28 Glue the embellishments on the lengthwise bulkheads
175 and 177 and the embellishments on the transverse
bulkheads 176 and 178 on both sides of the previously
painted wardrooms. Fit the upper frames in the bow
wardroom 179 and 180 and the ends of the ceiling 181and
182. Fit the lower frames 183 and 184 and the skirting 185
190 and 186 in the bow wardroom. Glue the six portholes 80
(three on each side), glue the ceiling lining 187 and the
columns 188 in the bow wardroom. Carry out the same
192 195 operation with the parts 189, 190, 191, 192, 193, 194, 195,
196, 197, 198 and 80 for the central wardroom.
80
194 189
80 198
196 198 193 191
29 Bow and central wardooms, continued
29 With the parts 199, 200, 201, 202, 26
and 80, mount the six doors on the bow
26
199
205 205
204
203 26
26
203
Mainmast pin-rails, bilge pump, storeroom and cages
30
109
154
211
110
diam. 0.8mm
234
234
230
231
231
231
236
233 234
237
231
231
235 232
Boat davits, wardroom on the bridgedeck and skylight opening
31
110
diam. 2mm 26 diam. 0.8mm
diam.
1.5mm
diam. 1.5mm
212 238a
109
diam.
0.8mm
109 155
212 238
240
239 80
80
248
252
247 80
31 Glue the central wardroom, the storeroom, the two cages and the two stairs on the bridgedeck. Glue the mizzen masthole 155, and around this
make five holes 0.8mm in diameter to fit the eyebolts 109. Make the holes indicated in the photo to fit the four boat davits 238. With the 2mm
brass straping 238a, make the hinges for the boat davits and fix the boat davits to the inside of the gunwale covers with the nails 26. Glue the bitts 110
to port and starboard. With parts 239, 240, 241, 242, 243, 244, 245, 246, 247, 248, 249, 250, 251, 252, 253, 254 and 80 build the wardroom on the
bridgedeck. First, stain parts 243, 244, 245, 247, 248, 249, 251 and 252. With the parts 255, 256 and 257 build and stain the skylight opening. Cut the
six pieces of glass 258 and glue them on the inside of the skylight.
Water barrels and bridgedeck finish
32 260 262
264
26
259 259
10m
m
21m
m
114 21m
m
21m
m
21m
m
115 10m
m
diam. 0.5mm
265
266 93
267
117
269 270 268
118 diam. 1mm
273
272
278
13mm
13mm
275 277
274 276
271
32 Make a 2mm-diameter hole in the upper part of the water barrels 259, and use black paint to simulate the reinforcing rings around it. From
a 4mm-diameter rod, cut the pieces to make the barrel lids 260, and glue them as shown in the photo. Make the barrel handles 261 from
the 0.5mm-diameter brass wire. With the parts 262, 263, 264 and 26, build the two doors for the bridgedeck wardroom. Glue the skylight and the
battens forming the sliding door on the hood 265 of the bridgedeck. Following the measurements indicated, make 1mm-diameter holes to fit the
belaying pins 117 for the handrails. Insert the handrails 118. Glue the barrels 259 and, on both sides, make 0.5mm-diameter holes to fit the
eyebolts 93. Fasten the barrels with the lashing 266. Glue parts 114, 115, 267, 268, 269 and 270. With the parts 271, 272, 273, 274 and 275, build
the rudder wheel table. With parts 276, 277 and 278 build the stern grating.
Water barrels and stern deck finish, continued
33
282
18
mm
m
281
m
15
110
33 Glue the bitts 110 and the boom support 279. Fit the eyebolts 109
to port and starboard. With the parts 280, 281 and 282 build the
stern hatch, following the measurements given.