Beruflich Dokumente
Kultur Dokumente
1mm
44 diam. 6mm 109
332
332
44 Make the foremast and mainmast, starting with their 8mm-
diameter lower parts 331 and 340. In both 331 and 340, fit
the jaws 332, the cheeks 333, the tops 334, the ends of the bases
on the mainmast 335, the lugs 336, the caps 338, the small rings
340 109 108, the large eyebolts 109 and the 4mm blocks 343. In the parts
of the mainmasts 337 and 342, make 1mm-diameter holes, and in
the lower mainmast 340 fit the seven eyebolts 109 to the brass
stay 341. In the two circular pin-rails 339, drill the six 1mm-
diameter holes in which to fit the metal belay pins 103 and insert
these into the lowermast of the foresail 331 and of the mainsail
331 340. Paint the masts ivory, as shown in the photographs.
341 We recommend that you follow the mast, rigging and sail plans
when building these parts.
342
337
335 335 109
334
334
109 108 333
108
333
332 332
340
331
339
Mainmast and foremast, continued, and mizzenmast
45 351 349
diam.1mm
diam.1mm
344
diam. 4mm
109 348 348 108 343 345 358 108 343
46 Mizzenmast, continued, and fitting the three masts
46 Make the mizzenmast, starting with the 6mm-
diameter lower piece 352 and the 5mm-diameter
352
109
358
diam. 5mm
357
108
353
108
343 343
356 103
335
350
347 151
93
342
337
358
340
352 331
87˚ 87˚
87˚
Bowsprit, bowsprit bobstays and shrouds diam. 1mm
47 371 373
372 374
a 374 374
108
375 108
374
376
109 375
108
108
375
108
376 108 109 375 374 108 375
47 Build the bowsprit 363, the boom 364, the bowsprit cap 365, the
bowsprit hoop 366, the dolphin boom 367, the bowsprit hoop
368, the pulleys 369, the braces for the boom footropes 370, the braces
109 375 108
378 108 108
for the boom bobstays 371, the raw cotton thread 372 to make the 377
footropes, the boom hoops 373, the hooks for the dolphin boom 374, 108
the rings 108, the eyebolts 109 and the 4mm blocks 343. On the
bowsprit 363 and the boom 364, make 1mm-diameter holes and paint
the entire unit ivory, as shown in the photographs. With the chain 375,
make the rings 108 and the bow stanchions 376. Make the boom 109
bobstays (red arrows). With the brass wire 375, make the rings 108 and 108
109
with the black 0.15mm-diameter thread 377 make the bowsprit shrouds 108
(green arrows). With the medium brown 0.5mm-diameter thread 378 378
make the foresail guys (yellow arrows). 109
378
Refer to the rigging plans.
Lower rigging and ratlines
48 379
380
308
308 99 99
308
379
379 379
308
334
334
334
379 379
379
380
380
308 99
100
384
100
103 103
384
381
2x2mm 5mm
332 308
353
49 Tie the small clump blocks 100 to the second ratlines with the fine
raw thread 308. In the mizzenmast rigging pin-rails 382, make five
sockets in which to fit the rigging and, between them, 1.2mm-diameter
holes in which to fit the belay pins 103. Cover the gaps with the batten
100 383 and paint the entire unit white. Rig the lower clump blocks 100 with
the medium black cotton thread 384 and insert them into the tops to the
381 mainmast futtocks. Join the lower to the upper clump blocks by means of
5mm 384 the lanyards made with the fine raw thread 308 and make the mainmast
rigging with the medium black cotton thread 384, from the upper clump
blocks to over the crosstrees. Tie the ratlines with the fine black cotton
308 thread 381 and paint the first of these white (green arrow). Make the
5mm 381 topgallant ladders by rigging the lower clump blocks 100 with the medium
black cotton thread 384 and inserting them through the holes in the
384 100 crosstrees to form the futtocks on the topgallants. Join both clump blocks
in the same manner as the mainmast ladders and make the small rigging
with the thread 384, tying the ratlines with the thread 381.
308
378
308
385
100
378 338
308 385
108
385
308
339
308
386
308
386
386
339
109
50 Mizzenmast stays, continued
50 Continued (See previous page)
308
385
308
385
Mainmast stays
51
308
308
153
308
308 338
378
308
385
378
346
100
308 308
385
385 338
378
100 109
109 109
378 338 308
108
51 Rig the two stays on the mainmast (yellow arrows) with the thick brown thread 385, tying them on their upper end to the mainmast with the
fine raw thread 308 (to be painted white) and, on its lower part, making two lanyards with the same thread 308 and tying them to the eyebolts
109 located on the deck with the rings 108. Rig the two topsail yards (red arrows) with the thick brown thread 385, tying them on their upper part to
the main and topgallant mast of the mainmast with the fine raw thread 308 (to be painted white) and, on its lower part, making two lanyards with the
thread 308 and tying them to the eyebolts 109, located on the deck with the rings 108. Make the royal staysail stays (blue arrows), the main royal stays
on the mainmast (green arrows) and the moonsail (violet arrows). With the brown threads 378 and 153, tie them on their upper part to the topgallant
with the fine raw thread 308 (to be painted white), threading them through the holes for the foresail caps 338 and 346 and through a clump block 100
fitted on the mainmast foretop where a 1.5mm-diameter hole is made, tying off on the lanyards 308 and, in turn, in the eyebolts 109 located behind the
foresail yard. (See next page to complete this operation.)
51 Mainmast stays, continued
51 Continued (See previous page)
378
385
308
385
308
385
385
308
385
308
299
308
385
308 385
369
299
108 385
308
369 308 303
152
69
308 108
109
308 308
153
308
308
378
153
308
378
378
299 308
385
308
308
378
385
385
369 308
299
367 109
Always use the rigging and mast plans in conjunction with these
153 step-by-step instructions.
378
109
367