Ø Discrete
Ø Repetitive
Ø PP-PI
Discrete manufacturing:-
Repetitive manufacturing:-
Ø Bill Of Material
Ø Work center,
Ø Routing
Example:-
Ø Setup time
Ø Machining time
Ø Labor Hours
Ø Depreciation
Values of above activities are captured through the
standard value key.
Yes.
Note:-
Ø VSF for 40
Ø LSF for 10
Ø BSF for 11
Ø 10 Reschedule IN
Ø 20 –cancel process
Ø 25 – excess stock
Ø 50 – No BOM exist
Ø Planning strategy,
Ø Consumption mode
Ø confirmation parameter
Ø scheduling parameter
If the start date lies in the past, then system will start
the forward scheduling from the current date and
arrive at the possible finish date.
53. What is capacity leveling?
54. Certain production order start date and end dates are
already finalized and it should not be allowed to
reschedule after release. How do you map it?
Ø Material master
Ø Work center
Ø Routing.
First at Routing
58. Have you come across any User exit in your previous
projects?
It is collective order.
Ø CO – Controlling
Ø MM – Materials Management
Ø QM – Quality Management
Mainly through
Valuation variant:-
Costing variant:-
Ø ND refers to No planning
Yes.
By quota arrangement.
OPU3
Normal way is
Ø Sampling scheme
Ø Sampling procedure,
Ø Inspection Method,
Ø Selected Set
Ø Inspection Plan
Ø Notification processing
Example:-
Ø Usage decision,
Ø Defects,
Yes.
Yes.
Yes.
Ø Material,
Ø Vendor
Ø Plant.
Ø Source Inspection
Yes,
Yes.
Stock relevant
Yes.
Yes
No.