grinding Machines etc., Equipments and Machines
required for handling this Contract in working Conditions at their Cost in such a
way that All Works should be completed within Stipulated Period only.
Overhead Cranes provided in plant for lifting purpose can be utilized Free of
Charge if available otherwise Contractor has to arrange Alternative
Arrangement at their cost. Delay in Working for Want of Above will be viewed
seriously.
(8) The Contractor shall adhere to Safety Practices against Hazardous and Unsafe
Working Conditions and shall comply with the Safety Rules in force from Time
to Time of GSECL, Gandhinagar TPS. The Contractor has to arrange for 24 V
Transformers / Battery to men to be utilized as Safety Equipment while carrying
out the work inside of Equipment / at Higher Elevation.
(9) 50 mm Thick Fresh LRB Mineral / Rock Wool Mattresses with Stitched G.I. Wire
Netting on One Side of Density 150 Kg/M3, Hooks, Insulation Retainers, Lacing
Wire, 0.71 mm Thick New Aluminum Sheet, Mattresses Fixing Plates, Sealant,
Insulating Cement, Bituminous Paints, Self Tapping Sheet Metal Screws, All
Types of Consumable Cutting Gas, Welding Rods, Any Other Materials
required to complete the Works etc. are to be arranged by Party at their Cost.
(10) The Scaffolding with Materials required to carry out the Works shall be arranged
by the Contractor at their Own Cost.
(11) After Synchronization of Unit / Recommissioning of Equipment / System, if any
Problems arise for the Works carried out, it shall have to be set right by the
Contractor without any Extra Charges to the GSECL. Contractor should attend
Any Defect Contributory to their Faulty Workmanship during the Trial Run and
Recommissioning of Equipment / System / Unit, and set Right without any Extra
Charges to the GSECL. If Rectifications is not carried out in Time as instructed
by Engineer in Charge, the same shall be carried out by GSECL by engaging
GSECL Staff or Any Other Agency and Cost of which will be recovered
including Supervision Charges from the Contractor’s Bill as per Company’s
Rules.
(12) The Time is the essence of the Contract and Party have to ensure that the
Work has to be completed within Stipulated Period, calculated from the Date of
LC issued keeping Man Power round the Clock and if required necessary the
additional resourceful are to be mobilized.
(13) The Time Limit per Works / job shall strictly adhere to the Individual Works so
as to Unit can be lighted up within 20 Days after Stopping of the Ist Day of the
Unit. Date of Start of Work will be informed by GSECL well in advance. After Lit-
up of the Unit, Balance Works like Crediting Materials and Cleaning of Area etc.
shall be completed thereafter within 10 Days only.
(14) The Contractor can arrange Pre-Arrangement i.e. Before Shutdown like Shifting
/ Lifting of Materials from Stores to Working Floor and made Available after
Finishing Ready to expedite the Works in Time Limit Schedule. This Advance
Arrangement Period shall not be considered / included in Time Limit Period.
(15) As this being a Risky Job, if any Fatal / Non Fatal Accident or Occurrence
happens, Corporation is not responsible for any kind of Legal Liabilities and
Workmen Compensation; only the Contractual Party is responsible for Legal
Compliance and any Compensation thereof.

17
PUR – F – 023 W – 1721

(16) The Work Executions and its Requirements are to be intimated on Phone by
EIC and Party has to reach the Site within 48 Hours along with Men & Materials
failing to which the Penalty will be imposed as per Decision of Competent
Authority.
(17) The Overall Time Limit for the Work Contract is 11 Month and the Time Limit for
the said Work is 20 Days per Unit during Annual Overhauling Works, 30 Days
for Medium Overhauling Works, 40 Days for the Capital Overhauling Works, 8
Days per Incidents from the Date of Commencement of Works.
(18) Penalty: Any delay that may take place in supply and / or erection, testing and
commissioning activities beyond contractual cut off date / stipulated period in
the order shall be subjected to penalty (not liquidated damages) at the rate of
½% of the contract price / order price per week or part of thereof subject to
maximum of 10% of the total contract value / order value (i.e. End Cost
including taxes and duties).
(19) Performance Guarantee: Thermal Insulation shall be carried out in such a
way that the temperature on top of the insulation/Cladding (Aluminum) shall be
about ambient temperature. If temperature found more, contractor is liable to
re-insulate the same with no extra cost. Final payment will be made only after
confirming satisfactory performance test. For this party shall have to remit 10%
of the total order value as Performance Bank Guarantee.
(20) Submission of Documents: Party shall have to submit verified delivery challan
of materials before starting the work.

GENERAL TERMS & CONDITION:

(1) The Contractor had visited the Site and familiarized themselves thoroughly with
the Site Conditions, Equipments and Systems before submitting the Tender.
For Site Visit, the Tenderers may contact Engineer in Charge of Site Office with
permission of undersigned on any Working Day during Working Hours before
submitting the Tender.
(2) The Materials, Design and Workmanship shall satisfy the relevant Indian
Standard. The Job Specification contained herein and Code referred to where
the join Specification Stipulate Requirements in addition to these contained in
the Standard Code and Specifications, these Additional Requirements shall be
satisfied.
(3) Contractor shall comply with the Factory Acts, Labour Laws and Safety Laws in
force and amended from time to time.
(4) Any other Rules and Regulations, Conditions etc. that are in force at present
and that may be framed by the GSECL from time to time in connection with the
Contracts will be binding and acceptable to the Contractor.
(5) Party has to furnish the Documents for Insurance of Workmen, Labours License
and other Account Section Formalities before starting the Works, failing to
which Contractor shall not be allowed to commence the Work.
(6) If Successful Contractor fails to pay the required Security Deposit and does not
come forward to execute the Work, the full value of EMD paid will be forfeited
by the GSECL.
(7) Party should submit PERT Chart and BAR Chart well in advance and should
get it approved by the Engineer in Charge before Commencement of the Work.
The Work should be positively completed in time. Any Delay will not be
tolerated.

18
PUR – F – 023 W – 1721

(8) The Contractor should authorize the Qualified Authentic Representative to


GSECL who in turn will collect the Material, Works Permit and remains
available at Site to receive instructions from GSECL Engineer in Charge to
execute the Works. All Formalities as per GSECL’s Procedure are to be obeyed
by Representatives of Contractor.
(9) The Contractor should intimate the Names and Addresses of his authorized and
responsible Representative so that they can be contacted when required in
connection with execution of the said Works. The Contractor should also be
present to report the Work daily to Engineer in Charge and receive necessary
instruction. If the Contractor does not remain present then his Contract will be
terminated as Execution can’t be allowed in absence of the Contractor.
(10) No Mobilization time will be given as Shutdown is to be decided looking to the
System Conditions. This will have to be very specifically accepted in writing.
(11) Overhauling / Work Programme shall be drawn up mutually by the GSECL
Engineer and Contractor based on the availability of Work Front and keeping in
view the Scope of Works. The Contractor shall scrupulously adhere to this
Schedule by arranging adequate Skilled Personnel and Working Tools and
Tackles. The Progress achieved against the Work Plan for each day shall be
summarized by the Contractor and he shall submit it as a Daily Progress Report
to the Engineer in Charge positively by 16.00 Hrs. with details of labour
engaged for monitoring the Progress of Work.
(12) Party shall have to complete the Works within stipulated Time Limit by engaging
proper adequate Personnel working round the clock if required. The Works will
have to be commenced immediately on Short Notice as and when shutdown is
arranged and as per GSECL’s Requirement without fail.
(13) For Shifting / Lifting / Transportation of Materials, Mobile Crane, Trailer, Tractor,
Trucks, etc. should be arranged by the Contractor at his cost as GSECL have
no any such Facility available for the Works.
(14) The Party shall have to do all related works as per Site requirement and as per
instruction of Engineer in Charge. Party has to arrange of his own adequate all
types of Tools and Tackles required for the Works including Skilled and
Experienced Engineers, Supervisors, Technicians, Welders, Riggers, Foremen,
Electricians, Helpers for the Continuous Works round the clock to meet
Scheduled Overhauling / Works within Time Limit. Works should be carried out
in proper way and in co-ordination with Each / Other Works / Agency so that
Work should not suffer.
(15) Contractor shall make his Own Full Proof Arrangement of Storage of Spares /
Consumables, Tools Tackles, etc. required for O/H & Works and shall be
responsible for Safe Custody of such items at his Site / Store. In case of Theft /
Lost / Damage of such Items while in possession of Contractor, such Materials
are to be replaced Free of Cost by the Contractor to the GSECL.
(16) Contractor shall indemnify GSECL against for any Injury and / or Damages that
may be caused in his Man or Material. Moreover, the Contractor shall be Fully
Responsible for any Damages caused to the GSECL’s Properties / Men done
by his Man / Materials while executing the Work. The GSECL will be entitled to
recover the Damages from the Party at an Actual.
(17) At any time if GSECL feels that Progress of Works is unsatisfactory and Work
Force of Contractor is inadequate, other Agencies / Departmental Personnel will
be put in parallel for expediting the Works. Amount so incurred will be

19
PUR – F – 023 W – 1721

recovered from the Contractor’s Bill. In this case the Decision of the Engineer in
Charge shall be final and binding to the Contractor.
(18) Whenever Contractor brings Material from Outside the P/H Premises, he must
get an Entry Pass Separate for Tools / Tackles / Machinery and Consumable
Items and he should produce One Copy of Such Entry Pass to Concern
Department for their Verifications / Records.
(19) Party shall submit Material Account along with Bills in Triplicate.
(20) Payment will be made for Actual Work Done only.
(21) GSECL shall provide the Open Space at Appropriate Place in Plant Area
suitable for keeping Materials, Tools, Equipments, etc. and for making
Temporary Office. On Expiry / Completion / Termination of Contract, Contractor
shall have to vacate the Premises immediately after Work completed
satisfactorily otherwise the Rent will be recovered as per GSECL’s Rules if not
vacated in time.
(22) GSECL will try to give Residential Accommodation on Chargeable Basis as per
Rules to the possible extent depending upon the Availability. But this will not be
the Right of Contractor. The Quarter is to be vacated immediately as soon as
the Work is completed satisfactorily.
(23) Subletting the Contract to other Agency is not permitted unless and otherwise
approved by the Competent Authority.
(24) For any Ambiguity and Conflict, the Decision of the Chief Engineer (Gen.),
GSECL, GTPS shall be final and binding to the Contractor.
(25) The GSECL reserves the right to terminate the Contract at any Time without
giving Notice of Termination or any Reason and entertaining of Claims /
Compensations.

CHIEF ENGINEER (GEN)


GSECL: TPS: GANDHINAGAR

Contractor’s Signature
With Seal & Date.

20
PUR – F – 023 W – 1721

GUJARAT STATE ELECTRICITY CORPORATION LTD


THERMAL POWER STATION,
GANDHINAGAR-382 041.
(PART – II)

PRICE BID

Work of Thermal Insulation for Turbines &


W-1721 Various Auxiliaries of 210 MW Units 3, 4 & 5 of
GTPS on As & When Required Basis.

21
PUR – F – 023 W – 1721

Gujarat State Electricity Corporation Limited


Gandhinagar Thermal Power Station
SCHEDULE - B.

NAME OF WORK: Work of Thermal Insulation for Turbines & Various Auxiliaries
of 210 MW Units 3, 4 & 5 of GTPS on As & When Required
Basis.

Sr. Rate Amount


Description Quantity Unit
No. (Rs) (Rs)
Charges for Removal and
Disposal of Old Insulation,
Sheeting Materials, Hooks,
Insulation Retainers, Lacing
Wire, Mattresses Fixing Square
1 1850 20 37000
Plates, Self Tapping Sheet Meter
Metal Screws etc. from
various Pipes, Valves,
Fittings, etc. as per Scope of
Works of Schedule A.
Charges for Supply of 50
mm Thick Fresh LRB
Mineral/Rock Wool
Mattresses of Density 150 Square
2 750 105.45 79087.5
Kg/M3 with Hooks, Meter
Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A.
Charges for Application of
50 mm Thick Fresh LRB
Mineral/Rock Wool
Mattresses of Density 150 Square
3 750 45.19 33892.5
Kg/M3 with Hooks, Meter
Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A.
Charges for Supply of 100
mm Thick Fresh LRB
Mineral/Rock Wool
Mattresses of Density 150 Square
4 400 176.41 70564
Kg/M3 with Hooks, Meter
Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A.
Charges for Application of
100 mm Thick Fresh LRB Square
5 400 75.6 30240
Mineral/Rock Wool Meter
Mattresses of Density 150

22
PUR – F – 023 W – 1721

Kg/M3 with Hooks,


Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A.
Charges for Supply of 150
mm Fresh LRB Mineral/Rock
Wool Mattresses of Density
Square
6 150 Thick Kg/M3 with Hooks, 400 211.47 84588
Meter
Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A.
Charges for Application of
150 mm Fresh LRB
Mineral/Rock Wool
Mattresses of Density 150 Square
7 400 90.63 36252
Thick Kg/M3 with Hooks, Meter
Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A.
Charges for Supply of 200
mm Fresh LRB Mineral/Rock
Wool Mattresses of Density
Square
8 150 Thick Kg/M3 with Hooks, 300 281.96 84588
Meter
Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A
Charges for Application of
200 mm Fresh LRB
Mineral/Rock Wool
Mattresses of Density 150 Square
9 300 120.84 36252
Thick Kg/M3 with Hooks, Meter
Insulation Retainers, Lacing
Wire etc. as per Scope of
Works of Schedule A.
Charges for Supply of 0.71
mm Thick New Aluminium
Sheet, Mattresses Fixing
Plates, Sealant, Insulating
Cement, Bituminous Paints, Square
10 1850 157.05 290542.5
Self Tapping Sheet Metal Meter
Screws, Any Other Materials
required to complete the
Works as per Scope of
Works of Schedule A.
Charges for Application of
0.71 mm Thick New
Aluminium Sheet, Square
11 1850 67.31 124523.5
Mattresses Fixing Plates, Meter
Sealant, Insulating Cement,
Bituminous Paints, Self

23
PUR – F – 023 W – 1721

Tapping Sheet Metal


Screws, Any Other Materials
required to complete the
Works as per Scope of
Works of Schedule A.
Charges for Application of
Old Reusable Plain /
Trapezoidal Aluminum / GI
Sheet with Mattresses Fixing
Square
12 Plates, Sealant, Insulating 500 60 30000
Meter
Cement, Bituminous Paints,
Self Tapping Sheet Metal
Screws etc. as per Scope of
Works of Schedule A.
Total (Rs. Nine Lakh Thirty Seven Thousand Five Hundred Thirty
937530
Only)

Note:
(1) Over Writing while filling the Rates in this Schedule-B is not permitted and if any
over Writing is there, Tender can be rejected.
(2) The Order will be placed on Overall Lowest Party.
(3) The Estimated Quantity is on Approximation Basis and estimated for Turbine &
Various Auxiliaries of 210 MW Units 3, 4 & 5.
(4) The Actual Works are to be carried out as per Instruction of EIC.
(5) The Payment shall be made for Actual Work carried out to suit the Site
Conditions only. Balance Unexecuted Quantity will be treated as cancelled.

CHIEF ENGINEER (GEN)


GSECL: TPS: GANDHINAGAR

(1) My / Our offer is _____________%age higher or ______________%age lower


than the above estimated cost (%age should be written in figures and words)
____________________________________________________
(2) The above estimated rates are exclusive of service tax hence same will be
paid extra by GSECL at prevailing rate as applicable subject to provide
service tax registration No & copy thereof.
(3) The tender received after time and date specified in the tender notice, will not
be accepted. Once the offer submitted by the contractor before due date of
submission, the contractor will not be allowed to submit revised /
additional/modified/ other after opening of technical bid.
(4) All commercial terms and condition along with price schedule is invariably
indicated in price bid only.
(5) The contractor shall have to submit the attested copy of EPF code No.
certificate received from RPFC without fail otherwise tender will not be
considered.
(6) All the bidders are requested to see and verify the documents of

24
PUR – F – 023 W – 1721

(a) General safety rules / norms” to be observed by the contractors


(b) Additional terms and conditions regarding industrial law and other
related matters for the tender documents.
(c) General rules and directions for the guidance of contractor booklet of
GSECL, GTPS on our website under heading of “Rules for Works”

And confirm that all the above documents you have verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules,
Industrial Laws and Contract Booklet (a, b & c as above) and accordingly
submitted my/our offer.”

Contractor’s Signature
With Seal & Date.

25