Beruflich Dokumente
Kultur Dokumente
Temperature At Time of
60-100°F 40-60°F 20-40°F 0-20°F
Assembly
Pipe Diameter
Watch out: in damp or humid weather you need to increase the set and cure times by 50%!
Watch out: for an accurate figure on PVC glue drying time for your specific case, be sure to
check the label of your particular CPVC or PVC pipe cement product.
1/2" - 1 1/4" 1 2 6 8
1 1/2" - 3" 2 4 12 16