2. Review of Design Sheet, 3. Review of Conceptual Design prepared during EIA study 4. Review of geotechnical investigation report prepared during conceptual design, 5. Review Final design report of Banchare Danda Landfill site, 6. Recommend appropriate liner system, Leachate collection and treatment system and landfill gas management system along with service and ancillary facilities required, 7. Preparation of Operational Manual for effective operation of sanitary landfill site.